Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.6 LAccepted-Finance | 1 | Accepted-Finance satisfied | |
| 2 | 2₹3.9 L+₹31,224 (8.69%)Accepted-Finance MOOLAKKADU PO KOLATHUR VIA METTUR DAM 636 452 | METTUR DAM | SALEM | TAMIL NADU | 636452 | 2 | Accepted-Finance satisfied |
Tender Value
₹5.2 L
EMD Value
₹5,300
Closing Date
10 Aug 2022, 2:00 pmClosed
CE / MTPS-I
The Chief Engineer Mettur Thermal Power Station-I Mettur Dam- 636406 Salem District
MTPS I CHP II Routine maintenance preventive maintenance works in conveyors 14 16 ERH tunnel
2022_EB_242690_1
CE SE M II MTPS I CHP II OT 59 2022 2023
Open Tender
Miscellaneous Works
Works
120 days
MTPS-I
As per Tender Specification
5 documents required · 5 mandatory
₹0
₹5,300
Yes
16 Aug 2022
19 Jul 2022
11 Aug 2022
19 Jul 2022
10 Aug 2022
19 Jul 2022
Amount
Charges for cleaning of spillage coal from conveyors 14, 16,ERH tunnel and BFD 11A,11B,12A&12B and cleaning of all the equipment in conveyor both ends.
Charges for checking of oil level, oil topping in all gear box, inspection and cleaning of breather in gear box of conveyors 14 , 16 and BFD 11A,11B12A&12B .
Charges for greasing of all pillow block bearings checking of oil level and oil topping in fluid coupling, checking of tightness of bolts & nuts, checking and adjusting scrapper and skirt rubber and replacement of scrapper and skirt rubber if necessary in conveyors 14, 16 and BFD 11A,11B,12A&12B.
Charges for removing the existing fixed type carrying idler / Impact idler from the stand, transporting the new idler from pocket store to conveyors and assembling new idler of size 159.3 mm dia x 530, 193.7 mm dia x 530mm , 193.7 mm dia x 250mm and 193.7 mm dia x 1600 mm.
Charges for removing the existing return idler of size 159.3 dia x 800 mm long from the stand, transporting the new idler from pocket store to conveyors and belt feeders assembling new idlers.
Labour charges for petty welding works , fabrication and welding of skirt board mother plate ,chute patch work and patch welding works in conveyors 14, 16 and BFD 11A,11B,12A & 12B .
Hire charges for T&Ps and charges for consumables for Slno.1 to 6
TRIPLE M ENGINEERING CONTRACTORS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .