Pradhan
Painta - I GP Office, Chhotobainan, Purba Bardhaman
CONSTRUCTION OF CONCRETE ROAD AT SANDHIPUR FROM RAJIBUL ISLAM BARI TOWORDS OMMOR ALI BARI
2026_ZPHD_1017433_1
07/105/P-1/25-26
Open Tender
CIVIL WORKS
Percentage
90 days
Sandhipur
Please Refer NIT Documents
3 documents required · 3 mandatory
₹500
West Bengal Gramin Bank
₹2,950
29 Jul 2026
3 Mar 2026
13 Mar 2026
3 Mar 2026
10 Mar 2026
3 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation ........... including setting out, removing, spreading or stacking ...... including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge.
I. In all sorts of soil excluding marshy soil & rocks (soft or hard) by manual means.a) upto 3 m depth. (iv) Without pumping out water and shoring. | - | CUM | 114 | - |
| 2 | Supplying, spreading and compacting Sand to required thickness, in layers not exceeding 150 mm to proper gradient and camber, inundating each layer by water and packing and ramming layer by layer to achieve desired compaction, including lighting, guarding, barricading and making adequate earthen bundh (By Fine Sand) | 1 | CUM | 668.15 | ₹667.48 |
| 3 | Supplying and laying Polythene Sheet (150gm / sq.m.) | - | SQM | 24 | - |
| 4 | Hire and labour charges for Shuttering with or without staging .......... with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works ............. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction.
Where staging is not required. | 1 | SQM | 214 | ₹213.79 |
| 5 | Providing and laying Design Mix concrete for plain / reinforced concrete work in any part of bridge (excluding bottom plugging) with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control, sampling, testing etc. all complete but excluding cost of labour and materials for formwork & reinforcement works.
M-15 Grade Using concrete mixer. | 1 | CUM | 4,817.59 | ₹4,812.77 |
| 6 | Providing and laying Design Mix concrete for plain / reinforced concrete work in any part of bridge (excluding bottom plugging) with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control, sampling, testing etc. all complete but excluding cost of labour and materials for formwork & reinforcement works.
M-20 Grade Using concrete mixer. | - | CUM | 5,125.95 | - |
| 7 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening ...... cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.
(II. JSW/JSPL/SHYAM/SRMB/BMASL/ELECROSTEEL/SSL) | - | kg | - | - |
| 8 | Labour for Chipping of concrete surface before taking up Plastering work. | - | SQM | - | - |
| 9 | Plaster (to wall, floor, ceiling etc.) With 1:4 cement mortar 10 mm thick plaster | - | SQM | 123 | - |
| 10 | Neat cement punning about 1.5mm thick in wall, floor etc.
NOTE:Cement 0.152 cu.m per 100 sq.m. | - | SQM | 34 | - |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.17 MB
BOQ_2499785.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .