Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.2 LAdmitted-Fee/PreQual/Technical/Finance | -0.01% | ₹4.2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L1₹4.2 LAdmitted-Fee/PreQual/Technical/Finance | -0.01% | ₹4.2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L1₹4.2 LAdmitted-Fee/PreQual/Technical/Finance | -0.01% | ₹4.2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L1₹4.2 LAdmitted-Fee/PreQual/Technical/Finance | -0.01% | ₹4.2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L1₹4.2 LAdmitted-Fee/PreQual/Technical/Finance | -0.01% | ₹4.2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹4.2 L
EMD Value
₹4,177
Closing Date
4 Aug 2026, 5:00 pmClosed
EE(Agril.), Ganjam Division, Berhampur
EE(Agril.), Ganjam Division, Berhampur inside RITE Campus, Rangeilunda
Construction of Boundary Wall for AEE(A) Office, Chhatrapur
2026_AGRIL_136667_5
EE(A), Ganjam-01 of 2026-27
Open Tender
Civil Works - Others
Percentage
90 days
AEE(A) Office, Chhatrapur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
EE(Agril.), Ganjam Division, Berhampur
₹4,177
Yes
21 Aug 2026
23 Jul 2026
6 Aug 2026
23 Jul 2026
4 Aug 2026
23 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling brick or stone masonary in lime or cement mortar under 3m height including stacking the useful materials for reuse and removing the debris within 50 m lead | 3.53 | cum | 1,630.32 | ₹5,755.03 |
| 2 | Foundation excavation in hard soil including levelling and dressing the bed and sides depositing muck within initial lead and lift etc | 21.19 | cum | 280.08 | ₹5,934.9 |
| 3 | Filling foundation and plinth with sand well watered and rammed including cost and conveyance and royality of sand etc. complete | 4.99 | cum | 890.2 | ₹4,442.1 |
| 4 | Cement concrete (1:4:8) using 4cm CBHG metal including cost,conveyance and royality of materials curing etc. complete | 6.06 | cum | 5,566.84 | ₹33,735.05 |
| 5 | Cement Concrete (1:2:4) with 12 mm CBHG chips for R.C.C. Works including hoisting and laying. | 2.09 | cum | 7,496.4 | ₹15,667.48 |
| 6 | Brickwork (1:6) with 23 cm FA Bricks having crushing strength 75 kg/sqcm in F&P including cost conveyance and royalty of materials curing etc complete | 6.52 | cum | 5,496.12 | ₹35,834.7 |
| 7 | Brickwork (1:6) with 23 cm FA Bricks having crushing strength 75 kg/sqcm in Super Structure including cost conveyance and royalty of materials curing etc complete | 14.21 | cum | 5,529.12 | ₹78,568.8 |
| 8 | Supplying,fitting & placing uncoated HYSD bar reinforcement as per drawing and technical specification including cost,conveyance and all taxes of steel/binding wire etc. | 4.29 | qntl | 9,439.41 | ₹40,495.07 |
| 9 | R.C.C Work in M-20 grade with 20 mm and downgrade CBHG chips a)Column Base & Plinth Beam | 6.29 | cum | 6,322.99 | ₹39,771.61 |
| 10 | b) Column | 1.47 | cum | 18,028.19 | ₹26,501.44 |
stage.html
html • 0.05 MB
finance_602693.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.08 MB
BOQ_602693.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .