| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.1 CrAccepted-AOC | ₹7.1 Cr Quoted ₹7.2 Cr | L1 | Accepted-AOC Accepted |
| 2 | L2₹7.3 CrRejected-AOC NO 123 1ST STREET URC NAGAR CHINNA SENGODAMPALAYAM ERODE DISTRICT 638 012 | CHINNA SENGODAMPALAYAM | ERODE | TAMIL NADU | 638012 | ₹7.3 Cr | L2 | Rejected-AOC Rejected |
| 3 | L3₹7.4 CrRejected-AOC KIDSNEST SCHOOL BUILDING 32 JAI NAGAR 3RD AVENUE PALAYAPALAYAM ERODE 638 011 | ERODE | ERODE | TAMIL NADU | 638011 | ₹7.4 Cr | L3 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | Smart Infratech Developers L2 | DMW Infrastructure India Private Limited L3 | VARGEESH CONSTRUCTION L1 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers.- 2.40m-3.30M Footing Depth.
Data worked out for 48 m3 per day/8 hrs. | 1,730 | cum | 409 ₹7,07,570 | 410 ₹7,09,300 | 400 ₹6,92,000 Lowest |
| 2.00 | Earth work Open excavation by Mechanical Means for Open Earthwork in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers.
A). Upto 2.40m Depth.
Data worked out for 64 m3 per day/8 hrs | 270 | cum | 205 ₹55,350 | 210 ₹56,700 | 200 ₹54,000 Lowest |
| 3.00 | Supply and filling in foundation and basement with Gravel in layers of not more than 15cm.thick well rammed watered and compacted with surface vibrator, watered and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 975 | cum | 870 ₹8,48,250 | 900 ₹8,77,500 | 850 ₹8,28,750 Lowest |
| 4.00 | Supplying and Filling in foundation and basement and trenches with Conveyed Earth in layers of not more than 15cm thick well rammed watered and consolidated etc., complete complying with standard specification and as directed by the departmental officers. | 217 | cum | 389 ₹84,413 | 390 ₹84,630 | 380 ₹82,460 Lowest |
| 5.00 | Refilling with excavated earth other than sand with an initial head load of 100 mts and depositing the earth as shown by the departmental officers in layers of not more than 15cm thick well rammed with surface vibrator, watered and consolidated etc., complete complying with standard specification and as directed by the departmental officers. | 190 | cum | 164 ₹31,160 | 170 ₹32,300 | 160 ₹30,400 Lowest |
| 6.00 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers -Mixing by mechanical means | 136 | cum | 5,933 ₹8,06,888 | 6,000 ₹8,16,000 | 5,800 ₹7,88,800 Lowest |
| 7.00 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for flooring including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers -Mixing by mechanical means | 132 | cum | 5,933 ₹7,83,156 | 6,000 ₹7,92,000 | 5,800 ₹7,65,600 Lowest |
| 8.00 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, Sill slabs etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid with silver oak joists of size 10cm x 5cm & 7.5cm x 5cm as support runner , vertical stiffener , side support and Top Horizontal stiffener spaced at about 60cm to 90cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid). | 1,385 | sqm | 767 ₹10,62,295 | 770 ₹10,66,450 | 750 ₹10,38,750 Lowest |
| 9.00 | Supplying and erecting steel centering including necessary supports For plane surfaces such as rectangular or square RCC columns etc. which require only nominal strutting using mild steel sheets made of 10 gauge thick welded with MS angle size 40mm x 40mm x 5 mm and supported by Steel Adjustable Telescopic Props of Size 2m x 2m (expandable upto 3.60m) made with outer steel pipe with dia 50mm (3.60mm thick) and inner steel pipe with dia 40mm (2.90mm thick).etc..complete in all floors complying with standard specifcation. Steel Adjustable telescopic props shall be provided as directed by the departmental Officers. (Payment for centering shall be given after the concrete is laid). | 1,720 | sqm | 665 ₹11,43,800 | 670 ₹11,52,400 | 650 ₹11,18,000 Lowest |
| 10.00 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as vertical slab, side slabs of boxing, vertical drops, facia, vertical wall, etc. using mild steel sheets of size 1200cm x 60cm and 10 BG stiffened with welded mild steel angles of size 40mm x 40mm x 5 mm for boarding, laid with silver oak joists of size 10cm x 5cm & 7.5cm x 5cm as support runner, Top Horizontal stiffener spaced at about 60cm to 90cm centre to centre or at suitable intervals. MS Channel Section (ISMC 100) shall be provided as a vertical support @1.20m C/C and with Lateral support of Steel Adjustable Telescopic Props of Size 2m x
2m (expandable upto 3.60m) & steel pipes of 20mm dia @ required level/spacing etc. complete complying with standard specifcation and as directed by the departmental officers. (Payment for centering shall be given after the concrete is laid) | 90 | sqm | 675 ₹60,750 | 680 ₹61,200 | 660 ₹59,400 Lowest |
Tender Value
₹7.1 Cr
EMD Value
₹3.6 L
Closing Date
8 Dec 2025, 3:00 pmClosed
Chief Engineer
Office of Chief Engineer, Public Works Department, Projects, Chepauk, Chennai 05
Construction of New Govt Industrial Training Institute Building at Eral in Thoothukudi District
2025_HE_625511_1
Eral_2025
Open Tender
Civil Works - Buildings
Lump-sum
420 days
Eral
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹3.6 L
Yes
7 Mar 2026
21 Nov 2025
9 Dec 2025
21 Nov 2025
8 Dec 2025
21 Nov 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers.- 2.40m-3.30M Footing Depth. Data worked out for 48 m3 per day/8 hrs. | |||||
| 2Earth work Open excavation by Mechanical Means for Open Earthwork in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers. A). Upto 2.40m Depth. Data worked out for 64 m3 per day/8 hrs | |||||
| 3Supply and filling in foundation and basement with Gravel in layers of not more than 15cm.thick well rammed watered and compacted with surface vibrator, watered and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | |||||
| 4Supplying and Filling in foundation and basement and trenches with Conveyed Earth in layers of not more than 15cm thick well rammed watered and consolidated etc., complete complying with standard specification and as directed by the departmental officers. | |||||
| 5Refilling with excavated earth other than sand with an initial head load of 100 mts and depositing the earth as shown by the departmental officers in layers of not more than 15cm thick well rammed with surface vibrator, watered and consolidated etc., complete complying with standard specification and as directed by the departmental officers. | |||||
| 6Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers -Mixing by mechanical means | |||||
| 7Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for flooring including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers -Mixing by mechanical means | |||||
| 8Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, Sill slabs etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid with silver oak joists of size 10cm x 5cm & 7.5cm x 5cm as support runner , vertical stiffener , side support and Top Horizontal stiffener spaced at about 60cm to 90cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid). | |||||
| 9Supplying and erecting steel centering including necessary supports For plane surfaces such as rectangular or square RCC columns etc. which require only nominal strutting using mild steel sheets made of 10 gauge thick welded with MS angle size 40mm x 40mm x 5 mm and supported by Steel Adjustable Telescopic Props of Size 2m x 2m (expandable upto 3.60m) made with outer steel pipe with dia 50mm (3.60mm thick) and inner steel pipe with dia 40mm (2.90mm thick).etc..complete in all floors complying with standard specifcation. Steel Adjustable telescopic props shall be provided as directed by the departmental Officers. (Payment for centering shall be given after the concrete is laid). | |||||
| 10Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as vertical slab, side slabs of boxing, vertical drops, facia, vertical wall, etc. using mild steel sheets of size 1200cm x 60cm and 10 BG stiffened with welded mild steel angles of size 40mm x 40mm x 5 mm for boarding, laid with silver oak joists of size 10cm x 5cm & 7.5cm x 5cm as support runner, Top Horizontal stiffener spaced at about 60cm to 90cm centre to centre or at suitable intervals. MS Channel Section (ISMC 100) shall be provided as a vertical support @1.20m C/C and with Lateral support of Steel Adjustable Telescopic Props of Size 2m x 2m (expandable upto 3.60m) & steel pipes of 20mm dia @ required level/spacing etc. complete complying with standard specifcation and as directed by the departmental officers. (Payment for centering shall be given after the concrete is laid) | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
Eral_CoverII.pdf
Additional Documents • 2.33 MB
Eral_CoverI.pdf
Tender Documents • 0.80 MB
BOQ_747991.xls
BOQ • 0.54 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].