Tender Value
₹59.8 L
EMD Value
₹1.2 L
Closing Date
11 Aug 2026, 6:55 pmClosed
DCF(WL), BIKANER
DCF(WL), BIKANER
NIB for construction of boundary wall at jorbeer gadhwala conservation reserve area
2026_FORES_578323_1
2716 dated 25/07/2026
Open Tender
Construction Works
Percentage
120 days
BIKANER
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
EGRAS
₹1.2 L
Yes
28 Jul 2026
28 Jul 2026
12 Aug 2026
28 Jul 2026
11 Aug 2026
28 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Habitat Improvement inside of the protected areas (Construction of Boundary Wall) | |||||
| 1.01 | PWD BSR 2022 1/1.31
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared.
1 x 1480 x 2 = 2960 sqm | 2,960 | SQM | 5 | ₹14,800 |
| 1.02 | (PWD BSR 2022) 1/1.6
Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5 m , disposed earth to be levelled and neatly dressed : All kinds of soil
Wall- 1480 x 0.60 x 0.60 = 532.80 cum | 532.8 | cum | 175 | ₹93,240 |
| 1.03 | PWD BSR 2022 3/3.1.7
Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:5:10 aggregate 40 mm nominal size).
Wall- 1480 x 0.60 x 0.15 = 133.20 cum | 133.2 | cum | 2,956 | ₹3,93,739.2 |
| 1.04 | PWD BSR 2022 5/5.1.1
Brick work with F.P.S. bricks of class designation 75 in foundation and plinth with bricks : Cement mortar 1 : 4
(A) 1 x 1480 x 0.45 x 0.15 = 99.90 cum
(B) 1 x 1480 x 0.35 x 0.30 = 155.40 cum
Total = 99.90 + 155.40 = 255.30 cum | 255.3 | CUM | 4,469 | ₹11,40,935.7 |
| 1.05 | PWD BSR 2022 5/5.2.1
Brick work with F.P.S. bricks of class designation 75 in superstructure above plinth level upto floor V level in all shapes and sizes in : Cement mortar 1 : 4 (1 cement : 4 coarse sand)
(A) Pillar - 296 x 0.35 x 0.35 x 1.80 = 65.26 cum
(B) wall - 1 x 1376.40 x 0.23 x 1.80 = 569.82 cum
Total = 65.26 + 569.82 = 635.08 cum | 635.08 | cum | 5,196 | ₹32,99,875.68 |
| 1.06 | PWD BSR 2022 3/3.7.1
Providing and laying damp proof course with cement concrete Grade m-150 (1:2:4) mortar prepared with 1% solution of water proof compound complete as per specification 50 mm thick
(A) Pillar - 296 x 0.35 x 0.35 = 36.26 cum
(B) wall - 1 x 1376.40 x 0.23 = 316.57 cum
Total = 36.26 + 316.57 = 352.83 cum | 352.83 | cum | 391 | ₹1,37,956.53 |
| 1.07 | PWD BSR 2022 12/12.2.3
Plaster on new surface on walls in cement sand mortar 1:4 including racking of joints etc. complete fine finish : 12 mm thick
(A) Pillar - 592 x 0.35 x 1.80 = 372.96 sqm
(B) Pillar side - 1184 x 0.063 x 1.80 = 134.26 sqm
(C) wall - 2 x 1376.40 x 1.80 = 4955.04 sqm
Total = 372.96 + 134.26 + 4955.04 = 5462.26 sqm | 5,462.26 | SQM | 163 | ₹8,90,348.38 |
| 1.08 | Total 5970895.49 | - | - | - | - |
| 1.09 | NON BSR
Construction Detail & Work Name Paint Every 500 mtr. by Enmal Paint including labour & material all charges. As Per site incharge. Paint Size 1 x 1.25 mtr. | 3 | Nos | 2,000 | ₹6,000 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
BOQ_1027792.xls
BOQ • 0.34 MB
DOCS11.pdf
Tender Documents • 8.59 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .