| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.7 LAccepted-AOC | ₹13.7 L | L1 | Accepted-AOC Qualified in AOC |
| 2 | L2₹14.6 L+₹86,311.32 (6.29%)Rejected-AOC | ₹14.6 L+₹86,311.32 (6.29%) | L2 | Rejected-AOC Not Qualified in AOC |
| 3 | L3₹14.8 L+₹1.1 L (8.13%)Rejected-AOC | ₹14.8 L+₹1.1 L (8.13%) | L3 | Rejected-AOC Not Qualified in AOC |
| 4 | L4₹14.9 L+₹1.2 L (8.56%)Rejected-AOC | ₹14.9 L+₹1.2 L (8.56%) | L4 | Rejected-AOC Not Qualified in AOC |
| 5 | L5₹15.0 L+₹1.2 L (9.02%)Rejected-AOC | ₹15.0 L+₹1.2 L (9.02%) | L5 | Rejected-AOC Not Qualified in AOC |
| Sl No | Description | Qty | Unit | T.SEEMAN L8 | sriramulu L6 | KALAIMANI VIJAYAGOPAL L7 | N.Sriramulu L5 | A.SANKAR L9 | S.Muralikumar L12 | SATHEESH CONSTRUCTIONS L3 | Veerajaconstructions L13 | SENDHAMARAI L1 | V.DHEENATHAYALAN L2 | Mageshkumar L4 | GP Enterprises L11 | SSM INFRA CONSTRUCTION L10 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earht work excavation in all clauses of soil and subsoil to full depth as may be directed except hard rock including all materials to site etc complete. As Per SS 2`0B | 52.63 | CUM | 243.3 ₹12,804.88 | 240 ₹12,631.2 | 100 ₹5,263 Lowest | 239 ₹12,578.57 | 245 ₹12,894.35 | 260 ₹13,683.8 | 237 ₹12,473.31 | 251 ₹13,210.13 | 263 ₹13,841.69 | 232.1 ₹12,215.42 | 238 ₹12,525.94 | 201 ₹10,578.63 | 226.79 ₹11,935.96 |
| 2.00 | Cement concrete 1:4:8 mix using 40mm HBG metal including cost and convenyance all materials to site etc complete. | 12.71 | CUM | 4,943.2 ₹62,828.07 | 4,851 ₹61,656.21 | 5,000 ₹63,550 | 4,837 ₹61,478.27 | 4,958 ₹63,016.18 | 4,800 ₹61,008 | 4,797 ₹60,969.87 | 5,083 ₹64,604.93 | 4,000 ₹50,840 Lowest | 4,716.1 ₹59,941.63 | 4,816 ₹61,211.36 | 4,600 ₹58,466 | 4,649.68 ₹59,097.43 |
| 3.00 | Reinforced Cement concrete 1:1.5:3 using 20mm ISS HBG metal including cost and convenyance all materials to site etc complete | 22.25 | CUM | 8,386.05 ₹1,86,589.61 | 8,228 ₹1,83,073 | 8,800 ₹1,95,800 | 8,206 ₹1,82,583.5 | 8,410 ₹1,87,122.5 | 8,800 ₹1,95,800 | 8,138 ₹1,81,070.5 | 8,623 ₹1,91,861.75 | 7,500 ₹1,66,875 Lowest | 8,000.75 ₹1,78,016.69 | 8,169 ₹1,81,760.25 | 7,500 ₹1,66,875 Lowest | 8,122.15 ₹1,80,717.84 |
| 4.00 | Supplying and Erecting centering for Rcc itmes of works as per design including cost of shutting and labour chargers etc complete | 32.07 | SQM | 506 ₹16,227.42 | 497 ₹15,938.79 | 450 ₹14,431.5 Lowest | 496 ₹15,906.72 | 508 ₹16,291.56 | 500 ₹16,035 | 492 ₹15,778.44 | 521 ₹16,708.47 | 500 ₹16,035 | 482.75 ₹15,481.79 | 494 ₹15,842.58 | 480 ₹15,393.6 | 475.27 ₹15,241.97 |
| 5.00 | Supplying and Erecting centering for Rcc itmes of works as per design including cost of shutting and labour chargers etc complete | 133.74 | SQM | 1,012.9 ₹1,35,465.25 | 994 ₹1,32,937.56 | 900 ₹1,20,366 | 991 ₹1,32,536.34 | 1,016 ₹1,35,879.84 | 1,000 ₹1,33,740 | 983 ₹1,31,466.42 | 1,041 ₹1,39,223.34 | 800 ₹1,06,992 Lowest | 966.35 ₹1,29,239.65 | 987 ₹1,32,001.38 | 1,010 ₹1,35,077.4 | 950.36 ₹1,27,101.15 |
| 6.00 | Supplying and Fabricating and placing in position MS steel or ribbed for steel for all reinforced cement 5 concrete works as per the design given jncluding cost of steel and binding wire in all floors ete, Complete complying with stanard specification. | 2.25 | MT | 84,968.65 ₹1,91,179.46 | 83,362 ₹1,87,564.5 | 91,500 ₹2,05,875 | 83,132 ₹1,87,047 | 85,199 ₹1,91,697.75 | 83,000 ₹1,86,750 | 82,444 ₹1,85,499 | 87,358 ₹1,96,555.5 | 70,000 ₹1,57,500 | 81,064.7 ₹1,82,395.57 | 82,765 ₹1,86,221.25 | 40,000 ₹90,000 Lowest | 89,883.5 ₹2,02,237.88 |
| 7.00 | Brick work in CM 1 :5mix using country bricks including cost and convenyance all materials to site etc complete. | 13.55 | CUM | 5,642.5 ₹76,455.88 | 5,537 ₹75,026.35 | 5,800 ₹78,590 | 5,521 ₹74,809.55 | 5,659 ₹76,679.45 | 5,900 ₹79,945 | 5,476 ₹74,199.8 | 5,802 ₹78,617.1 | 5,000 ₹67,750 Lowest | 5,383.25 ₹72,943.04 | 5,497 ₹74,484.35 | 5,100 ₹69,105 | 5,462 ₹74,010.1 |
| 8.00 | Brick work in CM 1 :5mix using country bricks including cost and convenyance all materials to site etc complete. | 20.83 | CUM | 5,728.5 ₹1,19,324.65 | 5,621 ₹1,17,085.43 | 5,800 ₹1,20,814 | 5,606 ₹1,16,772.98 | 5,745 ₹1,19,668.35 | 5,900 ₹1,22,897 | 5,559 ₹1,15,793.97 | 5,890 ₹1,22,688.7 | 5,000 ₹1,04,150 Lowest | 5,465.3 ₹1,13,842.2 | 5,581 ₹1,16,252.23 | 5,100 ₹1,06,233 | 5,542 ₹1,15,439.86 |
| 9.00 | Plastering with CM 1:5,mix using 12mm thick including cost and convenyance all materials to site etc complete | 323.17 | SQM | 260.85 ₹84,298.89 | 256 ₹82,731.52 | 200 ₹64,634 Lowest | 255 ₹82,408.35 | 262 ₹84,670.54 | 270 ₹87,255.9 | 253 ₹81,762.01 | 268 ₹86,609.56 | 250 ₹80,792.5 | 248.85 ₹80,420.85 | 254 ₹82,085.18 | 250 ₹80,792.5 | 236.76 ₹76,513.73 |
| 10.00 | Applying of two coats of Putty 3mm Thick. including cost and convenyance all materials to site etc | 55.69 | SQM | 271 ₹15,091.99 | 266 ₹14,813.54 | 200 ₹11,138 Lowest | 265 ₹14,757.85 | 272 ₹15,147.68 | 300 ₹16,707 | 263 ₹14,646.47 | 279 ₹15,537.51 | 250 ₹13,922.5 | 258.55 ₹14,398.65 | 264 ₹14,702.16 | 310 ₹17,263.9 | 257.6 ₹14,345.74 |
Tender Value
₹17.1 L
EMD Value
₹17,100
Closing Date
3 Jul 2026, 3:00 pmClosed
The Block Development officer BP
Panchayat Union office Building at Pavunjur
Construction of Anganvadi Centers Mugaiyur 1 at Mugaiyur Panchayat in Lathur Panchayat Union in Chengalpattu district.
2026_RDTN_681552_1
Tender Notice No . 045/2024/DSO Date.14.03.2026
Open Tender
Civil Works
Item Rate
Construction of Anganvadi Centers Mugaiyur 1 at Mu
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹17,100
Yes
14 Jul 2026
18 Jun 2026
3 Jul 2026
18 Jun 2026
3 Jul 2026
18 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earht work excavation in all clauses of soil and subsoil to full depth as may be directed except hard rock including all materials to site etc complete. As Per SS 2`0B | 52.63 | CUM | 263.78 | ₹13,882.74 |
| 2 | Cement concrete 1:4:8 mix using 40mm HBG metal including cost and convenyance all materials to site etc complete. | 12.71 | CUM | 5,344.82 | ₹67,932.66 |
| 3 | Reinforced Cement concrete 1:1.5:3 using 20mm ISS HBG metal including cost and convenyance all materials to site etc complete | 22.25 | CUM | 9,066.52 | ₹2,01,730.07 |
| 4 | Supplying and Erecting centering for Rcc itmes of works as per design including cost of shutting and labour chargers etc complete | 32.07 | SQM | 547.5 | ₹17,558.33 |
| 5 | Supplying and Erecting centering for Rcc itmes of works as per design including cost of shutting and labour chargers etc complete | 133.74 | SQM | 1,095 | ₹1,46,445.3 |
| 6 | Supplying and Fabricating and placing in position MS steel or ribbed for steel for all reinforced cement 5 concrete works as per the design given jncluding cost of steel and binding wire in all floors ete, Complete complying with stanard specification. | - | MT | 91,858.5 | - |
| 7 | Brick work in CM 1 :5mix using country bricks including cost and convenyance all materials to site etc complete. | 13.55 | CUM | 6,101.12 | ₹82,670.18 |
| 8 | Brick work in CM 1 :5mix using country bricks including cost and convenyance all materials to site etc complete. | 20.83 | CUM | 6,193.99 | ₹1,29,020.81 |
| 9 | Plastering with CM 1:5,mix using 12mm thick including cost and convenyance all materials to site etc complete | 323.17 | SQM | 282.43 | ₹91,272.9 |
| 10 | Applying of two coats of Putty 3mm Thick. including cost and convenyance all materials to site etc | 55.69 | SQM | 293.28 | ₹16,332.76 |
stage.html
html • 0.07 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.09 MB
Technical.pdf
Tender Documents • 0.29 MB
BOQ_819106.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .