Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.5 LAccepted-AOC | ₹13.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹13.7 LRejected-AOC | ₹13.7 L | L2 | Rejected-AOC L2 |
| 3 | L3₹17.8 LRejected-AOC 4 A 39 2 MACHADO NAGAR OPP APC COLLEGE TUTICORIN 2 | TUTICORIN | TAMIL NADU | 626202 | ₹17.8 L | L3 | Rejected-AOC L3 |
| 4 | L4₹26.3 LRejected-AOC 40 E SUNDARAVELPURAM 7TH STREET TUTICORIN 628 002 | TUTICORIN | TAMIL NADU | 628002 | ₹26.3 L | L4 | Rejected-AOC L4 |
| Sl No | Description | Qty | Unit | C.THENNARASU L2 | BANUMATHI ENTERPRISES L1 | ABR ENGINEERS L3 | S. MURUGAN CONTRACTOR L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Charges for carrying out shift duty operation work such as inspection and clearance given to coal handling control room operator to start the Primary crushers - 1A & 1B, Belt feeders BFD-9A & 9B, Conveyor-43, 46, RC-1 and arranging to attend the defects then and there in primary crusher house-I - After starting the system inspection of all the running equipments and condition of system informed to CHS-5 operator to start coal feeding- Checking the output segregating of foreign materials such as bigger size stones, iron, steel and other materials along with the ship coal and permit the coal under the size of 180mm only to the Secondary Crusher House I. Change the coal feeding either PC-1A system (or) PC-1B system by operating the flow divider, Rack & pinion gate direction as per the instruction of coal handling control room operator- checking the bearing temperate on both sides of drive/driven pulley of all conveyors, belt feeder pulleys and if temperature raising is to be entered in shift log book - Checking the oil level in crusher rotor bearing housing and all conveyors and belt feeders in gear boxes and top up if necessary also periodically providing servo coat 120 to crusher wheels - checking the condition of all the drive fluid coupling and connecting multidisc assembly bolts and inspect any oil spray noticed in the system - During coal feeding if any abnormalities found in system immediately stop the system and inform to control room – checking of all the running conveyor equipments & crushers, conveyor belt and adjusting the belt sway & tension if necessary and arranging to attend the defects then and there in primary crusher running equipments Assisting work for attending mechanical maintenance work in time to quick restoration of primary crusher and allied equipments Isolation and guiding to follow the mechanical maintenance LC works - Condition of all the running equipments position informed to the field maintenance engineer incharge. All the shift duty operation activities are entered in the shift log book etc., complete. | 350 | Operations | 13,65,000 ₹16.1 L | 13,51,000 ₹15.9 L | 17,76,250 ₹21.0 L | 26,25,000 ₹31.0 L |
Tender Value
Refer Docs
EMD Value
₹12,500
Closing Date
2 Jan 2026, 2:00 pmClosed
Chief Engineer/TTPS
O/o CE/TTPS
TTPS - ECHP-I - Attending Primary crusher house-I shift operation and allied works in 3 shifts such as inspection and operating the Primary crushers PC-1A 1B etc., at PCH-I
2025_EB_633442_1
CE/SE/MI/TTPS/55/2026-2027
Open Tender
Miscellaneous Works
365 days
TTPS
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹12,500
Yes
24 Mar 2026
17 Dec 2025
3 Jan 2026
17 Dec 2025
2 Jan 2026
17 Dec 2025
Charges for carrying out shift duty operation work such as inspection and clearance given to coal handling control room operator to start the Primary crushers - 1A & 1B, Belt feeders BFD-9A & 9B, Conveyor-43, 46, RC-1 and arranging to attend the defects then and there in primary crusher house-I - After starting the system inspection of all the running equipments and condition of system informed to CHS-5 operator to start coal feeding- Checking the output segregating of foreign materials such as bigger size stones, iron, steel and other materials along with the ship coal and permit the coal under the size of 180mm only to the Secondary Crusher House I. Change the coal feeding either PC-1A system (or) PC-1B system by operating the flow divider, Rack & pinion gate direction as per the instruction of coal handling control room operator- checking the bearing temperate on both sides of drive/driven pulley of all conveyors, belt feeder pulleys and if temperature raising is to be entered in shift log book - Checking the oil level in crusher rotor bearing housing and all conveyors and belt feeders in gear boxes and top up if necessary also periodically providing servo coat 120 to crusher wheels - checking the condition of all the drive fluid coupling and connecting multidisc assembly bolts and inspect any oil spray noticed in the system - During coal feeding if any abnormalities found in system immediately stop the system and inform to control room – checking of all the running conveyor equipments & crushers, conveyor belt and adjusting the belt sway & tension if necessary and arranging to attend the defects then and there in primary crusher running equipments Assisting work for attending mechanical maintenance work in time to quick restoration of primary crusher and allied equipments Isolation and guiding to follow the mechanical maintenance LC works - Condition of all the running equipments position informed to the field maintenance engineer incharge. All the shift duty operation activities are entered in the shift log book etc., complete.
C.THENNARASU (BID ID -1544736)
ABR ENGINEERS (BID ID -1549684)
S. MURUGAN CONTRACTOR (BID ID -1550563)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
BOQ_757856.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid