Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.5 LAdmitted-Finance | -0.03% | ₹7.5 L | L1 | Admitted-Finance |
| 2 | L2₹7.5 L+₹74.95 (0.01%)Admitted-Finance | -0.02% | ₹7.5 L+₹74.95 (0.01%) | L2 | Admitted-Finance |
| 3 | L3₹7.5 L+₹149.91 (0.02%)Admitted-Finance 70A 80 FEET ROAD JAROULI KANPUR | KANPUR | KANPUR | UTTAR PRADESH | -0.01% | ₹7.5 L+₹149.91 (0.02%) | L3 | Admitted-Finance |
Tender Value
₹7.5 L
EMD Value
₹15,000
Closing Date
10 Aug 2026, 12:00 pmClosed
EEREDAGRA
EEREDAGRA
6VIIKASH KHAND AKOLA K GRAM BAIMAN MAII 1KOLIBASTI2NAHAR MANDIRKPASS3PARTHLOKSARWJANIK ISTHALO PAR SAMMMER SABILE PUMP MAY TANI ADISTHAPAN
2026_REDUP_1172012_8
577/NIVIDA AGRA/2026-27 dt 01.7.2026
Open Tender
Civil Works
Percentage
90 days
AGRA
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹15,000
Yes
13 Aug 2026
4 Aug 2026
10 Aug 2026
4 Aug 2026
10 Aug 2026
4 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | E/work in excavation in foundation in ordinary soil including upto 1.50 mtr lift & lead up to 30.0 mtr etc. (S.I.No 251a) | 5.15 | SQM | 142.5 | ₹733.88 |
| 2 | Cement concrete in 1:5:10 cement ,F/sand and 40mm Brick ballast in foundation and under floor including supply of all material, labour , T & P etc. | 1.03 | SQM | 5,058.75 | ₹5,210.51 |
| 3 | M-150 class B/work in 1:4 cement & C/sand mortar in Foundation including supply of all material, labour , T & P etc. | 1.75 | kg | 5,367.5 | ₹9,393.13 |
| 4 | R.C.C. work in 1: 1.5 : 3 cement , C/sand & stone grit 12-20mm gauge in plinth & Door level Tie Beam including supply of all material, labour , T & P etc. | 0.67 | kg | 7,790 | ₹5,219.3 |
| 5 | MS Iron Work such as Rcc Work all charges etc | 1.58 | SQM | 7,811.85 | ₹12,342.72 |
| 6 | M-150 class B/work in 1:4 cement & C/sand mortar in super structure including supply of all material, labour , T & P etc. | 2.68 | N | 5,804.5 | ₹15,556.06 |
| 7 | 12mm thick plaster in 1:4 cement & c/sand mortar over smooth surface including supply of all material, labour , T & P etc. (S.I. No 586) | 14.4 | NOS | 190 | ₹2,736 |
| 8 | Cement concrete 1:1.5:3 (1 cement : 2 coarse sand : 4 graded stone of size 12.5mm nominal size) laid in one layer finished with floating coat of neat cement | 0.32 | NOS | 6,555 | ₹2,097.6 |
| 9 | Supply of 2.0H.P. Submersible pump Compton greaves or I.S.I. Mark single phase including all charges etc. | 3 | NOS | 16,007.5 | ₹48,022.5 |
| 10 | Supply of 125-150” dia P.V.C. pipe of approved quality I.S.I. Mark 6kg/ cm2 pressure including all charges etc. | 342 | SQM | 522.5 | ₹1,78,695 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.68 MB
SBDLKSHMAN.pdf
Tender Documents • 1.55 MB
BOQ_2206785.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .