Er Surinder Kumar Sharma
Office of EE2 WSSD Gurdaspur
Water Supply Scheme Gill etc 2 Nos Block Kahnuwan District Gurdaspur UNDER PRWSSIP COMPONENT 2 A i
2019_WB_40778_1
Gill 2019 2A-i
Open Tender
Civil Works
Item Wise
180 days
In Village Gill
Please refer Tender documents.
2 documents required · 2 mandatory
₹100
TIA
₹21,638
28 Jan 2020
21 Nov 2019
13 Dec 2019
21 Nov 2019
12 Dec 2019
21 Nov 2019
Amount
Repair of Pump Chamber Floor
Conglomerate floor 50mm thick cement concrete rate 1:2:4 on 100mm thick cement concrete 1:8:16 and 100mm sand filling
Providing and fixing of Glass strips 4mm thick in floors
50mm wide
40mm wide
White Wash & Painting of PUMP CHAMBER
Applying Pink Primer or-aluminium priming coat including preparation of surface With special quality paint
Painting two coats excluding priming coat with ready mixed paint in all shades on new wood work With special
White washing 3 coats inside of pump chamber.
Finishing wall with exterior decorative cement based paint such as snowcem robbiacem etc. on new work in two coats to give even shade.
Preparation of plastered surfaces for distempering including surface, applying filling with approved quality filler consisting of plaster of Paris and chalk mitti including finishing the surface to the required finish complete. Inside pump Chamber.
Distempering with dry distemper of approved manufacture two coats over one priming coat to give an even shade
Plinth Protection of OHSR 25000 ltr capacity complete in all respects
Repair of Expension Joint of 25000 ltr OHSR (100mm i/d)
DEVELOPMENT OF WATER WORKS SITE.
Providing & fixing 1.2mtr high fencing around the head works site with 1.65 meter post, placed every 2.5 meters apart, embedded in cement concrete blocks and every tenth post to be strutted with three rows of G.I. Barbed wire weighing 9.34 Kg per 100 meters (minimum) and fixing with GI staples tied to 6mm bar nib, with binding wire or by providing cut, including drilling holes in the post, including cost of posts, winding wire, strutted earth work in the post & aluminum painting complete in all respects as per DWSS standard Drawing .
Construction of Corner Pillar etc, complete in all respect at water works site.
Construction of Foot Path with masonry toe wall & earth filling and Cement Concrete 1:8:16 with 40 mm gauge stone aggregate, 40 mm thick cement concrete topping 1:2:4, inside water works as per DWSS standard
Disinfection Unit:
Providing Installing testing and commissioning and one no. electronically actuated, diaphragm operated, metering system, chemical dosing chlorinator, suitable for delivering 0.5 to 6 leter of bleaching powder solution /sodium hypo solution per hrs under maximum deliver pressure upto 7kg/cm2 and suction left not less than 1.5 meter. ( Milton Roy or Equivalent Make )
Connection for New pipe line with existing pipe line
Repair of pipe line to remove the leakage including bailing of water and required jointing materials complete in all respects
New Automatic Control Device
Water Connection
Providing proposed water connection to house hold up to wall with providing laying , jointing, testing MDPE pipe line 15mm o/d 2 mtr & GI 15mm i/d 2.50 mtr, including cost of specials such as tees, bends, sockets, elbow etc, cutting threading and testing in trenches in the ground and ISI marked 15mm i/d GN ferrule as oer IS:2692 and 3'' i/d clamp with C.I. bib cock 15mm i/d as per IS:210 with stainless steel spindle of approved make as per CSR 30.65(b) complete with excavation
Excavation manually in trenches for pipe lines with straight or open cutting in streets and lanes in builtup area where width of street / Lane from wall to wall is less than 3 meter including trimming and dressing sides levelling of beds of trenches to correct grade, cutting joint holes, refilling consolidation,watering, including the cost of dewatering of rain water, diversion for traffic, night signals. Providing & fixing caution boards, watching, fencing, etc. and removal of surplus soil from the site upto 15 meter distance complete in all respects.
Dismantling and restoration of Cement Concrete Road complete in all respect as per DWSS specifications
Dismantling and restoration brick paving complete in all respect as per DWSS specifications
PVC Pipe 63mm o/d
Construction of masonry sluice valve chamber size 0.90m x 0.90m as per DWSS standard (At Water Works)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .