Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹4.9 L
EMD Value
₹14,631
Closing Date
3 Jun 2026, 6:00 pmClosed
OFFICE OF THE EXECUTIVE ENGINEER REW ANANTNAG
OFFICE OF THE EXECUTIVE ENGINEER REW ANANTNAG
C/O PROTECTION BUND AT SPOTS AT GANG NHO SHOWKAT AHMAD S/O NIKA KHAN AND OTHERS BLOCK CHITTERGUL
2026_RDPR_311046_2
ENIT08of2026-27
Open Tender
Civil Works
Percentage
30 days
ANANTNAG
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
OFFICE OF THE EXECUTIVE ENGINEER REW ANANTNAG
₹14,631
4 Jun 2026
26 May 2026
4 Jun 2026
26 May 2026
3 Jun 2026
26 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | site clearence by way of Engaging labours for removal of debris bushs etc i/c disposal | - | No | - | - |
| 0.0 | Earth work in excavation in foundation trenches (not exceeding 1.5 m in width as well as 10 Sqm. in plan) including dressing of slides and ramming of bottoms, lift up to 1.50 m and disposal lead upto 1.5m. All kinds of Soil. | - | Cum | - | - |
| 0.0 | P/L of dry stone soling hand packed including all carriages | - | Cum | - | - |
| 0.0 | P/L in position C.C of specified grade excluding the cost of centring and shuttering 1: 3: 6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size). | 1 | Cum | - | - |
| 0.0 | P/L OF PLUMS | - | Cum | - | - |
| 0.0 | P/F Centring and shuttering including strutting, propping etc. and removal of formwork complete job | 1 | Sqm | - | - |
| 0.0 | Carriage of Sand/Agg. by MT of 35 KM & 100 m HL | - | Cum | - | - |
| 0.0 | Carriage of Soling/plums by 100 m HL | 1 | Cum | - | - |
| 0.0 | Carriage of cement, Shuttering by MT | - | Trip | - | - |
| 0.0 | Provision for signboard & photographs | - | L/S | - | - |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.33 MB
BOQ_1006958.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .