Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.4 LAccepted-Finance N A | NA | NA | 121004 | ₹7.4 L | L1 | Accepted-Finance Bid Accepted as the quoted rates are on lower sides compare to other bidders. |
| 2 | L2₹7.4 LRejected-Finance | ₹7.4 L | L2 | Rejected-Finance Bid Rejected due to higher side rates. |
| 3 | L3₹8.1 LRejected-Finance | ₹8.1 L | L3 | Rejected-Finance Bid Rejected due to higher side rates. |
Tender Value
₹7.0 L
EMD Value
₹7,003
Closing Date
6 May 2026, 2:40 pmClosed
Sr.Xen
Er.Rahul Puri Sr. Executive Engineer, Electrical Division, HPSEBL Haroli
NO/HED/13/2026-27
2026_HPSEB_135284_1
NO/HED/13/2026-27
Open Tender
Electrical Works
90 days
ED Haroli
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
₹7,003
23 May 2026
29 Apr 2026
6 May 2026
29 Apr 2026
6 May 2026
29 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1.01 | Erection Part of 11 KV HT Line (TS No 06/2026-27 | - | - | - | - | - |
| 2.01 | Erection of S.T Single Pole 9 Mtr. Long :- Digging of Pit,fixing of insulator, disc and drilling of holes in X-Arm , Bracing Set, Top Clamp, erection of pole, fixing of barbed wire and danger plate, filling of Pit, Alluminium Paint and ramming & painting of poles complete in all respect. | - | Job | 5,113 | - | 1111 |
| 3.01 | Erection of Tapping Structure S.T Double Pole 9 Mtr. Long - Digging of Pit fixing of insulator, disc and drilling of holes in X-Arm , Bracing Set, Top Clamp, erection of pole, fixing of barbed wire and danger plate, filling of Pit, Alluminium Paint and ramming & painting of poles complete in all respect. | - | Job | 10,702 | - | 1112 |
| 4.01 | Erection of Earthing Set.:- Fixing of earthing pipe of pit for coal earthing, fixing of G.I wire to system filling of pit and remaning work complete in all respect. | - | Nos | 1,509 | - | 1113 |
| 5.01 | Erection of Stay Set HT:- Digging of Pit fixing of Stay Rod, filling of Pit, Nozeiling & Tightning complete in all respect. | - | Set | 1,982 | - | 1114 |
| 6.01 | Stringing and sagging conductor:- Laying of conductor (AAAC 7/3.81 mm 80 mm²) stringing and sagging, binding with insulator complete in all respect. | - | P/w / P/Kms | 20,958.99 | - | 1115 |
| 7.01 | Laying of G.I Wire, Stringing, Sagging and binding complete in all respect. | 1 | Kms. | 4,293.01 | ₹4,288.72 | 1116 |
| 8.01 | Fixing jumper complete in all respect. | - | No. | 207 | - | 1117 |
| 9.01 | Erection of GO switch complete in all respect. | - | No | 13,099.99 | - | 1118 |
| 10.01 | Erection of DO Fuse complete in all respect. | - | Job | 3,320 | - | 1119 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.13 MB
BOQ_200361.xls
BOQ • 7.06 MB
termandconditionm.pdf
Tender Documents • 0.82 MB
additionalterandconditionn.pdf
Additional Documents • 0.39 MB
Download all tender documents and submit your bid