Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAccepted-AOC HOUSE NO 59 ZOO NARENGI ROAD GEETANAGAR GUWAHATI 781021 ASSAM | KAMRUP METRO | ASSAM | 781021 | ₹1.0 Cr | L1 | Accepted-AOC L1 bidder |
| 2 | L2₹1.1 Cr+₹4.5 L (4.37%)Rejected-Finance OPP BSF GATE NO 3 AZARA GUWAHATI 17 ASSAM | ₹1.1 Cr+₹4.5 L (4.37%) | L2 | Rejected-Finance Other than L1 |
| 3 | L3₹1.1 Cr+₹5.1 L (4.93%)Rejected-Finance | ₹1.1 Cr+₹5.1 L (4.93%) | L3 | Rejected-Finance Other than L1 |
| 4 | L4₹1.1 Cr+₹12.1 L (11.8%)Rejected-Finance HOUSE NO 2 SATGAON MAIN ROAD NEAR BAILEY WATER FACTORY P O UDAYAN VIHAR DIST KAMRUP METRO GUWAHATI ASSAM 781171 | GUWAHATI | KAMRUP METRO | ASSAM | 781171 | ₹1.1 Cr+₹12.1 L (11.8%) | L4 | Rejected-Finance Other than L1 |
| 5 | L5₹1.3 Cr+₹25.7 L (25.1%)Rejected-Finance | ₹1.3 Cr+₹25.7 L (25.1%) | L5 | Rejected-Finance Other than L1 |
| Sl No | Description | Qty | Unit | LAXMI CONSTRUCTION L4 | SHIVAM TRANSCON PRIVATE LIMITED L1 | S.G.ENGINEERING COMPANY L5 | M/s Dhani Enterprise L2 | BAYAJ UDDIN MAZUMDER L6 | KESHAV ENTERPRISES L3 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | M&L for repair to potholes any depth n exc 1 sqm each including swweping free from dust and mud or water, scoring sunken surfaces in roads, paths etc, cutting around edges to atleast 25mm in depth, making good by filling in screened and graded road metals, watering and well ramming (including supply of road metal) and applying evenly a priming / tack coat cationic bituminous primer emulsion RS- 1 conforming to IS- 8887 @ of 0.7- 1 kg/ sqm complete all as specified and directed. | 4 | 10 SQM | 500 ₹2,000 Lowest | 1,750 ₹7,000 | 2,300 ₹9,200 | 1,550 ₹6,200 | 1,850 ₹7,400 | 4,059 ₹16,236 |
| 2.00 | Scarifying or picking gravelled, macadam or bituminous macadam surfaces in area not exceeding 400 sqm, depth exceeding 50 mm but not exceeding 100 mm complete all as specified and as directed. | 15 | 10 SQM | 500 ₹7,500 | 120 ₹1,800 | 90 ₹1,350 Lowest | 124 ₹1,860 | 550 ₹8,250 | 279 ₹4,185 |
| 3.00 | Screening road metal, chippings, etc. on the site of the work, when specially ordered, including removing screened materials clear of screen and stacking in separate heaps for measuring (Materials from both sides of screen measured) complete all as specified and as directed. | 3.5 | CUM | 1,000 ₹3,500 | 180 ₹630 | 300 ₹1,050 | 140 ₹490 Lowest | 900 ₹3,150 | 4,059 ₹14,206.5 |
| 4.00 | M & L for 7.5 cm thick (compacted thickness) WBM, with coarse aggregates of lime stone, sand stone, flint or quartzite of grading 2 (63 to 45 mm size) or of grading 3 (53 to 22.4 mm size), spread, rolled and compacted to required gradient and camber with three wheel-power roller of 80 to 100 kN capacity or an equivalent vibratory roller complete all as specified and as directed. | 10 | 10 SQM | 2,500 ₹25,000 | 2,500 ₹25,000 | 2,700 ₹27,000 | 2,450 ₹24,500 | 2,200 ₹22,000 Lowest | 2,799 ₹27,990 |
| 5.00 | M & L except materials for 7.5 cm thick (compacted thickness) WBM, with coarse aggregates of lime stone, sand stone, flint or quartzite of grading 2 (63 to 45 mm size) or of grading 3 (53 to 22.4 mm size), spread, rolled and compacted to required gradient and camber with three wheel-power roller of 80 to 100 kN capacity or an equivalent vibratory roller complete all as specified and as directed. | 5 | 10 SQM | 2,500 ₹12,500 | 1,000 ₹5,000 | 900 ₹4,500 Lowest | 1,350 ₹6,750 | 900 ₹4,500 Lowest | 1,899 ₹9,495 |
| 6.00 | Material and labour for preparing of un-surfaced WBM by brushing with wire brushes for removing caked mud etc sweeping with brooms and cleaning complete surfaces by applying mechnical air blower upto entire satisfaction of Engineer-in-charge and applying a prime coat of Catonic bitumen emulsion RS1 conforming to IS 8887 at a rate of application of 0.7-1 kg/Sqm on surface of WBM as specified in table 500-3 of MoRTH specification for Road and bridge work 2013 using mechanical sprayer complete all as specified and directed. | 15 | 10 SQM | 300 ₹4,500 | 500 ₹7,500 | 590 ₹8,850 | 185 ₹2,775 Lowest | 550 ₹8,250 | 459 ₹6,885 |
| 7.00 | "Material and labour for preparation of existing black top surfaces by brushing with wire brushes for removing caked mud, grass roots etc, sweeping with brooms and finally fanning the cleaned surface with gunny bags or compressed air to remove all loose, dirt, etc. and applying a prime / tack coat of Catonic bitumen emulsion RS1 conforming to IS 8887 at a rate of application of 0.20-0.30 kg/Sqm on new or old top surfaces as specified in table 500-3 of MoRTH specification for Road and bridge work 2013 using mechanical sprayer, complete all as specified and directed.
" | 1,735 | 10 SQM | 200 ₹3,47,000 Lowest | 300 ₹5,20,500 | 275 ₹4,77,125 | 255 ₹4,42,425 | 380 ₹6,59,300 | 279 ₹4,84,065 |
| 8.00 | Material and labour for providing premixed bituminous macadam laid/rolled and compacted to required gradient and camber using 8 to 10 tone capacity power roller (consolidated thickness 75mm or less) using paving bitumen (VG 30 Grade) @ 4% by weight of total mix complete all as specified and directed. Note:- (i) The exact bitumen content required shall be determined Mix Design procedure and approved by GE. The adjustment in rate on MINUS side variation in quantity of bitumen if any shall be priced at the rate of ₹67 per kg. No claim whatsoever shall be made for adjustment in plus side. (ii) Bituminous macadam shall be laid using self propelled hydrostatic paver finisher and preparation of mix shall be using hot mix plant and transporting the mix in tipper. | 150 | CUM | 8,000 ₹12,00,000 | 7,000 ₹10,50,000 Lowest | 7,500 ₹11,25,000 | 8,900 ₹13,35,000 | 9,950 ₹14,92,500 | 9,999 ₹14,99,850 |
| 9.00 | M & L for bituminous premixed carpet, 40 mm consolidated thickness with 0.54 cum of stone chippings mixed with 29.2 kg of binder (using paving bitumen VG30 grade), rolled and compacted to required camber and gradient with 8 to 12 tonne power roller, complete all as specified and as directed. | 1,735 | 10 SQM | 4,500 ₹78,07,500 | 3,750 ₹65,06,250 | 4,800 ₹83,28,000 | 3,980 ₹69,05,300 | 4,420 ₹76,68,700 | 3,699 ₹64,17,765 Lowest |
| 10.00 | Material and labour for premixed sand seal coat with 0.06 cum of sand mixed with 6.8 kg of paving bitumen, applied and rolled to a uniform surface complete all as specified and directed. | 1,735 | 10 SQM | 700 ₹12,14,500 | 400 ₹6,94,000 | 370 ₹6,41,950 Lowest | 375 ₹6,50,625 | 750 ₹13,01,250 | 459 ₹7,96,365 |
Tender Value
₹1.4 Cr
EMD Value
₹2.2 L
Closing Date
19 Aug 2025, 6:00 pmClosed
CWE Shillong
HQ CWE Shillong, Spread Eagle Falls, Shillong - 793011
REPAIR AND MAINT OF ROAD, ROAD CARPETING, ROAD FIXTURES, FURNITURES, ROAD MARKINF PAINT AND PAVEMENT ALONG ROAD OF MD ACCN, OTM, ADM AREA AND CERTAIN OTHER ROADS IN AOR OF AGE B/R I UNDER GE NARANGI
2025_MES_720451_1
8885/NAR/E8
Open Tender
Civil Works - Roads
Item Rate
180 days
Narangi
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,000
GE Narangi
₹2.2 L
Yes
21 Oct 2025
15 Jul 2025
21 Aug 2025
15 Jul 2025
19 Aug 2025
5 Aug 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .