Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.7 LAccepted-Finance | ₹18.7 L | L1 | Accepted-Finance L1 |
| 2 | L2₹18.7 LAccepted-Finance 145 B SOUTH MASI STREET TENKASI DISTRICT | TENKASI | TAMIL NADU | 627412 | ₹18.7 L | L2 | Accepted-Finance L2 |
| 3 | L3₹19.3 LAccepted-Finance | ₹19.3 L | L3 | Accepted-Finance L3 |
| 4 | L4₹19.6 LAccepted-Finance 3 97 RAMAR KOVIL STREET THAPPARAI KADAVALAM AMBUR 635811 | TIRUPATHUR | TAMIL NADU | 635811 | ₹19.6 L | L4 | Accepted-Finance L4 |
| Sl No | Description | Qty | Unit | S Vasanthakumar L1 | SRI NIDHI CONSTRUCTION L4 | Guna Construction L2 | Aravind Construction L3 |
|---|---|---|---|---|---|---|---|
| 1.00Construction of 30000 Litre OHT (12m stagging) at Ragunathapuram in Chinnavarigam Panchayat. | |||||||
| 2.00 | Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation. | 71.09 | Cum | 255.79 ₹18,184.11 | 320.2 ₹22,763.02 | 263 ₹18,696.67 | 270 ₹19,194.30 |
| 3.00 | Supplying and filling in foundation and basement with good sand in layers not more 15 cm thick including ramming, watering and compacting etc.complete complying to standard specification | 3.03 | Cum | 2,100 ₹6,363 | 2,165.62 ₹6,561.83 | 2,165 ₹6,559.95 | 2,165 ₹6,559.95 |
| 4.00 | Cement Concrete 1:4:8 mix using 40 mm HBG metal for foundaion including watering wherever necessary and laid in layers of not more than 15cm thick. Compacting etc. | 4.54 | Cum | 5,522.07 ₹25,070.20 | 5,694.62 ₹25,853.57 | 5,694 ₹25,850.76 | 5,695 ₹25,855.30 |
| 5.00 | Supplying and Fabricating and placing in position MS Steel or ribbed for steel for all reinforced cement concrete works as per the design given including cost of steel and blinding wire all floors etc. | 5.4 | MT | 89,212.9 ₹4.8 L | 92,000.52 ₹5.0 L | 92,000 ₹5.0 L | 93,000 ₹5.0 L |
| 6.00Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical . | |||||||
| 7.00For Plan surface | |||||||
| 8.00 | Below GL | 19.94 | Sqm | 1,061.82 ₹21,172.69 | 1,095 ₹21,834.30 | 1,095 ₹21,834.30 | 1,095 ₹21,834.30 |
| 9.00 | From 0.00 -3.30m | 23.51 | Sqm | 1,061.82 ₹24,963.39 | 1,095 ₹25,743.45 | 1,095 ₹25,743.45 | 1,095 ₹25,743.45 |
| 10.00 | From 5.30m to 6.30 m | 9.54 | Sqm | 1,166.16 ₹11,125.17 | 1,202.6 ₹11,472.80 | 1,202 ₹11,467.08 | 1,202 ₹11,467.08 |
Tender Value
Refer Docs
EMD Value
₹39,000
Closing Date
23 Sept 2025, 3:00 pmClosed
The BDO(BP),Madhanur
The BDO(BP),Madhanur
Tirupathur District Construction of 30000 Litre OHT (12m stagging) at Ragunathapuram in Chinnavarigam Panchayat at Madhanur Block under 15th CFC (BP)- 2025 - 26
2025_RDTN_605624_1
A3/3648140/2025
Open Tender
Civil Works - Others
The BDO(BP), Madhanur
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹39,000
2 Feb 2026
18 Sept 2025
23 Sept 2025
18 Sept 2025
23 Sept 2025
18 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid