Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.0 CrAccepted-AOC | ₹4.0 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹4.1 Cr+₹6.0 L (1.50%)Rejected-Finance | ₹4.1 Cr+₹6.0 L (1.50%) | L2 | Rejected-Finance L2 |
Tender Value
₹5.7 Cr
EMD Value
₹11.5 L
Closing Date
10 Jan 2025, 12:00 pmClosed
SE, KFC, PWD KANNAUJ
OFFICE OF THE SE, KFC, PWD KANNAUJ
AS PER BOQ
2024_CEKNP_986544_1
5869 M/39 M-K.F.V./2024/KNJ Date 27.11.2024
Open Tender
Civil Works
Item Rate
365 days
KANNAUJ
AS PER NIT
2 documents required · 2 mandatory
₹2,714
₹11.5 L
Yes
SE, KFC, PWD KANNAUJ
30 Jan 2025
31 Dec 2024
10 Jan 2025
31 Dec 2024
10 Jan 2025
31 Dec 2024
31 Dec 2024
Amount
Clearing and Grubbing Road Land :- Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.
Excavation for Roadwork in soil with hydraulic excavator of 0.90 cum bucket capacity including cutting and loading in tippers trimming botton and side slopes, in accordance with rrequirements of lines, grades and cross sections and transporting to the embankment location with all lifts and lead upto 100 m
Construction of subgrade and earthen shoulders :-Construction of subgrade with approved material obtained from borrowpits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement to Table 300-2 (Lead 1 km Cartage Earth)
Construction of embankment with approved materials obtain from Right of way with all lifts and leads, transporting to site , spreading grading to required slope and compacting to meet requirement of table 300-2
Construction of embankment with approved materials obtain from Right of way with all lifts and leads, transporting to site , spreading grading to required slope and compacting to meet requirement of table 300-2 (Compaction)
Providing, laying, spreading and compacting graded stone aggregate of granular sub base (Gr-1) by providing closed graded material mixing in a mechanical by mix in place method at site at OMC, spreading in uniform layers with Rotravator on prepared surface & compacting with vibratory power roller to achieve the desired density complete as per clause-401
WMM Providing, laying and spreading of graded stoneaggregate (WMM) after mixing with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform single layer on sub base/subgrade and compacting with the road roller to achieve the desire density.
WMM+1% OPC Cement+3.5% Emulsion Providing, laying and spreading of graded stoneaggregate (WMM) after mixing with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying with 1% OPC cement and 3.50% emulsion in uniform single layer on sub base/subgrade and compacting with the road roller to achieve the desire density. MORTH Second Revision2019
Providing and laying 40mm thick bituminous concrete with Higher Capacity batch type HMP producing an average output of 25 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 509 complete in all respects
Const of sub - grade and earthe shoulders with approved materials obtain from Right of way pits with all lead and lift, transporting to site, spreading, grading to required slope and compacting to meet requirement of tables (Patari Work)
Const of sub - grade and earthe shoulders with approved materials obtain from Right of way pits with all lead and lift, transporting to site, spreading, grading to required slope and compacting to meet requirement of tables (Lead 1 km Cartage Earth)(Patari Work)
Earth work in excavation for structurees as per chapter-05 as per Sl. No. MORD 11.1
C.C. 1:3:6 in foundation with cement fine sand and stone ballast as MoRTH Specification.
Providing and laying of R.C.C. Hume pipe NP-3 600mm dia
Providing and laying of R.C.C. Hume pipe NP-3 900mm dia
1st class brick work with M-150 brick and cement mortar (cement:course sand) in 1:3 as per Sch PWD 307
Struck cement pointing with cement mortor 1:3 as MoRTH Specification
Providing and laying Ordinary kilometer stone as per drawing of IS code
Providing and laying Fifth kilometer stone as per drawing of IS code
Providing and laying Hectometer stone as per drawing of IS code
Maintenance of Bituminous Surface GO No. 17/2024/No-113/23-1-2024-23 1099/113/2023 Dt. 16.01.2024 Maintenance of 1st year after completion of work @0.00% of Cost of Construction of Work (Defect Liability Period)
Maintenance of 2nd year after completion of work @0.25% of Cost of Construction of Work
Maintenance of 3rd year after completion of work @ 0.50% of Cost of Construction of Work
Maintenance of 4th year after completion of work @ 0.75 % of Cost of Construction of Work
Maintenance of 5th year after completion of work @ 1.00 % of Cost of Construction of Work
LADLI CONSTRUCTION (BID ID -4839445)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .