Loading…
Loading…
Tender ID
Tender Value
₹12.4 L
EMD Value
₹1.2 L
Closing Date
27 Mar 2026, 12:00 pmClosed
EE CD-1 PWD Chitrakoot
EE CD-1 PWD Chitrakoot
Special repair work of retaining wall at km 2 and 3 of Mau Gurdari link road
2026_CEBAN_1128827_3
368/A-16 Dt. 20-03-2026
Open Tender
Civil Works
Percentage
60 days
EE CD-1 PWD Chitrakoot
Please refer Tender documents.
2 documents required · 2 mandatory
₹860
₹1.2 L
EE CD-1 PWD Chitrakoot
6 Apr 2026
21 Mar 2026
27 Mar 2026
21 Mar 2026
27 Mar 2026
21 Mar 2026
23 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Excavation in foundation in ordinary soil ( Loam clay or sand) including lift up to 1.5 meter (5ft) and lead upto 30m (100ft) and including filling,watering & ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as direction by the Engineer-in-charge upto a distance of 30m(100ft) from the foundation trenches. SI No 251 | |||||
| 2Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8km (5 miles) from the side of work & including watering ,dressing etc. Rate to include cost of all materials,labour and tools & plants,etc. required for proper completion of the work. SI No 255 | |||||
| 3Cement concrete with 4cm (1/2'') gauge approved stone ballast, approved coarse sand. cement in the proportion 8:4:1 including supply of all materials,labour and tools and plants etc. required for proper completion of the work. SI No 281 | |||||
| 4Random course Rubble massonary in 1:4 cement and fine sand mortar in foundation and plinth, including supply of all materials, labour & T&P etc. required for proper completion of the work. (Chapter- 8 (Add item-a) | |||||
| 5Raised pointing with cement and fine sand of 1.25 fineness modulus mortar on brick work in proportion of 1:2 including supply of all materials, labour and tools and plants etc. required for proper completion of the work SI No 577 | |||||
| 6Cement concrete with 20mm gauge approved stone ballast, approved coarse sand. cement in the proportion 4:2:1 including supply of all materials,labour and tools and plants etc. required for proper completion of the work. 279(a) | |||||
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.22 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.88 MB
Tendernotice_2.pdf
PDF • 1.56 MB
BOQ_2105438.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .