Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹40.3 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹41.3 L+₹1.0 L (2.51%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹41.5 L+₹1.2 L (3.01%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹46.9 L+₹6.6 L (16.4%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹47.2 L+₹6.9 L (17.1%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | jawaharlal jaiswal and co L1 | M/S SANTOSHI TRADERS L9 | M/S AK SINGH L2 | M/S DHAR AND DHAR L8 | MS SR CONSTRUCTION L3 | 4S ASSOCIATES L5 | M/S RK SAHA AND CO L10 | A M CHOUDHURY AND CO L6 | M/S DILIP GOSWAMI L4 | Chief Builders &Consultants L7 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 0.00NOTE:- (i) The bidders/contractors are advised to read tender document & all corrigendum / amendments and General conditions of contracts before entrying/quoting the rates. (ii) It is highlighted that the certain condition of General Condition of Contracts (IAFW-2249) has been modified as per direction of MoD i.e. inclusssion of Performance Security, deletion of Risk & Cost Provisions and increase in defect liability period all as per tender documents. The tenderers should keep in mind while quoting their offer. (iii) (Applicable for all items/parts):- The bidders/contractors are advised to refer Notes on BOQ/SCH'A' before entry/quoting the rates. | |||||||||||||
| 1.00 | Demolition of brick work or stone/boulder masonry, built in cement mortar including all quions, arches, pillers etc complete all as specified and as directed. | 7.31 | Cum | 350 ₹2,558.5 | 400 ₹2,924 | 250 ₹1,827.5 Lowest | 405 ₹2,960.55 | 720 ₹5,263.2 | 395 ₹2,887.45 | 410 ₹2,997.1 | 390 ₹2,850.9 | 389 ₹2,843.59 | 401 ₹2,931.31 |
| 2.00 | Demolition of stone slab or tiles of any description or thickness in floors or aprons etc (laid bedded and pointed in any mortar) complete all as specified and as directed. | 1.4 | 10 Sqm | 800 ₹1,120 | 445 ₹623 | 290 ₹406 Lowest | 442 ₹618.8 | 520 ₹728 | 435 ₹609 | 450 ₹630 | 430 ₹602 | 435 ₹609 | 441 ₹617.4 |
| 3.00 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing) removing serviceable tiles to store and rubbish off the premises complete all as specified and as directed. | 434.28 | Sqm | 95 ₹41,256.6 | 65 ₹28,228.2 | 55 ₹23,885.4 | 63.1 ₹27,403.07 | 35 ₹15,199.8 Lowest | 60 ₹26,056.8 | 65 ₹28,228.2 | 60 ₹26,056.8 | 61 ₹26,491.08 | 63 ₹27,359.64 |
| 4.00 | Dismantling plain or corrugated steel sheeting, any gauge, thickness including Nainital or similar pattern roof covering complete all as specified and as directed. | 294 | Sqm | 78 ₹22,932 | 20 ₹5,880 | 18 ₹5,292 Lowest | 20.4 ₹5,997.6 | 22 ₹6,468 | 19 ₹5,586 | 24 ₹7,056 | 21 ₹6,174 | 20 ₹5,880 | 20 ₹5,880 |
| 5.00 | Dismantling timber boarding of any description fixed in any position secured with nails complete all as specified and as directed. | 54 | Sqm | 95 ₹5,130 | 30 ₹1,620 | 25 ₹1,350 | 29.1 ₹1,571.4 | 20 ₹1,080 Lowest | 28 ₹1,512 | 30 ₹1,620 | 29 ₹1,566 | 28 ₹1,512 | 29 ₹1,566 |
| 6.00 | Dismantling Wall and ceiling boards (fibre,pulp, insulation, etc.) or insulation boards/slabs/blankets, any thickness, including cover fillets complete all as specified and as directed. | 152.44 | Sqm | 75 ₹11,433 | 30 ₹4,573.2 | 20 ₹3,048.8 Lowest | 28.8 ₹4,390.27 | 20 ₹3,048.8 Lowest | 28 ₹4,268.32 | 29 ₹4,420.76 | 28 ₹4,268.32 | 28.1 ₹4,283.56 | 29 ₹4,420.76 |
| 7.00 | Taking down wooden chowkats or frames with shutters with exceeding 1.50 Sqm but not exceeding 4.00 Sqm each (without taking of shutters from the frames) complete all as specified and as directed. | 28 | Each | 200 ₹5,600 | 265 ₹7,420 | 200 ₹5,600 | 265 ₹7,420 | 140 ₹3,920 Lowest | 260 ₹7,280 | 300 ₹8,400 | 260 ₹7,280 | 256 ₹7,168 | 264 ₹7,392 |
| 8.00 | Taking down wooden chowkats or frames with shutters with not exceeding 1.50 Sqm each (without taking of shutters from the frames) complete all as specified and as directed. | 32 | Each | 210 ₹6,720 | 205 ₹6,560 | 180 ₹5,760 | 207 ₹6,624 | 120 ₹3,840 Lowest | 200 ₹6,400 | 210 ₹6,720 | 205 ₹6,560 | 200 ₹6,400 | 205 ₹6,560 |
| 9.00 | Taking down cement plaster of any description built in cement mortar on brick or stone walls etc including racking out joints, hacking for Key, scrubbing down with water etc. complete all as specified and as directed. | 236.75 | Sqm | 14 ₹3,314.5 Lowest | 45 ₹10,653.75 | 40 ₹9,470 | 45.6 ₹10,795.8 | 40 ₹9,470 | 45 ₹10,653.75 | 50 ₹11,837.5 | 46 ₹10,890.5 | 44 ₹10,417 | 46 ₹10,890.5 |
Tender Value
₹43 L
EMD Value
₹86,000
Closing Date
22 Sept 2026, 6:00 pmClosed
GARRISON ENGINEER JORHAT
GARRISON ENGINEER JORHAT
SPECIAL REPAIR TO MD ACCN BLDG NO P183 AND PROVN OF EXHAUST FAN IN OTM ACCN AND ORs BATHROOM AT MARIANI UNDER GE JORHAT
2026_MES_785049_1
8349/GE/E8
Open Tender
Civil Works
Item Rate
180 days
GE JORHAT
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
GARRISON ENGINEER JORHAT
₹86,000
Yes
1 Oct 2026
18 Aug 2026
23 Sept 2026
18 Aug 2026
22 Sept 2026
15 Sept 2026
18 Aug 2026 - 26 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolition of brick work or stone/boulder masonry, built in cement mortar including all quions, arches, pillers etc complete all as specified and as directed. | 7.31 | Cum | - | - |
| 2 | Demolition of stone slab or tiles of any description or thickness in floors or aprons etc (laid bedded and pointed in any mortar) complete all as specified and as directed. | 1.4 | 10 Sqm | - | - |
| 3 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing) removing serviceable tiles to store and rubbish off the premises complete all as specified and as directed. | 434.28 | Sqm | - | - |
| 4 | Dismantling plain or corrugated steel sheeting, any gauge, thickness including Nainital or similar pattern roof covering complete all as specified and as directed. | 294 | Sqm | - | - |
| 5 | Dismantling timber boarding of any description fixed in any position secured with nails complete all as specified and as directed. | 54 | Sqm | - | - |
| 6 | Dismantling Wall and ceiling boards (fibre,pulp, insulation, etc.) or insulation boards/slabs/blankets, any thickness, including cover fillets complete all as specified and as directed. | 152.44 | Sqm | - | - |
| 7 | Taking down wooden chowkats or frames with shutters with exceeding 1.50 Sqm but not exceeding 4.00 Sqm each (without taking of shutters from the frames) complete all as specified and as directed. | 28 | Each | - | - |
| 8 | Taking down wooden chowkats or frames with shutters with not exceeding 1.50 Sqm each (without taking of shutters from the frames) complete all as specified and as directed. | 32 | Each | - | - |
| 9 | Taking down cement plaster of any description built in cement mortar on brick or stone walls etc including racking out joints, hacking for Key, scrubbing down with water etc. complete all as specified and as directed. | 236.75 | Sqm | - | - |
| 10 | Demolition of reinforced cement concrete in roofs, floors (other than ground floors), beams staircases, landing, chajjas and similar suspended work (reinforcement to be cut as required to facilitate demolition) complete all as specified and as directed. | 2.5 | Cum | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.68 MB
BOQ_879673.xls
BOQ • 7.00 MB
1_CONTENT_TO_NOTE_8349.pdf
Tender Documents • 0.74 MB
2_General_Condition_8349.pdf
Tender Documents • 0.77 MB
3_Spl_Con_8349.pdf
Tender Documents • 0.37 MB
4_PS_8349.pdf
Tender Documents • 1.60 MB
datecorriguedum.pdf
PDF • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .