Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 LAdmitted-Finance NEAR RELIANCE PETROL PUMP RAMGARH CANTT 829122 DIST RAMGARH JHARKHAND | RAMGARH CANTT | RAMGARH | JHARKHAND | 829122 | ₹2.1 L | L1 | Admitted-Finance |
| 2 | L2₹2.2 LAdmitted-Finance AT MAIN ROAD KATHARA PO KATHARA BOKARO JHARKHAND 829116 | BOKARO | JHARKHAND | 829116 | ₹2.2 L | L2 | Admitted-Finance |
| 3 | Rejected-Technical MAIN ROAD RAMGARH CANTT 829122 | RAMGARH | RAMGARH | JHARKHAND | 829122 | - | - | Rejected-Technical Rejected |
| Sl No | Description | Qty | Unit | M/S. PAWAN KUMAR L2 | Rajneesh Electricals L1 |
|---|---|---|---|---|---|
| 2.01Transformer Reapiring 160KVA, 11KV/440V | |||||
| 2.02 | Cost of 15 no SWG Copper Wire(rate after deducting 60% of old copper wire) | 128 | KG | 514 ₹65,792 | 487 ₹62,336 |
| 2.03 | cost of insulating material which is 15% of sl no 1 (without deducting the 60% for old copper wire) | 1 | Nos. | 24,672 ₹24,672 | 23,366 ₹23,366 |
| 2.04 | Labour Cost @ 15% of Sl no 1 (without deducting the 60% for old copper wire | 1 | Nos. | 24,672 ₹24,672 | 23,366 ₹23,366 |
| 2.05 | Profit @ 10% | 1 | Nos. | 11,514 ₹11,514 | 10,900 ₹10,900 |
| 2.06 | Supplying and fixing LV Side transformer Bushing | 1 | Nos. | 12,000 ₹12,000 | 9,200 ₹9,200 |
| 2.07 | Supplying and fixing HV Side transformer Bushing | 3 | Nos. | 17,000 ₹51,000 | 15,250 ₹45,750 |
| 3.00 | Total impact of GST for the purpose of CTC | 1 | Nos | 34,137 ₹34,137 | 31,485.24 ₹31,485.24 |
Tender Value
₹2.1 L
EMD Value
₹2,600
Closing Date
27 Dec 2025, 4:00 pmClosed
PROJECT OFFICER
OFFICE OF PROJECT OFFICER RR SHOP JARANGDIH
Repairing of 160 KVA, 11 KV/440 Volt transformer located at colony no 3 of RR Shop Jarangdih
2025_CCL_349470_1
CCL/KTA/RRS-JRD/NIT/2025-26/04
Open Tender
Electrical and Maintenance Works
10 days
Colony no 3 of RR Shop jarangdih
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,600
Yes
30 Mar 2026
17 Dec 2025
29 Dec 2025
17 Dec 2025
27 Dec 2025
17 Dec 2025
17 Dec 2025 - 25 Dec 2025
Transformer Reapiring 160KVA, 11KV/440V
Cost of 15 no SWG Copper Wire(rate after deducting 60% of old copper wire)
cost of insulating material which is 15% of sl no 1 (without deducting the 60% for old copper wire)
Labour Cost @ 15% of Sl no 1 (without deducting the 60% for old copper wire
Profit @ 10%
Supplying and fixing LV Side transformer Bushing
Supplying and fixing HV Side transformer Bushing
Total impact of GST for the purpose of CTC
stage.html
html • 0.03 MB
technical_362215.pdf
techsummary_362215.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.25 MB
BOQ_362215.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid