Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 LAccepted-AOC | L1 | Accepted-AOC As Per Boq | |
| 2 | L2₹2.6 L+₹12,995.20 (5.24%)Rejected-AOC | L2 | Rejected-AOC As Per Boq | |
| 3 | L3₹2.9 L+₹39,084.80 (15.8%)Rejected-AOC | L3 | Rejected-AOC As Per Boq | |
| 4 | L4₹3.3 L+₹79,459.20 (32.1%)Rejected-AOC | L4 | Rejected-AOC As Per Boq | |
| 5 | L5₹3.3 L+₹81,443.20 (32.9%)Rejected-AOC | L5 | Rejected-AOC As Per Boq |
Tender Value
₹5.2 L
EMD Value
₹11,000
Closing Date
22 Oct 2022, 2:00 pmClosed
Executive Engineer
Executive Engineer , Irrigation Division-2, kushinagar
SILT CLEARANCE FROM KM 0.000 TO KM 5.800 OF BHELYA DY AND FROM KM 0.000 TO KM 4.000 OF BARAI DY
2022_UPIDC_737939_6
02/EE/2022-23
Open Tender
Civil Works
Item Rate
Executive Engineer, Irrigation Division-2, Kushina
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹11,000
Yes
17 Dec 2022
15 Oct 2022
22 Oct 2022
15 Oct 2022
22 Oct 2022
15 Oct 2022
Amount
SILT CLEARANCE FROM KM 0.000 TO KM 5.800 OF BHELYA DY AND FROM KM 0.000 TO KM 4.000 OF BARAI DY.
Silt clearance/trench didding including lift upto 1.5m and lead up to 30m, including cost of driver/assistant driver , POL , maintenance, contractor profit, taxes etc but excluding levelling, dressing & compaction.
RM/S M J K INFRATECH
dhananjay tiwari
Manoj kumar Mishra
aaditya constrcuction
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .