Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.5 LAccepted-Finance VILL 81 LAJPAT NAGAR DIST MATHURA | MATHURA | UTTAR PRADESH | 209402 | L1 | Accepted-Finance L1 | |
| 2 | L2₹5.9 L+₹46,835.30 (8.55%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹6.0 L+₹50,390.10 (9.20%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹6.1 L+₹63,932.75 (11.7%)Rejected-Finance | L4 | Rejected-Finance L4 |
| Sl No | Description | Qty | Unit | m/s rakesh kumar L4 | M/S TANVI CONSTRUCTION L1 | M/S YAMUNA EARTH MOVERS L2 | UDAY RAM L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Uprooting jhunds and moonj with disposal away from site.per Sqm. | 1,860 | M2 | 28.17 ₹52,396.2 | 25.72 ₹47,839.2 Lowest | 30 ₹55,800 | 28.28 ₹52,600.8 |
| 2.00 | Earth work in silt clearance including lift upto 1.50 m and lead upto 6.0 m with rough/partial dressing. The earth from clearance to be used in side embankment or to be disposed off on spoil bank or as directed by engineer-in-charge. (By Mechanical Means-Poklin) | 12,425 | M3 | 33.65 ₹4,18,101.25 | 30.86 ₹3,83,435.5 Lowest | 32 ₹3,97,600 | 33.68 ₹4,18,474 |
| 3.00 | Scrapping internal section of existing channel i.e. Bed & Slope with silt up to 5 cm per Sqm. | 35,300 | M2 | 4 ₹1,41,200 | 3.3 ₹1,16,490 Lowest | 4 ₹1,41,200 | 3.6 ₹1,27,080 |
Tender Value
₹7.5 L
EMD Value
₹15,000
Closing Date
19 Sept 2026, 11:00 amClosed
Executive Engineer
L.M.B.D.G.C., Mathura
Internal Clearance of Mahawan Dy. From Km 0.000 to Km. 16.400 For Rabi 1434 Year 2026-27
2026_UPIDC_1182854_34
04 EE Lower Mat 2026-27
Open Tender
Civil Works - Canal
Item Rate
20 days
L.M.B.D.G.C.
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,106
₹15,000
29 Sept 2026
14 Sept 2026
19 Sept 2026
14 Sept 2026
19 Sept 2026
14 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Uprooting jhunds and moonj with disposal away from site.per Sqm. | 1,860 | M2 | - | - |
| 2 | Earth work in silt clearance including lift upto 1.50 m and lead upto 6.0 m with rough/partial dressing. The earth from clearance to be used in side embankment or to be disposed off on spoil bank or as directed by engineer-in-charge. (By Mechanical Means-Poklin) | 12,425 | M3 | - | - |
| 3 | Scrapping internal section of existing channel i.e. Bed & Slope with silt up to 5 cm per Sqm. | 35,300 | M2 | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.22 MB
BOQ_2226236.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .