Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.6 LAdmitted-Finance | ₹9.6 L | L1 | Admitted-Finance |
| 2 | L2₹16.9 LAdmitted-Finance | ₹16.9 L | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-Withdrawn from tender. |
| Sl No | Description | Qty | Unit | SREE RAGAVENDRA INDUSTRIAL ENGINEERS L1 | SPS ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.00 | Charges for inspection, Routine maintenance of package air conditioner in switch yard, UCB - I & II, ESP - I & II (16.5TR - 5 nos & 17 TR - 5 nos). This work involves checking and inspection, internal elerctrical supply connections, Inlet & outlet copper pipe, control panel box, blower and its motor, compressor, drier, expansion valves , bolts & nut tigntening, indoor/Outdoor cooling coil, cleaning the indoor and outdoor units's casing, (Cost of consumables items including hire charges forT& P's. ) | 310 | opns | 2,200 ₹6.8 L | 4,100 ₹12.7 L |
| 2.00 | Charges for replacement / rectification of 1 No 8.5TR compressor in package units near Switchyard control room at 15 mtr elevation this work involves dismantling the failed compressor and driers in inlet & outlet line, transporting the new / rectified compressor from 0 mtr to 15mtr elevation AC package unit room, fixing the new compressor, expansion valve, driers, connnecting with inlet & outlet copper pipes of the circuit by brazing, including hire charges for T & P's and cost of consumables. (Compressor will be supplied by board at free of cost). (Drier, expansion valve, Hand shut off valve is under contractor scope) | 8 | nos | 24,600 ₹2.0 L | 36,850 ₹2.9 L |
| 3.00 | Charges for removal of blower pulley, inspection of blower motor, replacing the blower V belts (A31) with new one, aligning the blowers, cleaning the pipelines, indoor units, filters, outdoor units, fixing out door fan motor & blade, conducting trial run and commissioning the AC package unit including hire charges for T & P's and cost of consumables (consumables item V belt A31, outdoor fan motor blade is under contractor scope) | 8 | nos | 9,650 ₹77,200 | 15,000 ₹1.2 L |
Tender Value
Refer Docs
EMD Value
₹13,700
Closing Date
16 Feb 2026, 2:00 pmClosed
CE NCTPS II
Office of Chief Engineer NCTPS II CHENNAI 120
NCTPS II SE MI MPM III AC Plant Routine and Breakdown maintenance in the 17TR
2026_EB_649498_1
CE NCTPS II SE M I O M 218 2025 26
Open Tender
Miscellaneous Works
364 days
SE MI NCTPS II
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹13,700
Yes
26 May 2026
31 Jan 2026
17 Feb 2026
31 Jan 2026
16 Feb 2026
31 Jan 2026
Charges for inspection, Routine maintenance of package air conditioner in switch yard, UCB - I & II, ESP - I & II (16.5TR - 5 nos & 17 TR - 5 nos). This work involves checking and inspection, internal elerctrical supply connections, Inlet & outlet copper pipe, control panel box, blower and its motor, compressor, drier, expansion valves , bolts & nut tigntening, indoor/Outdoor cooling coil, cleaning the indoor and outdoor units's casing, (Cost of consumables items including hire charges forT& P's. )
Charges for replacement / rectification of 1 No 8.5TR compressor in package units near Switchyard control room at 15 mtr elevation this work involves dismantling the failed compressor and driers in inlet & outlet line, transporting the new / rectified compressor from 0 mtr to 15mtr elevation AC package unit room, fixing the new compressor, expansion valve, driers, connnecting with inlet & outlet copper pipes of the circuit by brazing, including hire charges for T & P's and cost of consumables. (Compressor will be supplied by board at free of cost). (Drier, expansion valve, Hand shut off valve is under contractor scope)
Charges for removal of blower pulley, inspection of blower motor, replacing the blower V belts (A31) with new one, aligning the blowers, cleaning the pipelines, indoor units, filters, outdoor units, fixing out door fan motor & blade, conducting trial run and commissioning the AC package unit including hire charges for T & P's and cost of consumables (consumables item V belt A31, outdoor fan motor blade is under contractor scope)
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.65 MB
BOQ_778680.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid