Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.9 LAdmitted-Finance | -10.11% | ₹8.9 L | L1 | Admitted-Finance |
| 2 | L2₹9.2 L+₹30,855.13 (3.46%)Admitted-Finance 106 NEHRU NAGAR ROORKEE DISTRICT HARIDWAR | HARIDWAR | UTTARAKHAND | 247656 | -7.00% | ₹9.2 L+₹30,855.13 (3.46%) | L2 | Admitted-Finance |
Tender Value
₹10.7 L
EMD Value
₹21,311
Closing Date
21 Aug 2026, 12:00 pmClosed
DCF SWM
DCF SWM
Entry Gate Fencing and Hut work at Various Advance Work, Creation of Water Point at Plantation , Gabion Constructin of Range Gangapur city
2026_FORES_589228_1
Nit No 30/2026-27 DCF Sawai Madhopur
Open Tender
Civil Works
Percentage
120 days
SAWAI MADHOPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
E Challan of EMD, Tender Cost, Processing Fee, All
₹21,311
Yes
25 Aug 2026
17 Aug 2026
21 Aug 2026
17 Aug 2026
21 Aug 2026
17 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5 m , disposed earth to be levelled and neatly dressed : All kinds of soil | 36.1 | CUM | 175 | ₹6,317.5 |
| - | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | 2.2 | cum | 3,302 | ₹7,264.4 |
| - | Random Rubble masonry with hard stone in cement sand mortar including curing and mixing of mortar in foundation in ration Cement Mortar 1:6 ( 1-Cement : 6-Sand).for kattle guard hut and gate piller | 86.04 | cum | 2,838 | ₹2,44,181.52 |
| - | Brick work with F.P.S. bricks of class designation 75 in superstructure above plinth level upto floor V level in all shapes and sizes in : Cement mortar 1 : 6 (1 cement : 6 coarse sand) | 37.45 | cum | 4,990 | ₹1,86,875.5 |
| - | 25 mm thick cement plaster on new surface of walls in two coats including smooth finishing in cement sand mortar in ratio 1:6 including curing etc. complete.for kattle guard hut and gate piller | 179.6 | sqm | 227 | ₹40,769.2 |
| - | White washing with lime to give an even shade including all scaffolding:.for gate piller | 179.6 | sqm | 11 | ₹1,975.6 |
| - | Stone slab roofing on ground floor with fine grained stone slab from approved quarry including filling of joints of parapet and slab on both sides in cement sand mortar 1:4, with ceiling pointing in cement sand mortar 1 : 3 complete as per specification and instruction of Engineer In Charge | 28.8 | sqm | 1,648 | ₹47,462.4 |
| - | Providing and fixing T-iron frames for doors, windows and ventilators of mild steel Tee-sections, joints mitred and welded with 15x3 mm lugs 10cm long embedded in cement concrete blocks 15x10x10 cm of 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) or with wooden plugs and screws or rawl plugs and screws or with fixing clips or with bolts and nuts as require including fixing of necessary butt hinges and screws and applying a priming coat of approved steel primer.gate and door | 750 | kg | 83 | ₹62,250 |
| - | Digging of pits (size 0.45 m x0.45 mx0.45m or (0.50+0.40) /2X (0.50+0.40) /2x0.45 cubic meter) In hard muram /kankar/compect clay soil for cement post | 232 | Pit | 28.72 | ₹6,663.04 |
| - | 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40mm nominal size). | 16.7 | Cum | 2,956 | ₹49,365.2 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 9.33 MB
BOQ_1046312.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .