Tender ID
Tender Value
₹4.2 L
EMD Value
₹1,000
Closing Date
17 Apr 2026, 5:00 pmClosed
ANKIT VASHISHT
Municipal Council Rewari
Construction of Boundary Wall in Jogi Dharamshala Ward No 31 MC Rewari
2026_HRY_514302_1
202635133E67 81A4 4C09 BF37 E328E1700814295ULB
Open Tender
Civil Works
Works
75 days
Rewari
2 documents required · 2 mandatory
₹8,439
₹1,000
Yes
10 Apr 2026
10 Apr 2026
20 Apr 2026
10 Apr 2026
17 Apr 2026
10 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | HSR Item 6.33.6-Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps.
Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more
HSR Rate(Rs.) 66.00 Through Rate | 1 | Kg. | - | - |
| 2 | HSR Item 11.71.1-Wall painting on a cement plaster surface with acrylic emulsion paint of approved brand and manufacture to give an even shade : 1. Two or more coats on new work
HSR Rate(Rs.) 54.00 Through Rate | - | Sqm | - | - |
| 3 | HSR Item 6.30.6-Centering and shuttering including strutting, propping etc. and removal of form for 6. Columns, Pillars, Piers, Abutments, Posts and Struts
HSR Rate(Rs.) 262.00 Through Rate | 1 | Sqm | - | - |
| 4 | HSR Item 6.15.1-Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor four level, excluding cost of centering, shuttering, finishing and reinforcement : 1. 1:1.5:3 (1 cement : 1.5 coarse sand(zone- III) : 3 graded stone aggregate 20 mm nominal size)
HSR Rate(Rs.) 5969.00 Through Rate | 1 | cum | - | - |
| 5 | HSR Item 7.22.1-Brick work with common burnt clay non- modular bricks of class designation 10.5 in superstructure above plinth level up to floor IV level in all shapes and sizes in
: 1. Cement mortar 1:4 (1 cement : 4 coarse sand)
HSR Rate(Rs.) 4404.00 Through Rate | 1 | cum | - | - |
| 6 | HSR Item 5.70-Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in- charge, beyond 50 m initial lead, for all leads including all lifts involved.
HSR Rate(Rs.) 86.00 Through Rate | - | cum | - | - |
| 7 | HSR Item 4.12.1-Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer- in-charge. 1. All kinds of soil
HSR Rate(Rs.) 78.00 Through Rate | - | cum | - | - |
| 8 | HSR Item 6.14.1-Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1. 1:1.5:3 (1 cement : 1.5 coarse sand (zone- III): 3 graded stone aggregate 20 mm nominal size)
HSR Rate(Rs.) 4374.00 Through Rate | - | cum | - | - |
| 9 | HSR Item 5.7.4-Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. 4. In cement mortar HSR Rate(Rs.) 585.00 Through Rate | 1 | cum | - | - |
| 10 | HSR Item 6.30.1-Centering and shuttering including strutting, propping etc. and removal of form for 1. Foundations, footings, bases of columns, etc. for mass concrete
HSR Rate(Rs.) 156.00 Through Rate | - | Sqm | - | - |
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.20 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
BOQ_593128.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .