| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.9 LAccepted-AOC VILL PUNHANA GUD MANDI PUNHANA | L1 | Accepted-AOC Accepted | |
| 2 | L2₹11.1 L+₹21,245.99 (1.96%)Rejected-AOC GUDHALA VILL NANGLA DUDOLI PUNHANA 1225 8 2025R23859 | PUNHANA | NUH | HARYANA | 122508 | L2 | Rejected-AOC Reject | |
| 3 | L3₹11.3 L+₹41,997.89 (3.87%)Rejected-AOC | L3 | Rejected-AOC Reject |
Tender Value
₹9.9 L
EMD Value
₹24,000
Closing Date
3 Apr 2026, 12:00 pmClosed
Manish Sehrawat
Municipal Committee Punhana
Work of desilting / Cleaning and constrution of chambers
2026_HRY_511128_1
20265C46DE05 D434 4377 9D9D D10F0AC9D541340ULB
Open Tender
Civil Works
Works
190 days
MC Punhana
2 documents required · 2 mandatory
₹1,000
Yes
₹24,000
Yes
4 May 2026
26 Mar 2026
3 Apr 2026
26 Mar 2026
3 Apr 2026
26 Mar 2026
26 Mar 2026 - 3 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [1.JB016] JB016. 600 mm i/d [Rate] | - | Per Metre | 375 | - |
| 2 | [10.100.2]Cement Concrete 1:8:16 Flooring 2. Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. [Through Rate] | - | cum | 1,863 | - |
| 3 | [11.5.3]12 mm cement plaster of mix : 3. 1:4 (1 cement: 4 fine sand) [Through Rate] | - | Sqm | 113 | - |
| 4 | [13.29.2]Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works [Through Rate] | - | Kg. | 83 | - |
| 5 | [17.61.2]PIPE CULVERTS 2. Providing and Laying 600 mm dia Reinforced Cement Concrete Pipe NP3 / NP-4P /prestressed Concrete Pipe on First Class Bedding in Double Row
Providing and Laying Reinforced cement concrete pipe NP3 /NP-4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets 1000 mm dia, as per clause 2900 of MORT&H specifications [Through Rate] | - | Metre | 5,162 | - |
| 6 | [4.14.1]Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 1. All kinds of soil. [Through Rate] | - | cum | 83 | - |
| 7 | [6.14.1]Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) [Through Rate] | - | cum | 4,374 | - |
| 8 | [6.33.3]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 3. Cold twisted bars [Through Rate] | - | Kg. | 68 | - |
| 9 | [7.20.1]Brick work with common burnt clay modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand) [Through Rate] | - | cum | 4,287 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
BOQ_589910.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .