| 1 | Rejected-Technical | Rejected-Technical Non responsive in submission of requisite Experience |
| 2 | Rejected-Technical | Rejected-Technical Non responsive in submission of requisite Experience |
| 3 | Rejected-Technical KRAL PORA BAGH I MEHTAB NEAR MANCHOWA PETROL PUMP DISTRICT BUDGAM 190019 J K | BUDGAM | BUDGAM | J K | 190019 | Rejected-Technical Non responsive in submission of requisite Experience |
| 4 | Rejected-Technical | Rejected-Technical Non responsive in submission of requisite Experience |
Tender Value
₹38.0 L
EMD Value
₹75,906
Closing Date
27 Mar 2026, 2:00 pmClosed
Executive Engineer TLMD VIII
Office of Executive Engineer TLMD VIII Bemina Srinagar
System Strengthening Improvement scheme of 220kV Zainakote- Alustang-Mirbazar Transmission Line Section-II in Pulwama, Kulgam, Zawoora and Zabarwan areas.
2026_PDD_304130_1
TLMD-7/13 of 2025-26
Open Tender
Civil Works
Turn-key
60 days
TLMD-VII
As per SBD
9 documents required · 9 mandatory
₹1,000
Executive Engineer TLMD-VII Sgr. 0367010200000182
₹75,906
18 Apr 2026
23 Feb 2026
28 Mar 2026
23 Feb 2026
27 Mar 2026
24 Feb 2026
23 Feb 2026 - 18 Mar 2026
Design & supply of Galvanised HT STUBS For 4 number locations including drawings approval from any NIT or IIT
Allignment and levelling of new stub legs with respect to existing stub legs
Earthwork in excavation by manual means in trenches for foundations,, disposel of surplus earth as per the directions of Site Engineer
Backfilling of Pits inclusive of all carriage
Providing & laying of M-10 Grade with 20mm/40 mm aggregate including curing/Carriage & taxes
Providing/Laying of RCC in (M20) mix of Concrete in coulmns & Beams using crushed aggregates of 20mm nominal size including curing excluding steel reinforcement, Centering and shuttering. Inclusive of all taxes & carriages
Reinforcement for RCC work including supply straightening, bending. cutting.placing in position and binding all Kg complete, TMT bars FE-500D.inclusive of carriage & taxes
Close timbering/strutting in trenches in loose soil
Breaking of existing defective chimney along with raft and disposal of material.
Removal of Slip/Stone boulder Debries at tower location 115 Zawoora
Fixing of half stub leg by butt jointing including holing , bolting and alignment with other stub legs ( 1.5 m long) including casting of M20 Concrete as per drawings.
Dewatering of tower foundation during rectification of raft.
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.52 MB
SBD13.pdf
Tender Documents • 8.02 MB
BOQ_987955.xls
BOQ • 0.25 MB
EXT0113.pdf
PDF • 0.46 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .