Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.6 CrAdmitted-Finance | -18.99% | ₹4.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹5.2 Cr+₹50.5 L (10.9%)Admitted-Finance PLOT NO 594 2922 GADAMAHAVIR LANE GARRAGE CHACK BHUBANESWAR 751002 | BHUBANESWAR | KHORDHA | ODISHA | 751002 | -10.19% | ₹5.2 Cr+₹50.5 L (10.9%) | L2 | Admitted-Finance |
Tender Value
₹5.7 Cr
EMD Value
₹5.7 L
Closing Date
17 Aug 2026, 5:00 pmClosed
SE(CIVIL)
CIVIL WORKS CIRCLE,OPTCL BBSR
ADDITION OF TWO 02 13-PASSENGER ELEVATORS AND DEVELOPMENT OF MEZZANINE FLOOR AREAS FOR OFFICE USE IN OPTCL TECH TOWER BUILDING, SAHEED NAGAR, BHUBANESWAR
2026_OPTCL_137777_2
OPTCL-CVL-SE E-02 of 2026-27
Open Tender
Civil Works - Others
Percentage
120 days
SAHEED NAGAR
Please refer Tender documents.
4 documents required · 4 mandatory
₹12,000
SE(CIVIL),CIVIL WORKS CIRCLE,OPTCL
₹5.7 L
Yes
28 Aug 2026
3 Aug 2026
19 Aug 2026
3 Aug 2026
17 Aug 2026
3 Aug 2026
3 Aug 2026 - 10 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CIVIL ESTIMATE | - | Cum | - | - |
| 2 | DISMANTLING WORK | - | Cum | - | - |
| 3 | Dismantling brick or stone masonry in lime or cement mortar above 3m. height including stacking the useful materials for reuse and removing the debris within 50m | 1 | Cum | 0.8 | ₹0.8 |
| 4 | CIVIL WORK | - | Cum | - | - |
| 5 | Earth work in excavation in foundation trenches, column foundation, pit, etc in hard & Gravelly soil of beyond 1.5m depth of soil including moorum stony earth and earth mixed with boulders except sheet rock and boulders not requiring blasting including dressing of sides and levelling the bed up to the required depth and depositing the excavated materials away from the work site with initial lead of 50 mtr and all lifts, including shoring, shuttering & dewatering (if required) with cost of labour, labour cess, hire & running charges of all machineries, sundries & T&P required for the work complete as directed by the Engineer in charge. | - | Cum | 0.98 | - |
| 6 | Providing and lying Plain Cement Concrete of proportion (1:3:6) in foundation & floor using 40 mm & down grade black hard crusher broken granite stone metal, washed and screened sharp sand of approved quality from approved quarry including hoisting, lowering, laying the concrete, ramming, watering and curing etc. complete to required thickness including cost of all materials, conveyance, loading, unloading, royalties, cost of labours, T&P, hire & running charges of concrete mixer, etc. all complete as per the direction of the Engineer -in -charge. for ground level beyond 4.5m & upto 7.5m depth | - | Cum | 0.86 | - |
| 7 | Supplying and filling with sand in foundation and plinth in layers not exceeding 20 cm in depth, well watered and compacted , top surface dressed and levelled to proper level and gradient including cost of all materials, conveyance,royalties, loading, unloading, cost of all labour, T&P, etc. all complete as per the direction of Engineer-in-Charge. | 1 | Cum | 0.85 | ₹0.85 |
| 8 | Providing and carrying out diamond cutting in reinforced cement concrete (RCC) slab using high precision diamond wire saw / diamond blade cutting machine, including marking lines, cutting to required size and depth, making smooth edges, and removing the cut portion carefully without damaging the surrounding structure. The work includes all labor, machinery, tools, safety measures, scaffolding, and disposal of debris as directed by the engineer-in-charge. | - | Sqm | - | - |
| 9 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete | - | Qntl. | - | - |
| 10 | Providing and fixing chemical anchors in reinforced cement concrete (RCC) or masonry using approved high-strength chemical adhesive (epoxy / polyester resin), including drilling holes of required diameter and depth with rotary hammer drill, cleaning the holes using air blower and wire brush to remove dust, injecting chemical resin, inserting high tensile threaded rods / rebar of specified diameter, proper alignment, curing, and achieving required bond strength, complete in all respects as directed by the Engineer-in-Charge. | - | No. | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.53 MB
Tendernotice_2.pdf
PDF • 4.50 MB
Tendernotice_3.pdf
PDF • 1.15 MB
Tendernotice_4.pdf
PDF • 1.31 MB
BOQ_604448.xls
BOQ • 0.55 MB
DoubleCoverDTCN.pdf
Tender Documents • 3.21 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .