Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹17.0 L+₹18,051.28 (1.06%)Accepted-AOC KARUR | L2 | Accepted-AOC Addmited | |
| 2 | L1₹17.0 LRejected-AOC | L1 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | K Sundaramoorthy L2 | SPE Construction L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavation for foundation in all soils and sub soils in hard stiff clay, stiff black cotton, hard red earth, shales, murramB13:B56, gravel, stoney earth and earth mixed with small size boulders and to full depth as may be directed,except in hard rock,requiring blasting including shoring and shuttering and bailing out of water wherever necessary,refilling the sides of foundation with excavated earth or sand in layer of not more than 15cm thick.well rammed and consolidated and depositing on bank with initial lead and lift of 10m & initial lift of 2m and depositing the surplusr earth within the compound in places shown by the departmental officers with iniital lead and lifts,clearing and levelling the site etc., complete as per SS20B and as directed by departmental Engineers(TNBP No.20B). | 91 | M3 | 226.45 ₹20,606.95 | 224.08 ₹20,391.28 Lowest |
| 2.00 | Supplying and filling in foudation and basement with Well Gravel in layers of not more than 15cm thick including well rammed watered and consolidated including cost and conveyance of sand to work site from approved sources and including labour charges for all lead, Gravel lift, filling, laying, levelling, watering and compacting including all other incidental charges etc., complete complying with standard specifications(TNBP No.24&25). | 8.5 | M3 | 325.33 ₹2,765.3 | 321.92 ₹2,736.32 Lowest |
| 3.00 | Plain Cement Concrete 1:4:8 mix (One Part Cement, Four Part Fine Aggregate and Eight Part Coarse Aggregate) Using 40mm ISS HBG metal for foundation and basement including dewatering if found necessary and laid in layer of not more than 15cm thick and consolidated including all cost conveyance of materials and labour charges etc. complete as per standard specifications and as directed by departmental Engineers(TNBP No.28). | 12 | M3 | 4,959.65 ₹59,515.8 | 4,907.62 ₹58,891.44 Lowest |
| 4.00 | Supplying and erecting centering for sides and soffits including supports and strutting uptp 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90cmx60cm and 10 gauge stiffened, welded with mild steel angles of size 25mmx25x3mm for boarding laid over silver oak (country wood) joist of size 10cmx6.5cm dia spaced about 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre tocentre etc.complete complying with standard specification and as directed by the departmental engineers. TNBP No.30
For Grade Beam & side wall | 100 | M2 | 581.48 ₹58,148 | 575.38 ₹57,538 Lowest |
| 5.00 | For Lintel,Beam&Slab | 52 | M2 | 643.84 ₹33,479.68 | 637.09 ₹33,128.68 Lowest |
| 6.00 | For Coloumn,Sunshade | 73.44 | M2 | 772.61 ₹56,740.48 | 764.5 ₹56,144.88 Lowest |
| 7.00 | Cement concrete 1:1 1/2:3 (One Part cement, one and half Part M-sand and Three Part aggregate) using machine crushed 20mm gauge hard broken stone jelly for all RCC items of work excluding centering strutting, and reinforcement grills placed in position but including mixing concrete, laying and vibrations charges, curing, etc complete and including providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary etc. complete complying with standard specification( TNBP No:30) | 21.37 | M3 | 8,732.09 ₹1,86,604.76 | 8,640.5 ₹1,84,647.49 Lowest |
| 8.00 | Supplying, fabricating and fixing in position of mild steel Griil Gate and Design Grill, including providing one coat of red oxide primer. The rates shall inclusive of cost of all materials,Conveyence and all labour charges for fixing in position by dismantling the masonry, concrete etc. and redoing the same to the original condition duly packed with concrete etc., complete as per standard specifications and as directed by departmental Engineers | 250 | Kgs | 109.49 ₹27,372.5 | 108.34 ₹27,085 Lowest |
| 9.00 | Supplying, fabricating and placing in position mild steel or ribbed tor steel for all reinforced cement concrete works as per design given including cost of steel and binding wire with all conveyance and lead charges in all floors etc.complete complying with standard specifications and as directed by the deparmental engineers. TNBP No:30 | 2,137 | Kgs | 89.8 ₹1,91,902.6 | 88.86 ₹1,89,893.82 Lowest |
| 10.00 | Brick Work in CM 1:5 (One part of cement & five parts of M- sand) mix using best quality sing new best II Class Bricks of size 9 ” x 4 3/8 “x 2 3/4 ” including cost and conveyance of materials to work site and including all labour charges for mixing, laying, curing the concrete etc., complete as per standard specifications and as directed by departmental Engineers – TNBP No:31
a)Foundation and Basement | 16 | M3 | 6,319.33 ₹1,01,109.28 | 6,253.04 ₹1,00,048.64 Lowest |
Tender Value
₹20.5 L
EMD Value
₹20,500
Closing Date
9 Feb 2024, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE OFFICER
BARGUR TOWN PANCHAYAT
Construction of Toilet Block 15 Seats at Government Grils Higher Secondary School in Bargur Town Panchayat
2024_DTP_417044_1
47/2024/A1
Open Tender
Civil Works
Works
BARGUR TOWN PANCHAYAT
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹20,500
Yes
24 Nov 2026
2 Feb 2024
9 Feb 2024
2 Feb 2024
9 Feb 2024
2 Feb 2024
180 days
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .