Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.5 LAccepted-Finance | ₹33.5 L | L1 | Accepted-Finance lowest rate |
| 2 | L2₹33.5 L+₹3,346.96 (0.10%)Rejected-Finance | ₹33.5 L+₹3,346.96 (0.10%) | L2 | Rejected-Finance higher rate |
| 3 | L3₹33.5 L+₹5,355.13 (0.16%)Rejected-Finance | ₹33.5 L+₹5,355.13 (0.16%) | L3 | Rejected-Finance higher rate |
Tender Value
₹33.5 L
EMD Value
₹66,940
Closing Date
3 Aug 2026, 5:00 pmClosed
EO NP KANT
OFFICE NP KANT
NAGAR PANCHAYAT KANT MEIN KAMALNAYANPUR TIRAHA PAR GATA SANKHAYA 848, 752 KI BOUNDARY WALL KA NIRMAR KARYA
2026_DOLBU_1168870_1
581/NPK/26-27/1
Open Tender
Civil Works - Others
Percentage
60 days
NP KANT
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,948
NP
₹66,940
10 Aug 2026
13 Jul 2026
4 Aug 2026
13 Jul 2026
3 Aug 2026
13 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Boudary Wall Construction | |||||
| 1.01 | Earth work excavation for foundation or cutting or embankment in ordinary soil including 1.5 lift and 30 m lead SOR 251 (Without royalty) | 177.3 | cum | 195 | ₹34,573.5 |
| 1.02 | concreat with 4cm guage brick ballast fine sand and cement in proportion of 12:6:1 including supply all meterial labours T&P etc….all comp. (SOR No.273 | 25.5 | cum | 3,600 | ₹91,800 |
| 1.03 | R.C.C work with cement corse sand and 20mm graded stone grit in prop. Of 1:1:5:3 in slab incl…. All wok comp. SOR 283 A | 50.97 | cum | 9,045 | ₹4,61,023.65 |
| 1.04 | M.S or iron in plain work such as RCC i/c banding for proper shape and i/c supply of steel &its wastege,band,hooks and aoutherised overlapping shall be measerd and i/c cost of bending wire etc…. All comp. as per PWD schedule item no. 504 | 50.01 | qtl | 8,870 | ₹4,43,588.7 |
| 2.01 | M-150 class brick work in 1:4 cement & fine/corse sand mortar including supply of all material labour T&P etc required for proper completion of the work … all comp. (SOR NO.305 | 78.3 | cum | 5,430 | ₹4,25,169 |
| 2.02 | R.C.C work with cement corse sand and 20mm graded stone grit in prop. Of 1:1:5:3 in slab incl…. All wok comp. SOR 283 A | 10.35 | cum | 9,045 | ₹93,615.75 |
| 3 | M.S or iron in plain work such as RCC i/c banding for proper shape and i/c supply of steel &its wastege,band,hooks and aoutherised overlapping shall be measerd and i/c cost of bending wire etc…. All comp. as per PWD schedule item no. 504 | 10.16 | qtl | 8,870 | ₹90,119.2 |
| 4 | 12mm thik plaster in1:4 cement and fine/coarse sand mortar including all mat… lab. T&P etc… all comp.. (SOR NO. 584) (i) | 82.8 | sqm | 210 | ₹17,388 |
| 5 | providing and applying plaster of paris putty of averege thickness 2cm approved brand and manufacturer etc. all work complete DSR NO. 13.26 | 540 | sqm | 115 | ₹62,100 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.14 MB
T1B.pdf
Tender Documents • 3.57 MB
BOQ_2193365.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .