Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹64.2 LAdmitted-Finance H NO 384 SHIVALIK PURAM JANIPUR COLONY JAMMU | L1 | Admitted-Finance | |
| 2 | L2₹67.3 L+₹3.1 L (4.76%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹68.5 L+₹4.3 L (6.75%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹71.8 L+₹7.6 L (11.8%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹81.2 L+₹16.9 L (26.4%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | VINAY CONSTRUCTION COMPANY L4 | M/s Swami Raj L5 | Vivek Gupta L1 | FAROOQ AHMED TRAGWAL L3 | SHRI KHALID HUSSAIN SHEIKH L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc (not exceeding 1.5m in width) and for shafts, wells, cesspits and the like not exceeding 10sqm. On plan, including dressing of sides and ramming of bottoms lift upto 1.5m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 meters all kind of soil (including all carriages). | 525.6 | Cum | 144 ₹75,686.4 Lowest | 500 ₹2,62,800 | 500 ₹2,62,800 | 400 ₹2,10,240 | 250 ₹1,31,400 |
| 2.00 | Providing & Laying concrete of specified grade excluding cost of shuttering all work, upto plinth level (including all carriages)
1:5:10 mix (1 cement 5 coarse sand & 10 Graded stone aggregate 40mm nominal size) (including all carriages). | 87.6 | Cum | 5,732 ₹5,02,123.2 | 4,000 ₹3,50,400 | 100 ₹8,760 Lowest | 3,000 ₹2,62,800 | 3,800 ₹3,32,880 |
| 2.01 | 1:3:6 (1 cement 3 coarse sand & 6 Graded stone aggregate 20mm nominal size) Foundation & plinth (including all carriages). | 584 | Cum | 6,495 ₹37,93,080 | 4,700 ₹27,44,800 Lowest | 5,000 ₹29,20,000 | 6,000 ₹35,04,000 | 6,000 ₹35,04,000 |
| 3.00 | 12MM thick plaster in C.M 1:6………… (including all carriages). | 1,752 | Sqm | 215 ₹3,76,680 | 300 ₹5,25,600 | 1 ₹1,752 Lowest | 200 ₹3,50,400 | 190 ₹3,32,880 |
| 4.00 | Providing and laying DPC 40MM thick in 1:2:4 (including all carriages). | 438 | Sqm | 360 ₹1,57,680 | 300 ₹1,31,400 | 1 ₹438 Lowest | 250 ₹1,09,500 | 100 ₹43,800 |
| 5.00 | Supplying at Site angle iron post and strut of required size including bottom to be split and bend at right angles in opposite direction for 10Cm length and drilling holes upto 10mm dia etc. complete (including all carriages). | 7,897.49 | Kg | 109 ₹8,60,826.41 | 105 ₹8,29,236.45 Lowest | 150 ₹11,84,623.5 | 110 ₹8,68,723.9 | 105 ₹8,29,236.45 Lowest |
| 6.00 | Providing and fixing G.I. chain link fencing of required width in mesh size 50x50 mm including strengthening with 2mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-in-charge. Made of G.I. wire of dia 4mm (including all carriages). | 2,190 | Sqm | 560 ₹12,26,400 | 750 ₹16,42,500 | 750 ₹16,42,500 | 650 ₹14,23,500 | 530 ₹11,60,700 Lowest |
| 7.00 | Centering and shuttering including removal of formwork foundations (including all carriages). | 1,752 | Sqm | 57 ₹99,864 | 300 ₹5,25,600 | 200 ₹3,50,400 | 10 ₹17,520 Lowest | 180 ₹3,15,360 |
| 8.00 | Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38kg per 100 m (minimum), between the two posts fitted and fixed G.I. staples, turn buckles etc. complete. (cost of posts, struts, earth work and concrete work to be pid for separately). Payment to be made per meter cost of total length of barbed wire used. With G.I. Barbed wire (including all carriages). | 4,350 | M | 13 ₹56,550 | 160 ₹6,96,000 | 2 ₹8,700 Lowest | 20 ₹87,000 | 10 ₹43,500 |
| 9.00 | Engagement of welder and welding set with helper and generator set to weld up flat with nut bolt comp (including all carriages). | 4,067 | No. | 7 ₹28,469 | 100 ₹4,06,700 | 10 ₹40,670 | 5 ₹20,335 Lowest | 8 ₹32,536 |
Tender Value
Refer Docs
EMD Value
₹1.4 L
Closing Date
13 Feb 2023, 4:00 pmClosed
AGNINDER BAKSHI
O/o EXECUTIVE ENGINEER, JKSIDCO CONSTRUCTION DIVISION, BARI BARHAMANA
Providing Chain Link Fencing to the Periphery of New Industrial Estate at Village New Mand 553 K Distt Udhampur Length 1460Mtrs -3rd call.
2023_SIDCO_204487_1
E- NIT No 13 of 2022-23 Dt 30.01.2023
Open Tender
Civil Works
Item Rate
45 days
MAND UDHAMPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,500
Yes
Executive Engineer, Construction Division
₹1.4 L
Yes
16 Feb 2023
7 Feb 2023
14 Feb 2023
7 Feb 2023
13 Feb 2023
7 Feb 2023
Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc (not exceeding 1.5m in width) and for shafts, wells, cesspits and the like not exceeding 10sqm. On plan, including dressing of sides and ramming of bottoms lift upto 1.5m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 meters all kind of soil (including all carriages).
Providing & Laying concrete of specified grade excluding cost of shuttering all work, upto plinth level (including all carriages) 1:5:10 mix (1 cement 5 coarse sand & 10 Graded stone aggregate 40mm nominal size) (including all carriages).
1:3:6 (1 cement 3 coarse sand & 6 Graded stone aggregate 20mm nominal size) Foundation & plinth (including all carriages).
12MM thick plaster in C.M 1:6………… (including all carriages).
Providing and laying DPC 40MM thick in 1:2:4 (including all carriages).
Supplying at Site angle iron post and strut of required size including bottom to be split and bend at right angles in opposite direction for 10Cm length and drilling holes upto 10mm dia etc. complete (including all carriages).
Providing and fixing G.I. chain link fencing of required width in mesh size 50x50 mm including strengthening with 2mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-in-charge. Made of G.I. wire of dia 4mm (including all carriages).
Centering and shuttering including removal of formwork foundations (including all carriages).
Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38kg per 100 m (minimum), between the two posts fitted and fixed G.I. staples, turn buckles etc. complete. (cost of posts, struts, earth work and concrete work to be pid for separately). Payment to be made per meter cost of total length of barbed wire used. With G.I. Barbed wire (including all carriages).
Engagement of welder and welding set with helper and generator set to weld up flat with nut bolt comp (including all carriages).
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .