Tender Value
₹53.5 L
EMD Value
₹60,000
Closing Date
3 Nov 2022, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Electricity Transmission Circle Agra Kakraitha Road, Near Amar Ujala Press, Sikandara , Agra
Revetment of Tower at various line under ETD-I and ETD-III Agra
2022_UPTCL_733868_1
ET_52_ETC_A_22_ 23
Open Tender
Electrical Works
Lump-sum
120 days
Agra
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,080
EE_ETD_II_Agra
₹60,000
22 Nov 2022
1 Oct 2022
4 Nov 2022
1 Oct 2022
3 Nov 2022
1 Oct 2022
(A) Revetment on Tower No. 21 (C+5) 132 KV Agra (4)-Taj-Bhimnagri DC Line Under ETD-1 Agra. (B) Revetment on Tower No. 74 (C+10) 132 KV Bah(2)-Fatehabad line Under ETD-1 Agra.
Earth in evacation in foundation in ordinary soil including lifting etc. ( 166.600 + 185.220 ) 351.820 M3
Cement concrete in ration 1:4:8 with cement fine sand and 40 mm brick ballast in foundation including the cost of all labour material and T&P required for proper completion of work ( 14.696 + 16.368 ) = 31.064 m3
First class brick work ratio 1:4 with cement and using fine sand including cost of all labour and material and T&P required for proper completion of work ( 156.416 + 174.614 ) = 331.030 m3
Cement concrete in ration 1:2:4 on top with cement coarse sand and 20 mm stone ballast foundation including the cost of all labour material and T&P required for proper completion of work ( 11.176 + 12.488) = 23.664 m3
12 mm thick plaster in ratio of 1:4 with cement and fine sand with proper finishing and all labour and material and T&P required for proper completion of work ( 265.332 + 296.492 ) = 561.824 m3
Filling of earth under the floor and cavity back filling including the cost of earth obtained from outside the corporation area for proper completion of work including filling and leveling etc. ( 259.928+300.653) = 560.581 m3
First class brick work soiling of flooring which including laying of brick flat edge filling of sand in between the joints including preparation of base lying for soiling including cost of all labour and material and T&P required for proper completion of work. ( 243.360+306.250) = 549.610 m3
Top steel in plain work such as reinforced concrete or reinforced brick work (when not including in over all rates) wrought to required shape as necessary including bending for proper completion of work and including supply of steel its wastage ben, beam and authorized overlapping as required for proper completion of the work. 12 mm mildsteel ring 8 mm (Extra Bar) (1027.652+1130.670) = 2158.322 m3
(A) Revetment of Tower foundation of 132 KV Firozabad Pinahat Line at tower loaction no. 70A. (B) Revetment of Tower foundation of 132 KV Firozabad Pinahat Line at tower loaction no. 35A ( River Crossing) under ETD-III Agra as per drawing and specification. Following works are to be carried out by the contractor at site.
Excavation of earth with the help of T&P and labour, watering| and ramiming of excavated earth ( 144+120) 264 m3
Concrete with 40mm stone ballast, coarse sand and cement mortar in ratio 1:3:6 in foundation and under floor including the| cost of all material / labour and T&P etc. required for proper completion of satistactory work ( 22.08 + 18.4) = 40.48 m3
First class brick work for the construction of retaining wall in 1:4 mix ratio. cement and sand including the cost of material. labour and T&P ete. required for proper completion of job ( 314.64 + 214.32 ) = 528.96 m3
Concrete in plinth with 20mm stone ballast, coarse sand and cement mortar in ratio 1:2:4 including the cost of all maierial labour and 'T&P etc required for proper completion of work. ( 1.296 + 1.056 ) = 2.352 m3
Earth filling under floor and in area between tower foundation| and retaining wall in including the cost of soil to be obtained by the contractor from outside including watering, ramming and dressing of earth etc. complete with the cost of earth royalty, taxes. freight etc. with cost of material labour and T&P required for proper completion of work. ( 67.32 + 44.28) = 111.60 m3
First class brick work on edge floor laid including preparation of base to proper slope including supply of all material, labour| and T&P etc. required for proper completion of work ( 103.23 + 66.43 ) = 169.66 m2
12mm thick plaster work on wall & Top with cement and sand in ratio of 1:4 including cost of all material, labour and T&P required for proper completion of work. ( 435.87 + 303.87 ) = 739.74 m2
Reliance Enterprises
ANSH ELECTRICAL AND ENGINEERING WORKS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .