Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 LAccepted-AOC | L1 | Accepted-AOC work order has been awarded | |
| 2 | L2₹6.0 L+₹1.9 L (44.6%)Rejected-Finance KH NO 142 2 2 MILAN VIHAR GALI NO 3 BURARI DELHI NORTH DELHI DELHI 110084 | CENTRAL DELHI | DELHI | 110084 | L2 | Rejected-Finance Not L1 |
| Sl No | Description | Qty | Unit | M/s Pesi Pvt. Ltd. L1 | Aerochem Enviro Engineering Private Limited L2 |
|---|---|---|---|---|---|
| 1.00 | Supply, Installation, Testing and Commissioning of ongrid Solar Photovoltaic Power Plant conforming to MNRE specifications as amended, consisting of Mono Crystalline silicon solar cells, net metering facility, necessary protections, earthling, mounted on Aluminum/GI structure of suitable strength with following components complete as required:- a) Solar Photovoltaic Module of capacity 330/335Wp or above, manufactured in India, conforming to IS 14286/IEC 61215, IS/IEC 61730-Part-1, IS/IEC 61730-Part-2. Solar Photovoltaic Module conversion efficiency shall not be less than 16.5%. PV modules used in solar power plants/ systems must be warranted for their output peak watt capacity, which should not be less than 90% at the end of 10 years and 80% at the end of 25 years. b) Power Conditioning Unit (PCU) of 350-800 V DC Input voltage range and 400 V AC, three phase, 4 wire, 50Hz +/- 2.5 Hz, output voltage suitable to generate AC Power with efficiency not less than 97%, total harmonic distortion less than 3% and suitable for ambient temperature from 0 to 50 degree C. The PCU shall adjust the voltage and frequency level to suit the Grid Voltage Frequency. c) Data Monitoring System complete with accessories. d) Fixing of Array junction box & Main junction box with IP 65 protection and termination arrangement for incoming and outgoing cable along with glands, lugs and other accessories etc. as required. e) Lightning and surge voltage protection. f) Connections & Interconnections by supplying & fixing required size XLPE insulated copper conductor 1.1 kV grade armoured power and control cables between solar modules, main power cable to grid supply PCU unit along with supplying & fixing of necessary channel/conduit lugs and other accessories etc. as required. | 7 | Kwp | 54,954 ₹3,84,678 Lowest | 65,900 ₹4,61,300 |
| 2.00 | Comprehensive maintenance of solar power system which include routine, preventive and break down maintenance for period of five years including one year defect liability period repair/replacement of worn out items with minimum downtime including routine and timely servicing of overall power plant | 1 | Job | 31,239 ₹31,239 Lowest | 1,40,000 ₹1,40,000 |
Tender Value
₹4.6 L
EMD Value
₹9,250
Closing Date
23 Jan 2023, 1:00 pmClosed
EEE-II Shah(S)
OFFICE OF THE Ex. ENGINEER (ELECT)-II 2 nd Floor Technical Laboratory Near NH-24 Ghazipur Delhi
SITC of solar PV system for feeding the street lights at SRM Apartment i.p extension ward 19E under shd-south zone
2023_EDMC_141667_1
EE (Elect)-II//2022-23/17.1
Open Tender
Electrical Works
Item Rate
60 days
work
Please refer to tender documents
4 documents required · 4 mandatory
₹500
₹9,250
10 Oct 2025
16 Jan 2023
24 Jan 2023
16 Jan 2023
23 Jan 2023
16 Jan 2023
Amount
Supply, Installation, Testing and Commissioning of ongrid Solar Photovoltaic Power Plant conforming to MNRE specifications as amended, consisting of Mono Crystalline silicon solar cells, net metering facility, necessary protections, earthling, mounted on Aluminum/GI structure of suitable strength with following components complete as required:- a) Solar Photovoltaic Module of capacity 330/335Wp or above, manufactured in India, conforming to IS 14286/IEC 61215, IS/IEC 61730-Part-1, IS/IEC 61730-Part-2. Solar Photovoltaic Module conversion efficiency shall not be less than 16.5%. PV modules used in solar power plants/ systems must be warranted for their output peak watt capacity, which should not be less than 90% at the end of 10 years and 80% at the end of 25 years. b) Power Conditioning Unit (PCU) of 350-800 V DC Input voltage range and 400 V AC, three phase, 4 wire, 50Hz +/- 2.5 Hz, output voltage suitable to generate AC Power with efficiency not less than 97%, total harmonic distortion less than 3% and suitable for ambient temperature from 0 to 50 degree C. The PCU shall adjust the voltage and frequency level to suit the Grid Voltage Frequency. c) Data Monitoring System complete with accessories. d) Fixing of Array junction box & Main junction box with IP 65 protection and termination arrangement for incoming and outgoing cable along with glands, lugs and other accessories etc. as required. e) Lightning and surge voltage protection. f) Connections & Interconnections by supplying & fixing required size XLPE insulated copper conductor 1.1 kV grade armoured power and control cables between solar modules, main power cable to grid supply PCU unit along with supplying & fixing of necessary channel/conduit lugs and other accessories etc. as required.
Comprehensive maintenance of solar power system which include routine, preventive and break down maintenance for period of five years including one year defect liability period repair/replacement of worn out items with minimum downtime including routine and timely servicing of overall power plant
Aerochem Enviro Engineering Private Limited
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .