Tender ID
Tender Value
₹2.2 Cr
EMD Value
₹13.2 L
Closing Date
31 Mar 2026, 12:00 pmClosed
S.E. Sultanpur-Amethi Circle, U.P.P.W.D. Sultanpur
S.E. Sultanpur-Amethi Circle, U.P.P.W.D. Sultanpur
Construction work and 5-year maintenance work of the link road from Inhauna Maharajganj road Ratwalia to Sarvjeet Bazar road via Dandupur
2026_CEUFZ_1129965_2
1175/1com-Sul.A.Cir./2025-26 Date 20-03-2026
Open Tender
Civil Works - Roads
Fixed-rate
365 days
AMETHI
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹13.2 L
Yes
S.E. Sultanpur-Amethi Circle, U.P.P.W.D. Sultanpur
1 Apr 2026
26 Mar 2026
31 Mar 2026
26 Mar 2026
31 Mar 2026
26 Mar 2026
28 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in cutting or in embankment in ordinaryh soil, excavation to be the from of regular pits not exceeding 1/2 meter in depth and earthwork in embankment to be in 20 CM. layers inclusing ramming and dressing the surface to required levels and slopes and also including 1.50 meter lift and 30 meter lead. the earth from cutting to be used in making embankment or to be desposited as spoil banks withen 30 m. (100Ft) distance as directed by the Engineer-in Charge. | |||||
| 2Providing, laying and spreading Material on a prepared Sub grade, adding cement @ 2% by weight to the spread Material manually mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base. | |||||
| 3Construction of Granular sub base by providing well graded material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and complacting with smooth wheel roller to achieved the desired density. complete as per clause 401. | |||||
| 4Providing, laying and spreading Material on a prepared Sub base, adding cement @ 4% by weight to the spread Material manually mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of base. | |||||
| 5Providing and applying tack coat with bitumen VG - 10 using emulsion pressure distributor at the rate of 0.35 kg per sqm on the prepared dry and hungry bituminous surface cleaned with hydraulic broom as per technical specicification Clause 503. | |||||
| 6Providing and laying rolling of open graded premix carpet of 20 mm thickness composed of 13.2 mm to 11.2 mm aggreates using VG-10 Grade Bitumen to required line, grade and level to serve as wearing course on a previously prepared base by manual means, including mixing in a suitale plant, laying and rolling with a 3 wheel 8 - 10 tonne static roller capacity, finished to required level and grades to be followed by seal coat as per technical clause 508 | |||||
| 7Providing and laying seal coat Sealing the voids in a bituminous surface laid to the specified levels grade and cross fall using type C as per Technical specification clause 510 | |||||
| 8Earthwork in cutting or in embankment in ordinary soil, excavation to be in the from of regular pits not exceeding 1/2 metre in depth and earthwork in embankment to be in 20cm. Layers including ramming and dressing the surface to required levels and slopes and also including 1.5metre (5ft) lift and 30m.(100ft) lead. The earth from cutting to be used in making embankment or to be desposited as spoil banks within 30m.(100ft) distance as directed by the Engineer-in-Charge. | |||||
| 9Construction of H.P. culverts 350 mm and 900 mm dia NP3 H.P. Excavation in foundation in ordinary soil including lift 1.5mt and lead up to 30M and including filling, filling, watering, ramming of excavation earth and also complete with all respect. | |||||
| 10Concrete with 4cm gauge Stone ballast Coarse sand and cement in proportion (8:4:1) in foundation and under pipes including supply of all material, labour T&P etc. required for propr completion of the work as per S.L. 273 | |||||
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.13 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.17 MB
BOQ_2107902.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .