Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.0 LAccepted-Finance | 1 | Accepted-Finance Accept | |
| 2 | 2₹2.7 L+₹69,380 (34.8%)Accepted-Finance 01 KATYANI CONSTRUCTION COMPANY H NO 1 SHOP NO 1 RATAN LAL NAGAR KANPUR NAGAR UTTAR PRADESH 208022 | KANPUR NAGAR | UTTAR PRADESH | 208022 | 2 | Accepted-Finance Accept | |
| 3 | 3₹2.8 L+₹84,700 (42.4%)Accepted-Finance | 3 | Accepted-Finance Accept |
Tender Value
Refer Docs
EMD Value
₹6,000
Closing Date
15 Dec 2020, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE ETD FATEHGARH
132 KV S/S BEWAR ROAD FATEHGARH FARRUKHABAD PIN 209602
DISMANTELING OF 132/33 KV 40 MVA T/F AND ERECTION OF NEW 63 MVA T/F ATLANTA MAKE AT 220 KV S/S CHHIBRAMAU UNDER ETD FATEHGARH
2020_UPTCL_532074_2
T-08/ETD(F)/2020-21
Open Tender
Electrical Works
Fixed-rate
90 days
CHHIBRAMAU
Please refer Tender documents.
2 documents required · 2 mandatory
₹354
UPPTCL ETD FATEHGARH
₹6,000
16 Dec 2020
7 Dec 2020
15 Dec 2020
7 Dec 2020
15 Dec 2020
7 Dec 2020
90 days
Amount
Draining of Transformer oil from the 40 MVA Transformer in 209 Ltr. Drums or in the 20KL Oil tanks
Removal of bushings with the help of hydraulic Crane of HV/LV sides of transformer, the work involves opening of all bolts and nuts from turret , then opening of terminal leads from top of bushing and safely laying the lead in the T/F with proper fixing it on top cover..
132 KV Side
33 KV Side
Removal of all fans attached with radiator of T/F the work involves opening of fans from beams cantilever opening of cable connections and other associated fittings from 40 MVA T/F
Removal of radiators from the main tank with the help of hydraulic Crane,rope, pull etc. the work involves opening of radiator fittings safely from valve of oil tank.
Removal of conservator tank with the help of hydraulic Crane from main Tank with safe handling of valves, Bucholz relay Pipes breather etc.
Dismantling of marshaling box of T/F with the opening of all cable connection grouted bolts etc.
Dismantling of RTCC Panel with the opening of all cable connection etc.
Shifting of main tank of 40 MVA T/F from Plinth to loading point including turning of tank if required ,including all T&P ,men and all other works required to complete the job satisfactorily. The work required motorized winch machine suitable for dragging of 100 Ton load .
Up to 20 Mtrs.
Additional shifting (One Job) for every 05 Mtrs.
Fixing of blanking plates on all opening places of transformer ie. Turrets ,radiator valves top conservator holes etc the work involves making of plates if required.
Shifting of main tank of new 63MVA, Atlanta make transformer from store place to plinth including Turning of tank if required, including all T&P, men and all other works required to complete the job satisfactorily. The work required motorized winch machine suitable for dragging of 100 Ton load .
upto 20mtr.
Additional shifting of 01 job per each
Removal of blanking plates from the turrets and other required places of main tank of Transformer .
Fixing of bushing with the help of hydraulic Crane on the turret of transformer the work involves tightening. of bolts safe handling of terminal leads and tightening them on top the bushing strictly without any damage.
132KV side
33KV side
Fixing of radiator wings on the transformer with the help of hydraulic Crane the work involves tightening of bolts on the valve place of main tank of transformer.
Fixing of conservator tank and its assemblies on the top of the transformer with the help of hydraulic Crane and fixing of buchloz relay on suitable place.
Erection of marshaling box on suitable place and grouting.
Filling of new transformer oil upto required level.
Centrifuging of transformer oil of main tank and OLTC tank with the help of good capacity centrifuging machine which will be provided by the agency and taking the BDV periodically upto required BDV value.
Fixing of fans on radiators as per instruction manual the work required fixing of beams, cantilevers. Termination of cable etc.
Erection of RTCC & OLTC panels on suitable place in the control room.
laying of new cable for 63 MVA transformer & OLTC panel to the control relay panel and 63MVA transformer if required, as per site conditions.
Termination of cable in RTCC, OLTC & marshaling box transformer relay panel if required with the assurance of proper reflection of parameters in the meters, gauges provided on RTCC, OLTC, Marshaling box, transformer etc.
Earthing of 63MVA T/F with MS Flat (including cost of MS Flats) with netural & body earthing
Shifting of T/F accessories etc. of new 63 MVA to switchyard from place of unloading
Shifting of dismantled accessories of old 40 MVA T/Fs From switch yard to stores.
Katyani Construction Co.
BARKATI ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .