| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹14.9 LAdmitted-Fee/PreQual/Technical/Finance AT HARIPUR ROAD P O BUXIBAZAR DIST CUTTACK | +0.00% | ₹14.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L1₹14.9 LAdmitted-Fee/PreQual/Technical/Finance ITAMATI NAYAGARH NAYAGARH | +0.00% | ₹14.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L1₹14.9 LAdmitted-Fee/PreQual/Technical/Finance AT HARIPUR PO KHADIANGA P S BADACHANA DIST JAJPUR | JAJPUR | ODISHA | +0.00% | ₹14.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L1₹14.9 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹14.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L1₹14.9 LAdmitted-Fee/PreQual/Technical/Finance AT BARIMAL PO HATIBARI PS SUKINDA DIST JAJPUR PIN 755018 | JAJAPUR | ODISHA | 755018 | +0.00% | ₹14.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹14.9 L
EMD Value
₹14,900
Closing Date
4 May 2026, 5:00 pmClosed
Executive Engineer, CD-I
At Bikash Bhawan, Jagannathlane, Badambadi, Cuttack 753012
Construction of Anganwadi Center at Immampada Basti in Ward No. 06.
2026_ORULB_128333_8
MC(CMC)CTC_Div-I_No.1/2026-27
Open Tender
Civil Works - Others
Percentage
90 days
CMC
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,080
₹14,900
Yes
11 May 2026
23 Apr 2026
7 May 2026
23 Apr 2026
4 May 2026
23 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling and removing R.C.C.columns beams slab staircase landing lintels including stacking the useful materials for reuse and removing the debris within 50m lead | - | cum | - | - |
| 2 | Dismantling brick or stone masonry in lime or cement mortar above 3m. height including stacking the useful materials for reuse and removing the debris within 50m. Lead | - | cum | - | - |
| 3 | Earth work in all kinds of soil in excavation of foundation trenches for columns, basement, tie beams, walls and steps in all kinds of soil including moorum, hard stoney earth and earth mixed with boulders except sheet rocks and boulder requiring blasting with all leads and lifts including dressing and leveling the bed sides up to required depth and depositing the excavated materials at places away from the work site with all leads and lifts, T&P for shoring shuttering dewatering if required etc. complete as per the drawing, designing including cost of all labour, T&P etc. as required for the work complete as directed by the Engineer-in-charge. | - | cum | - | - |
| 4 | Supplying and filling the foundation and plinth with clean coarse river sand of approved quality from approved quarry, laying in layers not exceeding 150mm thick, watering and ramming including cost, conveyance royalty and taxes of all materials, cost of as per the direction of Engineer-In-Charge. | - | cum | - | - |
| 5 | Providing & laying cement concrete of prop (1:3:6) in foundation bed and floors using 40mm nominal size down graded, screened, washed hard black crusher broken granite metal of approved quality & from approved quarry including laying in the layers not exceeding 150mm thick hoisting, lowering, laying, watering and curing etc. Complete. To the required levels including cost, conveyance, royality and taxes of all materials, cost of all labour, T&P etc. as required for the work complete and as per direction of Engineer in charge. | - | cum | - | - |
| 6 | First class Fly Ash Brick work in cement mortar (1:6) in foundation &plinth with best quality bricks having crushing strength from 75KG/cm2 to 99Kg/cm/2, immersing the bricks in water for not less than 6 hours before use (the bricks shall well brunt, free from cracks, well shaped, uniform in size and shall produce a clear metallic ringing sound when struck ) includes moulding, chamfering, corbelling etc. complete as per drawing design and specification, watering and curing for 7 days including cost, conveyance, royality and taxes of all materials, labour, T&P etc. and as per direction of Engineer in charge. | - | cum | - | - |
| 7 | R.C.C work of prop M20 having minimum compressive strength (in work test) 200kg./cm2 in 15cm cubes at 28days after mixing and test conducted in accordance with I.S. 456 and I.S. 516using 12mm to 20mm size (1/2” to ¾”) crusher broken hard black granite chips of 20mm size (not to exceed 25%) of approved quality & from approved quarry including hosting, lowering, laying and compacting concrete with vibrator, watering and curing for 28days, cost of rigid and smooth centering & shuttering and finishing to exposed surface smooth providing, grooves or beads wherever necessary as per direction of the Engineer in charge including cost, conveyance, royalties & taxes of all materials and cost of all labour, T&P etc. as required for the work completion in all respects as per direction of Engineer in charge but excluding cost of M.S rod / Tor steel and binding wires and labour charges for bending, binding wires and labour charges for bending, binding and tying the grills. Base
Base | - | cum | - | - |
| 8 | Plinth Beam | - | cum | - | - |
| 9 | Column ,Beam | - | cum | - | - |
| 10 | Lintel | - | cum | - | - |
stage.html
html • 0.03 MB
finance_588457.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.34 MB
BOQ_588457.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .