Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical ok |
| 2 | Accepted-Technical | Accepted-Technical ok |
| 3 | Accepted-Technical CHITAVAR JOGI MEETAI HATHRAS | Accepted-Technical ok |
| 4 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹1.4 L
Closing Date
2 Dec 2025, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
SE ECTC SLDC Campus UPPTCL, Lucknow
Construction of 02 No. 132 KV Bay for 132/33 KV S/S Sarai Katiyan at 132 KV Sub-Station Sonik, Unnao
2025_UPCTL_1091538_1
67/ECTC(L)/2025-26
Open Tender
Civil Works
Percentage
60 days
SE ECTC SLDC Campus UPPTCL
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,080
Superintending Engineer, E.C.T.C. Lucknow
₹1.4 L
14 Jan 2026
17 Nov 2025
3 Dec 2025
17 Nov 2025
2 Dec 2025
17 Nov 2025
Construction of
(GST Extra)
Conditions:
1.All civil work shall be executed according to the approved drawings of UPPTCL.
2.The quantities are tentative and may vary up to any extent or deleted during execution as per actual approved lay out plan & site condition.
3.All civil work shall be carried out as per UPPTCL/UPPWD specification.
4.Rates in BOQ are exclusive of CGST,SGST. Labour tax shall be borne by contractor.
5.Cement of approved quality like ACC,Ultra-Tech,Birla or equi.shall only be used.
6.Overweight steel section within tolerance shall be measured at standard weight and underweight steel section within tolerance shall be measured at actual weight.
7.In case any change in Bill of Quantity is suggested by higher authority that will be binding on the contractor. The agreement shall be executed on the approved Bill of Quantity only.
8.In case of dismantling of civil structure at site, 60% brick work shall be treated as fresh brick, 30% as brick bat & 10% as debris. Fresh brick & brick bat shall be issued to contractor/ firm at prevailing/pertaining SOR
9.The amount of scrape steel recovered from dismantling shall be shall be issued to contractor/ firm at 1/3rd of rate in prevailing/pertaining SOR
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.53 MB
Tendernotice_2.pdf
PDF • 0.59 MB
BOQ_2005192.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .