Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.3 LAccepted-AOC 34 C R AVENUE JABAKUSUM HOUSE 3RD FLOOR ROOM NO 312 KOLKATA 700 012 | KOLKATA | WEST BENGAL | 700012 | L1 | Accepted-AOC Due to L1 | |
| 2 | L2₹28.5 L+₹1.8 L (6.79%)Rejected-Finance 107 1A TOLLYGAUNG ROAD KOLKATA 700026 WB | KOLKATA | WEST BENGAL | 700026 | L2 | Rejected-Finance BEING L2 BIDDER | |
| 3 | L3₹29.1 L+₹2.4 L (9.00%)Rejected-Finance 2 10 PANCHANANTALA ROAD KOLKATA 700 041 | KOLKATA | WEST BENGAL | 700041 | L3 | Rejected-Finance BEING L3 BIDDER | |
| 4 | L4₹30.3 L+₹3.6 L (13.4%)Rejected-Finance 10 1 GROUND FLOOR WEST GHOSH PARA JAGATDAL JAGATDAL JAGATDAL NORTH 24 PARGANAS WEST BENGAL 743125 | 24 PARAGANAS NORTH | WEST BENGAL | 743125 | L4 | Rejected-Finance BEING L4 BIDDER | |
| 5 | L5₹30.7 L+₹4.0 L (14.9%)Rejected-Finance VILL PUILLYA PO UNSANI DISTT HOWRAH PIN 711302 | HOWRAH | WEST BENGAL | 711302 | L5 | Rejected-Finance BEING L5 BIDDER |
| Sl No | Description | Qty | Unit | RADHA ENTERPRISE L4 | Tirupati Buildcon Pvt. Ltd. L1 | THE PLANTERS ENGINEERING CORPORATION L8 | ARJUN DAS VALECHA L2 | PRABIR TRADERS L5 | MAKLOYED ELECTRICAL ENTERPRISES L6 | ARATI TRADING CO L3 | PINKY CO. L7 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in trenches in any type of soil not exceeding 1.5 meter wide and not exceeding 1.5M in depth for laying of Cables, poles, stay and getting out of excavated material complete all as specified and directed by Engineer-in-Charge | 121.5 | CUM | 305 ₹37,057.5 | 303 ₹36,814.5 | 377 ₹45,805.5 | 329 ₹39,973.5 | 284 ₹34,506 Lowest | 340 ₹41,310 | 290 ₹35,235 | 365 ₹44,347.5 |
| 2.00 | Excavation in Trenches exc. for each additional 1.5m or part thereof in depth beyond the first 1.5 m for laying of steel tubular pole/Stays, etc., getting out including forming bottom surface to required level and gradient in Soft/ Loose Soil and getting out, complete all as specified and as directed. | 2 | CUM | 472 ₹944 | 402 ₹804 Lowest | 493 ₹986 | 436 ₹872 | 441 ₹882 | 445 ₹890 | 450 ₹900 | 450 ₹900 |
| 3.00 | Returning, filling in, including spreading, levelling, watering and well ramming in layers not exceeding 25cm thick each, excavated soil in trenches after the cables have been laid and tested complete all as specified and directed by Engineer-in-Charge | 76.61 | CUM | 80 ₹6,129 | 60 ₹4,596.75 Lowest | 77 ₹5,899.16 | 69 ₹5,286.26 | 73 ₹5,592.71 | 70 ₹5,362.88 | 75 ₹5,745.94 | 76 ₹5,822.55 |
| 4.00 | Removal of surplus soil to a distance not exc. 50m and deposited where directed at a level not exc. 1.5 m above the starting point all as specified and as directed. | 44.89 | Cum | 185 ₹8,304.19 | 150 ₹6,733.12 Lowest | 184 ₹8,259.3 | 162 ₹7,271.77 | 167 ₹7,496.21 | 166 ₹7,451.32 | 171 ₹7,675.76 | 156 ₹7,002.45 |
| 5.00 | M&L for sand cushioning as per para 19.75 of SSR Part-I(2009) in trenches for underground cable protection and consolidated and compacted with clean dry sand complete all as specified and directed by engineer-in-charge.
NOTE: Punned thickness only shall be measured for payment. | 96.45 | CUM | 1,600 ₹1,54,320 | 1,230 ₹1,18,633.5 Lowest | 1,532 ₹1,47,761.4 | 1,339 ₹1,29,146.55 | 1,372 ₹1,32,329.4 | 1,381 ₹1,33,197.45 | 1,400 ₹1,35,030 | 1,600 ₹1,54,320 |
| 6.00 | M&L for Brick protection with subclass ‘B’ bricks old size, laid dry, flat over cable perpendicular across the cable in trenches complete all as specified. | 2,100 | Each | 16 ₹33,600 | 10.5 ₹22,050 Lowest | 23 ₹48,300 | 18 ₹37,800 | 32 ₹67,200 | 20 ₹42,000 | 25 ₹52,500 | 16 ₹33,600 |
| 7.00 | Laying Only Serviceable Bricks after cleaning by wire brush obtained from taking out unserviceable LT cable in connected items here-in-after. | 1,500 | Each | 4 ₹6,000 | 2 ₹3,000 Lowest | 6 ₹9,000 | 3 ₹4,500 | 5.5 ₹8,250 | 3.6 ₹5,400 | 2.8 ₹4,200 | 3 ₹4,500 |
| 8.00 | Taking out of interlocking paver block, any shape or size and Re-laying the same after removing all vegetation, algae, grass etc, laid to proper slope & gradient over sand cushioning complete all as specified and directed.
(NOTE: Sand, if required for correction of cushioning level will be measured and paid separately. | 200 | Sqm | 228 ₹45,600 | 186 ₹37,200 Lowest | 245 ₹49,000 | 204 ₹40,800 | 211 ₹42,200 | 220 ₹44,000 | 215 ₹43,000 | 226 ₹45,200 |
| 9.00 | Material and labour for machine pressed precast concrete interlocking paver block with grey cement and pigment of any shape and size as approved by GE conforming to IS 15658-2006 of 60 mm thickness, M-35 grade complete all as specified and directed. | 200 | Sqm | 980 ₹1,96,000 | 911 ₹1,82,200 | 1,026 ₹2,05,200 | 890 ₹1,78,000 Lowest | 916 ₹1,83,200 | 925 ₹1,85,000 | 935 ₹1,87,000 | 987 ₹1,97,400 |
| 10.00Taking down unserviceable LT cable for repair/ replacement etc (from cable duct/underground trench / pole), stacking properly (cable, pipe and bricks) complete all as directed by the Engr-in-Charge of the following cross - sections :- (Note :- Necessary earth work to be measured and paid separately. | |||||||||||
Tender Value
₹25.5 L
EMD Value
₹51,000
Closing Date
21 May 2026, 6:00 pmClosed
Garrison Engineer (FW) Kolkata
D9 Commissariat Road Hastings Kolkata 700022
REPAIR/MAINT OF CERTAIN B/R and E/M WORK AT VARIOUS PUMP HOUSE AND WATER SUPPLY INSTALLATIONS INSIDE AND OUTSIDE VIJAY DURG UNDER GE(FW) KOLKATA
2026_MES_762996_1
8590/E8
Open Tender
Civil Works - Water Works
Item Rate
270 days
Garrison Engineer (FW) Kolkata
AS PER NIT
7 documents required · 7 mandatory
₹500
Garrison Engineer (FW) Kolkata
₹51,000
8 Aug 2026
30 Apr 2026
22 May 2026
30 Apr 2026
21 May 2026
14 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in trenches in any type of soil not exceeding 1.5 meter wide and not exceeding 1.5M in depth for laying of Cables, poles, stay and getting out of excavated material complete all as specified and directed by Engineer-in-Charge | 121.5 | CUM | - | - |
| 2 | Excavation in Trenches exc. for each additional 1.5m or part thereof in depth beyond the first 1.5 m for laying of steel tubular pole/Stays, etc., getting out including forming bottom surface to required level and gradient in Soft/ Loose Soil and getting out, complete all as specified and as directed. | 2 | CUM | - | - |
| 3 | Returning, filling in, including spreading, levelling, watering and well ramming in layers not exceeding 25cm thick each, excavated soil in trenches after the cables have been laid and tested complete all as specified and directed by Engineer-in-Charge | 76.61 | CUM | - | - |
| 4 | Removal of surplus soil to a distance not exc. 50m and deposited where directed at a level not exc. 1.5 m above the starting point all as specified and as directed. | 44.89 | Cum | - | - |
| 5 | M&L for sand cushioning as per para 19.75 of SSR Part-I(2009) in trenches for underground cable protection and consolidated and compacted with clean dry sand complete all as specified and directed by engineer-in-charge.
NOTE: Punned thickness only shall be measured for payment. | 96.45 | CUM | - | - |
| 6 | M&L for Brick protection with subclass ‘B’ bricks old size, laid dry, flat over cable perpendicular across the cable in trenches complete all as specified. | 2,100 | Each | - | - |
| 7 | Laying Only Serviceable Bricks after cleaning by wire brush obtained from taking out unserviceable LT cable in connected items here-in-after. | 1,500 | Each | - | - |
| 8 | Taking out of interlocking paver block, any shape or size and Re-laying the same after removing all vegetation, algae, grass etc, laid to proper slope & gradient over sand cushioning complete all as specified and directed.
(NOTE: Sand, if required for correction of cushioning level will be measured and paid separately. | 200 | Sqm | - | - |
| 9 | Material and labour for machine pressed precast concrete interlocking paver block with grey cement and pigment of any shape and size as approved by GE conforming to IS 15658-2006 of 60 mm thickness, M-35 grade complete all as specified and directed. | 200 | Sqm | - | - |
| 10 | Taking down unserviceable LT cable for repair/ replacement etc (from cable duct/underground trench / pole), stacking properly (cable, pipe and bricks) complete all as directed by the Engr-in-Charge of the following cross - sections :-
(Note :- Necessary earth work to be measured and paid separately. | - | - | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
BOQ_854665.xls
BOQ • 6.31 MB
pdfjoiner8590.pdf
Tender Documents • 1.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .