| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.2 LAccepted-AOC SCRPI BARDHAMAN BARDHAMAN 713363 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713363 | ₹13.2 L | L1 | Accepted-AOC tcr |
| 2 | L2₹13.6 LRejected-Finance S O PO PADAVESWAR PADAVESWAR PASCHIM BARDHAMAN WEST BENGAL INDIA 713346 | PADAVESWAR | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | ₹13.6 L | L2 | Rejected-Finance tcr |
| 3 | L3₹14.3 LRejected-Finance MADHAIPUR NATUNDANGA BURDWAN BARDHAMAN 713381 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713381 | ₹14.3 L | L3 | Rejected-Finance tcr |
| Sl No | Description | Qty | Unit | HAREKRISHNA ENTERPRISE L1 | PRASHANTA KABIRAJ L2 | PRANAB KUMAR SEN L3 |
|---|---|---|---|---|---|---|
| 1.00Transporting, Installation and commissioning of DSM 150/52 pump in 21L/1ED | ||||||
| 2.00 | Transporting of trolleys to pump site for loading of
pump, motor, base plate, pipes and HT starter | 1 | Ls | 11,600 ₹11,600 | 11,948 ₹11,948 | 12,545.4 ₹12,545.40 |
| 3.00 | Loading, Dismantling of Cage, lowering from pit no.3 of
DSM 150/52 Horizontal Split Casing pump, 3.3kV,
295kW FLP induction motor, base plate and 3.3kV,
300kW, FLP HT starter from surface workshop to Pit
bottom in RVII seam and than refitting of cage. | 1 | Ls | 77,251.79 ₹77,251.79 | 79,569.34 ₹79,569.34 | 83,547.81 ₹83,547.81 |
| 4.00 | Transporting of DSM 150/52 Horizontal Split Casing
pump, 3.3kV, 295kW FLP induction motor, base plate
and 3.3kV, 300kW, FLP HT starter from pit bottom in
RVII seam than RVII to RVIIA drift to 18L/2ED over
track line | 1 | Ls | 84,586.4 ₹84,586.40 | 87,123.99 ₹87,123.99 | 91,480.19 ₹91,480.19 |
| 5.00 | Transporting of DSM 150/52 Horizontal Split Casing
pump, 3.3kV, 295kW FLP induction motor, base plate
and 3.3kV, 300kW, FLP HT starter 18L/2ED to 21L/1ED
manually on floor by crossing installed conveyor belt
along 19L. | 1 | Ls | 56,390.93 ₹56,390.93 | 58,082.66 ₹58,082.66 | 60,986.79 ₹60,986.79 |
| 6.00 | Installation/levelling and alignment of complete pump
set including bed plate and motor on foundation with
laying of power cable and joining of suction and
delivery range with related supports and pipe range
valves and accessories. | 1 | Ls | 89,257.92 ₹89,257.92 | 91,935.66 ₹91,935.66 | 96,532.44 ₹96,532.44 |
| 7.00 | TranspoCommissioning of pump by priming, removing leakages
in suction and delivery during operationrting pump to drift | 1 | Ls | 12,119.49 ₹12,119.49 | 12,483.08 ₹12,483.08 | 13,107.23 ₹13,107.23 |
| 8.00 | 5 times lowering of pump set with rejoining of suction
range with related accessories and extension of
delivery pipe. | 1 | Ls | 1,48,763.2 ₹1.5 L | 1,53,226.1 ₹1.5 L | 1,60,887.4 ₹1.6 L |
| 9.00Installation of 3 Horizontal Split casing pump set with electricals in RVIIA seam at 19WD/18L | ||||||
| 10.00 | Loading at workshop, Unloading, Transportation of
95mm2, PVCDWA, 300m power cable manually from
Incline No.1 mouth to 750m in Incline to 200m drift
from RVII to RVIIA seam to GCPL substation at 17L/7
8WD. | 1 | Ls | 62,318.79 ₹62,318.79 | 64,188.35 ₹64,188.35 | 67,397.77 ₹67,397.77 |
Tender Value
₹13.2 L
EMD Value
₹16,500
Closing Date
27 Mar 2026, 4:00 pmClosed
General Manager Bankola Area
Office of The General Manager Bankola Area, PIN-713363
Installation and commissioning of 4sets of pump set with all electricals, water pipe range in RVIIA seam of Shyamsundarpur Colliery under Bankola area
2026_ECL_356874_1
ECL/GM/BA/E TENDER/25-26/ENM/401 Dt 17.03.2026
Open Tender
Electrical and Maintenance Works
45 days
Shyamsundarpur Colliery
Please refer to NIT document
4 documents required · 4 mandatory
₹16,500
10 Apr 2026
17 Mar 2026
28 Mar 2026
17 Mar 2026
27 Mar 2026
17 Mar 2026
17 Mar 2026 - 21 Mar 2026
Transporting, Installation and commissioning of DSM 150/52 pump in 21L/1ED
Transporting of trolleys to pump site for loading of pump, motor, base plate, pipes and HT starter
Loading, Dismantling of Cage, lowering from pit no.3 of DSM 150/52 Horizontal Split Casing pump, 3.3kV, 295kW FLP induction motor, base plate and 3.3kV, 300kW, FLP HT starter from surface workshop to Pit bottom in RVII seam and than refitting of cage.
Transporting of DSM 150/52 Horizontal Split Casing pump, 3.3kV, 295kW FLP induction motor, base plate and 3.3kV, 300kW, FLP HT starter from pit bottom in RVII seam than RVII to RVIIA drift to 18L/2ED over track line
Transporting of DSM 150/52 Horizontal Split Casing pump, 3.3kV, 295kW FLP induction motor, base plate and 3.3kV, 300kW, FLP HT starter 18L/2ED to 21L/1ED manually on floor by crossing installed conveyor belt along 19L.
Installation/levelling and alignment of complete pump set including bed plate and motor on foundation with laying of power cable and joining of suction and delivery range with related supports and pipe range valves and accessories.
TranspoCommissioning of pump by priming, removing leakages in suction and delivery during operationrting pump to drift
5 times lowering of pump set with rejoining of suction range with related accessories and extension of delivery pipe.
Installation of 3 Horizontal Split casing pump set with electricals in RVIIA seam at 19WD/18L
Loading at workshop, Unloading, Transportation of 95mm2, PVCDWA, 300m power cable manually from Incline No.1 mouth to 750m in Incline to 200m drift from RVII to RVIIA seam to GCPL substation at 17L/7 8WD.
Lifting of 2reels 95mm2, 250 PVCDWA, 1reel 70mm2, 250m PVCDWA cable to pit top, Dismantling of Cage and lowering of same to pit bottom and than refitting of cage
Transporting of Cable reels from pit bottom via drift from RVII to RVIIA seam upto 5D haulage
Unreeling and Laying of all power cables manually, i.e.95mm2 and 70mm2, 1050m long from 17L/7WD to 17L/10WD to 10L/10WD to 10L/19WD to 18L/19WD and hanging the same along the length
Loading and Transporting of 1 Nos. of 550V, 400A FLP breaker, 3 Nos. of 100kW FLP star delta starter from surface workshop to pit bottom and from pit bottom in RVII seam than RVII to RVIIA drift bottom over track line and than manually to 18L/19WD.
Loading and Transporting of 3 Nos. of Horizontal Split casing pump set (including motor, bed plate) from surface workshop to pit bottom and from pit bottom in RVII seam than RVII to RVIIA drift bottom over track line and than manually to 18L/19WD
Transporting, laying and jointing of 3nos. of 4" HDPE pipe delivery range from 18L/19WD to 10L/10WD (appx. 3x595m)
Cost of M.S. Nut bolt 5/8"x 4" and 5/8"x 2-1/2"for pipe range
CMPF amount limited to the amount as per labour payment certificate
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
techsummary_369756.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.67 MB
Tendernotice_2.pdf
PDF • 1.04 MB
BOQ_369756.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid