| 1 | L1₹14.0 LAccepted-AOC 239 NETAJI SUBHAS ROAD HOWRAH 711101 | HOWRAH | HOWRAH | WEST BENGAL | 711101 | L1 | Accepted-AOC L1 | |
| 2 | L2₹14.2 L+₹14,032.55 (1.00%)Rejected-Finance 14 5 SRIBASH DUTTA LANE HOWRAH 711101 | HOWRAH | WEST BENGAL | 711101 | L2 | Rejected-Finance NOT LOWEST BIDDER | |
| 3 | L3₹14.5 L+₹42,097.64 (3.00%)Rejected-Finance | L3 | Rejected-Finance NOT LOWEST BIDDER |
Tender Value
₹14.0 L
EMD Value
₹28,065
Closing Date
21 Feb 2026, 1:00 pmClosed
EE ,WS
4, MG ROAD, HOWRAH 1
Improvement of Water Supply by Laying New pipeline, Replacing of old existing pipeline (Primary, Secondary and all relevant distribution lines), providing Valves when and where requires and repairing of Distribution pipeline leakage irrespective of
2026_MAD_997126_1
WB-HMC/TN/ED/WS/16/25-26
Open Tender
CIVIL WORKS
Percentage
365 days
HMC AREA
dia of pipe( Higher dia pipe 500 mm dia, 750 mm dia, 900 mm dia, 1000 mm dia ,1200 mm dia) , Installation and repairing of air valve including road restorations work from the Natabar Pal Road ,A Road, F Road, Belgachia Trenching Ground, Jhil Roa
5 documents required · 5 mandatory
₹0
₹28,065
Yes
11 Sept 2026
5 Feb 2026
24 Feb 2026
5 Feb 2026
21 Feb 2026
5 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation of trial pit (3.0 m x 1.0 m x (upto) 3.0 m) for fixing of pumping main, washout line raking every detection against damage of S.W. pipe line electrical cable etc. as underground obstruction including 37.5 mm timber shuttering, earth cutting, dewatering, barricading and back filling etc. as per direction of E-I-C.
Ref:- UD & MAD (Schedule) 2018, P-2, it. No. - 1.4 | 3 | Each | 1,867 | ₹5,601 |
| 2 | Cutting & picking up existing metalled black top portion of road surface
to an average depth of 300 mm by using Jack hammer with all necessary
tool and plant including reening the serviceable materials & stacking within a lead of 75 mtr. all complete as per direction of the Engineer-in- Charge.
Ref:- UD & MAD (Schedule) 2018, P-2, it. No. - 1.5 | 50 | Cu.M. | 636 | ₹31,800 |
| 3 | Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m.
In ground floor including roof.
a) upto 150 mm. Thick
Ref: P.W.D (Bldg) Sch. -2017, page -10 It- 2(a) | 10 | Cu.M. | 939 | ₹9,390 |
| 4 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.
(a) Depth of excavation not exceeding 1,500 mm.
Ref:- UD & MAD (Schedule) 2018, P-1, it - 1.1(a). | 450 | % Cu.M. | 119.27 | ₹53,671.5 |
| 5 | (b) Depth of excavation for additional depth beyond 1,500 mm. and
upto 3,0 mm. but not requiring shoring
Ref:- UD & MAD (Schedule) 2018, P-1, it - 1.1(b). | 86 | % Cu.M. | 192.38 | ₹16,544.68 |
| 6 | Hire and labour charges for 75 mm dia bamboo railing on Jhau/Eucalyptus or other approved timber\bamboo posts 1.4 m above G.L and 0.60 m below G.L including tying strongly with coir ropes and boring holes for posts in any soil/ concrete surface/Bituminious surface packing the sides etc including cost of carriage of all materials and labour complete including cost of restoration to the damages of the ground to its original condition as per direction of Engineer in charge after removing the barricade.(Cost of restoration would be paid seperately.)
(a)75mm. dia bamboo railing & 125mm. Dia Jhau/Eucalyptus/other
approved timber posts @ 1.60m apart
(ii) Railing with 3 rows.
Ref:- UD & MAD (Schedule) 2018, P-3, it - 1.8(a)(ii) | 150 | M | 49 | ₹7,350 |
| 7 | Hire and labour charges for shoring work (including necessary close plank walling, framing, Eucalyptus/Jhou bulla piling, strutting etc) complete as per direction of the Engineer-in charge for foundation excavation (vertical surface are in contact with supported earth is to be measured.) (This item should be executed on specific direction of the Enginner in charge).
(a) Depth upto 1.5 m.
Ref:- UD & MAD (Schedule) 2018, P-3, it - 1.6(a). | 30 | Sq. M | 386 | ₹11,580 |
| 8 | (a) Depth upto 1.5 m.
Ref:- UD & MAD (Schedule) 2018, P-3, it - 1.6(b). | 20 | Sq. M | 439 | ₹8,780 |
| 9 | Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (Payment to be made on measurement of finished quantity)
Ref:-[Page:2; Item No:4(A) of PWD-SOR(Bld) 2017] | 40 | % Cu.M. | 711.81 | ₹28,472.4 |
| 10 | Lead jointing to C.I. pipes and specials with supply of lead and spun yarn all complete to make the joint water tight at required hydraulic pressure as per specification & direction of the Engineer-in-charge.
400mm dia.
Ref:-UD & MAD (Schedule) 2018, P-6, IT-2.1.3 | 4 | Each | 3,303 | ₹13,212 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.91 MB
Tendernotice_2.pdf
PDF • 5.95 MB
BOQ_2440694.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .