| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.4 LAccepted-AOC PLOT NO 64 VIDYAVIHAR PRATAP NAGAR NAGPUR 440015 M S | NAGPUR | NAGPUR | MAHARASHTRA | 440015 | 1 | Accepted-AOC Accepted. | |
| 2 | Rejected-Technical | - | Rejected-Technical NOT BEING L1 TENDERER | |
| 3 | Rejected-Technical | - | Rejected-Technical NOT BEING L1 TENDERER | |
| 4 | Rejected-Technical PLOT NO 50 SINDHI COLONY KHAMLA NAGPUR 440015 M S | NAGPUR | NAGPUR | MAHARASHTRA | 440015 | - | Rejected-Technical NOT BEING L1 TENDERER | |
| 5 | Rejected-Technical PLOT NO 31 FALKEY LAYOUT KATOL ROAD NAGPUR 440 013 M S | NAGPUR | MAHARASHTRA | 440013 | - | Rejected-Technical NOT BEING L1 TENDERER |
Tender Value
₹5.2 L
EMD Value
₹6,500
Closing Date
9 May 2023, 5:00 pmClosed
Sr Manager (Civil)/(Civil-Welfare) Deptt
OFFICE OF THE GM(C)/(Civil-Welfare) Dept. WCL HQ,COAL ESTATE,CIVIL LINES NAGPUR
Seating arrangement for visitors at WCL HQ, dispensary, Koyla Vihar Colony of WCL HQ Nagpur.
2023_WCL_277801_1
wcl-hq-civ-welfare-e05-2023-24
Open Tender
Civil Works - Buildings
Item Rate
45 days
WCL HQ NAGPUR
Please refer Tender documents.
3 documents required · 3 mandatory
₹6,500
24 Jul 2023
26 Apr 2023
11 May 2023
27 Apr 2023
9 May 2023
27 Apr 2023
27 Apr 2023 - 2 May 2023
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources: 6 graded stone aggregate 40 mm nominal size derived from natural sources).
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, ifnishing and reinforcement- All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources: 4 graded stone aggregate 20 mm nominal size derived from natural sources).
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).
Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts
Providing and laying Vitrified tiles in floor in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS:15622, of approved brand & manufacturer, in all colours and shade, laid on 20 mm thick cement mortar 1:4 (1 cement: 4 coarse sand) jointing with grey cement slurry @3.3 kg/sqm including grouting the joints with white cement and matching pigments etc. The tiles must be cut with the zero chipping diamond cutter only. Laying of tiles will be done with the notch trowel, plier, wedge, clips of required thickness, leveling system and rubber mallet for placing the tiles gently and easily. Glazed Vitrified tiles Matt/Antiskid finish of size 600 x 600 mm.
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge) 0.50 mm (+ 0.05 %) total coated thickness with zinc coating 120 grams per sqm as per IS:277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 metre or as desired by Engineer-in-charge. The sheet shall be fixed using self drilling /self tapping screws of size (5.5x 55 mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required.
Painting with synthetic enamel paint of approved brand and anufacture to give an even shade : Two or more coats on new work
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
Finishing walls with Acrylic Smooth exterior paint of required shade : Old work (Two or more coat applied @ 1.67 ltr/ 10 sqm) on existing cement paint surface
Making artistic picture on wall surface with superior quality weather coat paint including one coat, background painting of different shades including primer coat and pictorial figures/writing with appropriate paint for prominent look. Job includes cost of paint, labour, material like paint brush and tools and plants required for the work as per instruction of engineer in charge.
Repairing of 3 seater chairs by replacing with 3" foam, leather seat cover, painting of frame and then grouting with anchor bolts in suitable places as per direction of engineer in charge.
Total impact of GST for the purpose of CTC
SANTOSHKUMAR RAI
shri D.P.RAI
mohd mufeez ur rehman
M/S GIRADKAR ASSOCIATES
SONAL ENTERPRISES
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .