Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 LAccepted-AOC 2 206 C PONNAGAR METTUR DAM 636 401 SALEM DISTRICT | SALEM | TAMIL NADU | 636401 | ₹2.5 L Quoted ₹2.6 L | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | SARVESWARASAMY AND CO L1 |
|---|---|---|---|---|
| 1.00 | Charges for Releasing the existing 250 Watts S.V Lamp fittings, Cleaning, Checking, Rectification of wiring circuit, Replacement and Re-fixing 3Nos. of LED aviation obstruction lamp fittings at 2nd Tier of Chimney - I & II | 2 | Nos | 20,500 ₹41,000 |
| 2.00 | Charges for Releasing the existing 250 Watts S.V Lamp fittings, Cleaning, Checking, Rectification of wiring circuit, Replacement and Re-fixing 3Nos. of LED aviation obstruction lamp fittings at 3rd tier at Chimney I & II | 2 | Nos | 27,000 ₹54,000 |
| 3.00 | Charges for Releasing the existing 250 Watts S.V Lamp fittings, Cleaning, Checking, Rectification of wiring circuit, Replacement and Re-fixing 3Nos. of LED aviation obstruction lamp fittings at 4th Tier of Chimney I & II | 2 | Nos | 33,700 ₹67,400 |
| 4.00 | Charges for Releasing the existing 250 Watts S.V Lamp fittings, Cleaning, Checking, Rectification of wiring circuit, Replacement and Re-fixing 3 Nos. of LED aviation obstruction lamp fittings at 5thTier of Chimney II | 1 | Nos | 40,500 ₹40,500 |
| 5.00 | Charges for Releasing the existing 250 Watts S.V Lamp fittings, Cleaning, Checking, Rectification of wiring circuit, Replacement and Re-fixing 3Nos. of LED aviation obstruction lamp fittings at top most tier of Chimney - II | 1 | Nos | 47,300 ₹47,300 |
| 6.00 | Cost of consumables (Lumsum) | 1 | Nos | 5,000 ₹5,000 |
Tender Value
Refer Docs
EMD Value
₹2,200
Closing Date
22 Jan 2025, 2:00 pmClosed
CHIEF ENGINEER/MTPS-I
CHIEF ENGINEER MTPS-I METTUR DAM
MTPS-I ES EMII SDIII - Releasing cleaning,checking, rectification, replacing and refixing of LED based aviation obstruction lamp fittings at top most tiers and releasing existing 250 watts S.V lamp fittings and fixing LED AOL fittings after checking
2025_EB_517275_1
CE-MTPS-I-SE-ES-EM-II-OT 64-2024-25
Open Tender
Electrical Works
35 days
MTPS-I/METTURDAM
AS PER TENDER SPECIFICATION
4 documents required · 4 mandatory
₹0
₹2,200
Yes
10 Mar 2026
7 Jan 2025
23 Jan 2025
7 Jan 2025
22 Jan 2025
7 Jan 2025
7 Jan 2025 - 22 Jan 2025
Amount
Charges for Releasing the existing 250 Watts S.V Lamp fittings, Cleaning, Checking, Rectification of wiring circuit, Replacement and Re-fixing 3Nos. of LED aviation obstruction lamp fittings at 2nd Tier of Chimney - I & II
Charges for Releasing the existing 250 Watts S.V Lamp fittings, Cleaning, Checking, Rectification of wiring circuit, Replacement and Re-fixing 3Nos. of LED aviation obstruction lamp fittings at 3rd tier at Chimney I & II
Charges for Releasing the existing 250 Watts S.V Lamp fittings, Cleaning, Checking, Rectification of wiring circuit, Replacement and Re-fixing 3Nos. of LED aviation obstruction lamp fittings at 4th Tier of Chimney I & II
Charges for Releasing the existing 250 Watts S.V Lamp fittings, Cleaning, Checking, Rectification of wiring circuit, Replacement and Re-fixing 3 Nos. of LED aviation obstruction lamp fittings at 5thTier of Chimney II
Charges for Releasing the existing 250 Watts S.V Lamp fittings, Cleaning, Checking, Rectification of wiring circuit, Replacement and Re-fixing 3Nos. of LED aviation obstruction lamp fittings at top most tier of Chimney - II
Cost of consumables (Lumsum)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid