Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 CrAdmitted-Finance | ₹5.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹6.8 Cr+₹1.9 Cr (37.4%)Admitted-Finance 1 AL SHEIKH COMPLEX 1ST FLOOR PEERBAGH CHOWK SRINAGAR PEERBAGH SRINAGAR BUDGAM JAMMU KASHMIR 190014 | BUDGAM | JAMMU AND KASHMIR | 190014 | ₹6.8 Cr+₹1.9 Cr (37.4%) | L2 | Admitted-Finance |
| 3 | L3₹7.0 Cr+₹2.0 Cr (40.9%)Admitted-Finance | ₹7.0 Cr+₹2.0 Cr (40.9%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S SYED NOORULLAH RIZVI L3 | M/S ALBURAQ INFRATECH PRIVATE LIMITED L1 | M/S Sofi Brothers L2 |
|---|---|---|---|---|---|---|
| 1.00Note: (i) Please refer Schedule 'A' Notes of tender documents. (ii) Unless otherwise specified, earth work and excavation shall be measured and paid separately. (iii) The Schedule 'A' Part - IX and Part - X are not estimated by MES and the estimated rate indicated as "Rs. 0.00" under Col.5 signifies this fact only. (iv) In case rate of any item is not quoted by the bidder, the rate for the same item will be considered as zero and no claim in this regard at later date will be entertained. | ||||||
| 2.00LUMPSUM/ OTHER PRE-PRICED PROVISIONAL SCHEDULES OF WORKS | ||||||
| 2.01 | Lump sum price worked out by the contractor for BUILDING WORKS carried forward from Pre-Priced Schedule 'A' Part-I. | 1 | Each | 4,73,82,411 ₹4,73,82,411 | 3,55,50,000 ₹3,55,50,000 Lowest | 5,35,00,000 ₹5,35,00,000 |
| 2.02 | Lump sum price worked out by the contractor for INTERNAL ELECTRIFICATION WORKS carried forward from Pre-Priced Schedule 'A' Part-II. | 1 | Each | 14,04,830.2 ₹14,04,830.2 Lowest | 17,00,000 ₹17,00,000 | 17,50,000 ₹17,50,000 |
| 2.03 | Lump sum price worked out by the contractor for INTERNAL WATER SUPPLY WORKS carried forward from Pre-Priced Schedule 'A' Part-III. | 1 | Each | 1,97,441.26 ₹1,97,441.26 Lowest | 2,43,000 ₹2,43,000 | 2,78,000 ₹2,78,000 |
| 2.04 | Lump sum price worked out by the contractor for AREA DRAINAGE WORKS carried forward from Pre-Priced Schedule 'A' Part-IV. | 1 | Each | 15,65,789 ₹15,65,789 | 12,00,000 ₹12,00,000 Lowest | 16,00,000 ₹16,00,000 |
| 2.05 | Lump sum price worked out by the contractor for ROAD/ PATH/ HARDSTANDING WORKS carried forward from Pre-Priced Schedule 'A' Part-V. | 1 | Each | 6,49,346.45 ₹6,49,346.45 | 6,00,000 ₹6,00,000 | 5,90,000 ₹5,90,000 Lowest |
| 2.06 | Lump sum price worked out by the contractor for PROTECTIVE WORKS carried forward from Pre-Priced Schedule 'A' Part-VI. | 1 | Each | 67,52,689 ₹67,52,689 | 50,00,000 ₹50,00,000 Lowest | 58,50,000 ₹58,50,000 |
| 2.07 | Lump sum price worked out by the contractor for SEWAGE DISPOSAL WORKS carried forward from Pre-Priced Schedule 'A' Part-VII. | 1 | Each | 2,50,000 ₹2,50,000 Lowest | 3,00,000 ₹3,00,000 | 3,50,000 ₹3,50,000 |
| 2.08 | Lump sum price worked out by the contractor for SITE CLEARANCE & EARTHWORKS carried forward from Pre-Priced Schedule 'A' Part-VIII. | 1 | Each | 87,00,000 ₹87,00,000 | 18,00,000 ₹18,00,000 Lowest | 25,00,000 ₹25,00,000 |
Tender Value
₹3.8 Cr
EMD Value
₹4.5 L
Closing Date
14 Oct 2025, 6:00 pmClosed
CE 31 Srinagar Zone
HQ CE 31 Srinagar Zone
PROVISION OF 10 x GUARD ROOMS WITH ELEVATED SENTRY POSTS AT Z-GALI UNDER GE 874 EWS
2025_MES_703263_3
800162
Open Tender
Civil Works
Lump-sum
600 days
GE 874 EWS
As per tender documents
12 documents required · 12 mandatory
₹2,000
GE 874 EWS
₹4.5 L
Yes
24 Oct 2025
12 Sept 2025
16 Oct 2025
12 Sept 2025
14 Oct 2025
27 Sept 2025
12 Sept 2025 - 17 Sept 2025
Amount
Note: (i) Please refer Schedule 'A' Notes of tender documents. (ii) Unless otherwise specified, earth work and excavation shall be measured and paid separately. (iii) The Schedule 'A' Part - IX and Part - X are not estimated by MES and the estimated rate indicated as "Rs. 0.00" under Col.5 signifies this fact only. (iv) In case rate of any item is not quoted by the bidder, the rate for the same item will be considered as zero and no claim in this regard at later date will be entertained.
LUMPSUM/ OTHER PRE-PRICED PROVISIONAL SCHEDULES OF WORKS
Lump sum price worked out by the contractor for BUILDING WORKS carried forward from Pre-Priced Schedule 'A' Part-I.
Lump sum price worked out by the contractor for INTERNAL ELECTRIFICATION WORKS carried forward from Pre-Priced Schedule 'A' Part-II.
Lump sum price worked out by the contractor for INTERNAL WATER SUPPLY WORKS carried forward from Pre-Priced Schedule 'A' Part-III.
Lump sum price worked out by the contractor for AREA DRAINAGE WORKS carried forward from Pre-Priced Schedule 'A' Part-IV.
Lump sum price worked out by the contractor for ROAD/ PATH/ HARDSTANDING WORKS carried forward from Pre-Priced Schedule 'A' Part-V.
Lump sum price worked out by the contractor for PROTECTIVE WORKS carried forward from Pre-Priced Schedule 'A' Part-VI.
Lump sum price worked out by the contractor for SEWAGE DISPOSAL WORKS carried forward from Pre-Priced Schedule 'A' Part-VII.
Lump sum price worked out by the contractor for SITE CLEARANCE & EARTHWORKS carried forward from Pre-Priced Schedule 'A' Part-VIII.
INTERNAL ELECTRIFICATION WORKS (SCHEDULE 'A' PART-IX)
S&F of LEB bulb, B22 type, 14 watt complete all as specified and directed.
M&L for providing/ cutting the round/square hole of required size in wall finishing the disturbed surfaces as per existing finishes and Supply and fixing of MS ventilating fans, single phase, 230 Volts, 300mm and supply & grouting the ragged bolts in wall, fixing the frame on the exhaust side (outer surface of the wall) and connevting including PVC insulated three core 1.5mm copper cable from ceiling rose to exhaust fan motor and writting MES No. with black synthetic enamel paint 2.0 cm size complete all as specified and directed.
M&L for Earthing complete with galvanised steel earth plate electrode 60cm x 60cm x6 mm thick buried directly in gound (earth pit not less than 2.25 mtr deep below normal ground level) with top edge of plate not less than 1.5 mtr below normal ground level, connected to galvanised iron earth lead 4mm dia by means of bolt, nuts check nuts and washers of galvanised iron and galvanised iron wire 4.00 mm dia protected by provn of GI light grade pipe 15mm bore upto 7.5mtr including provision of concrete pit in PCC (1:2:4) type B-1 (using 20 mm graded crushed stone aggregates) with 50mm thick cover of precast RCC M-25 (Design Mix) reinforced with XPM (Weight not less than 3kg/Sqm) and frame of angle iron 25mmx25mmx3mm with lugs 02 Nos and with 6 mm dia MS bar handle made to shape, GI medium grade 20 mm bore pipe for watering perforated at bottom 1.75 mtr long placed on top edge of earth plate, common salt and charcoal filling, test point made out of Bronze/Gun metal with fixing arrangement, funnel, wire mesh and excavation/earth work in hard/dense soil, returning filling in and removal of surplus soil to a distance not exceeding 50 metre, all as per electrical plate No 3 of SSR -2009 Part -I and connecting to earth test point all as specified or indicated including testing on completion, complete all as specified and directed.
Note : (a) The quoted rate of earthing shall be deemed to include the cost of excavation & earth work in any type of soil. (b) The quoted rate of earthing shall be deemed to include the cost of charcoal and salt in alternate layers; 7.5 m long galvanised wire 4 mm dia, GI wire and GI light grade protection pipe and GI medium grade watering pipe. (c) The quoted rate of earthing shall be deemed to include the cost of funnel, wire mesh, lugs, PCC, RCC, XPM, frame work and including provisions of testing of test point, connecting to test point and all the tests on completion. (d) Any variation in length shall be adjusted through deviation order.
SEWAGE DISPOSAL WORKS (SCHEDULE 'A' PART-X)
M&L for construction of 10 users LLPDE Conventional Septic Tank with upflow filter including media designed to carry sewage and sullage water, including excavation in any type of soil in foundation in 100mm thick PCC (1:4:8) type D-2 (using 40 mm graded crushed stone aggregate) over 75mm thick hardcore over rammed earth, brick masonry in CM (1:4)including cast iron manhole cover having 6mm embedded plate embeded all around with angle iron frame vent shaft etc. complete all as specified, directed and shown on drawing.
M&L for construction of soakage well (brick masonary) of 1.2m internal dia and 3.00m deep below inlet level including necessary earth work filling with brick bats of guage 40 to 80mm, SWG inlet pipe junction 150mm bore including all other relevent works, complete all as specified, directed and shown on drawing.
M&L for Double Wall Corrugated (DWC) pipes of Class SN-4, IS-16098 (Part-II) of internal dia of size 150mm laid in trenches and jointed complete with couplers, bends, tees, reducers, etc complete all as specified and directed.
M/S Sofi Brothers (BID ID -3449668)
M/S SYED NOORULLAH RIZVI (BID ID -3440343)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .