Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.9 LAccepted-AOC NEAR INDUSTRIAL ESTATE THANDA PADDAR UDHAMPUR J K 182101 | UDHAMPUR | JAMMU AND KASHMIR | 182101 | L1 | Accepted-AOC AS PER BOQ | |
| 2 | L2₹13.8 L+₹1.9 L (15.9%)Rejected-AOC NO 354 2ND CROSS VARADARAJNAGAR VIDYARANYAPURA POST BANGALORE 5600 097 | 5600097 | L2 | Rejected-AOC AS PER BOQ | |
| 3 | L3₹14.0 L+₹2.1 L (17.4%)Rejected-AOC DAYA BAGH SATTANI DHAR ROAD UDHAMPUR DISTT UDHAMPUR J K 182101 | UDHAMPUR | JAMMU AND KASHMIR | 182101 | L3 | Rejected-AOC AS PER BOQ | |
| 4 | L4₹16.6 L+₹4.7 L (39.7%)Rejected-AOC WARD NO 1 HOUSE NO 04 SUBASH NAGAR UDHAMPUR 182101 J K | UDHAMPUR | UDHAMPUR | JAMMU AND KASHMIR | 182101 | L4 | Rejected-AOC AS PER BOQ | |
| 5 | L5₹17.2 L+₹5.3 L (44.6%)Rejected-AOC CHHURTA JHAJJAR KOTLI JAMMU J K 181222 | 181222 | L5 | Rejected-AOC AS PER BOQ |
Tender Value
Refer Docs
EMD Value
₹39,400
Closing Date
9 Mar 2021, 6:00 pmClosed
GE Army Dhar Road Udhampur
GE Army Dhar Road Udhampur
REPAIR, MAINT OF PUMPS, MOTOR, STARTERS, DOZER CHLORINATION PLANT, CLEANING OF SUMP, OHT AND OTHER CONNECTED WORKS AT JINDRAH UNDER GE ARMY DHAR ROAD
2021_MES_420314_1
8066/NIT-68/2020-21
Open Tender
Miscellaneous Works
Item Rate
180 days
Jindrah under GE Army Dhar Road Udhampur
Please refer Tender documents.
5 documents required · 5 mandatory
₹500
Yes
GE Army Dhar Road Udhampur
₹39,400
Yes
25 Jul 2021
9 Feb 2021
11 Mar 2021
9 Feb 2021
9 Mar 2021
22 Feb 2021
9 Feb 2021 - 20 Feb 2021
Amount
Taking proper shut down in writing disconnecting all the electrical connections, dismantling the unserviceable motor any type centrifugal motor with pump from the base plate and pump and shifting the same to approved workshop for repair/rewinding. Dismantling the motor, cutting and removing the old heated up/burnt winding of the stater /rotor, cleaning the slots and replacement of brunt spare parts and reassembling the motor including transportation back the same after rewinding and reassembling, for size of electric motor 50 to 75 HP complete all as specified and directed by Engr -in- Charge. Note:- (a) Rewinding of motor will be measured and paid separately under relevent item. (b) The motor shall be squirrel cage induction/slipring induction motor. (c) The contractor shall reinstall the motor within one week after handing over for repairs failing which a penalty @ Rs. 1000/- per day of delay will be charged from the contractor. (d) The rates quoted shall be deemed to include the cost of loading/unloading, transportation, grease, nuts, bolts and washers of any size and shape as required at site and refixing of motor duly functional and testing at its original location/position complete all as specified and directed. (e) Replacement of unserviceable bearings and greasing them completely. Bearing shall shall be measured and paid separately. (f) Motor shall be dismantled at workshop in presence of JE concern and inspected by the Engineer -in-Charge. A repair note shall be prepared by the contractor which shall be signed by contractor, JE, EIC and counter signed by GE. Winding cut shall be made in presence of EIC.
Taking proper shut down in writing disconnecting all the electrical connections, dismantling the unserviceable motor any type centrifugal motor with pump from the base plate and pump and shifting the same to approved workshop for repair/rewinding. Dismantling the motor, cutting and removing the old heated up/burnt winding of the stater /rotor, cleaning the slots and replacement of brunt spare parts and reassembling the motor including transportation back the same after rewinding and reassembling, for size of electric motor 30 to 40 HP complete all as specified and directed by Engr -in- Charge. Note:- (a) Rewinding of motor will be measured and paid separately under relevent item. (b) The motor shall be squirrel cage induction/slipring induction motor. (c) The contractor shall reinstall the motor within one week after handing over for repairs failing which a penalty @ Rs. 1000/- per day of delay will be charged from the contractor. (d) The rates quoted shall be deemed to include the cost of loading/unloading, transportation, grease, nuts, bolts and washers of any size and shape as required at site and refixing of motor duly functional and testing at its original location/position complete all as specified and directed. (e) Replacement of unserviceable bearings and greasing them completely. Bearing shall shall be measured and paid separately. (f) Motor shall be dismantled at workshop in presence of JE concern and inspected by the Engineer -in-Charge. A repair note shall be prepared by the contractor which shall be signed by contractor, JE, EIC and counter signed by GE. Winding cut shall be made in presence of EIC.
Taking proper shut down in writing disconnecting all the electrical connections, dismantling the unserviceable motor any type centrifugal motor with pump from the base plate and pump and shifting the same to approved workshop for repair/rewinding. Dismantling the motor, cutting and removing the old heated up/burnt winding of the stater /rotor, cleaning the slots and replacement of brunt spare parts and reassembling the motor including transportation back the same after rewinding and reassembling, for size of electric motor 10 to 20 HP complete all as specified and directed by Engr -in- Charge. Note:- (a) Rewinding of motor will be measured and paid separately under relevent item. (b) The motor shall be squirrel cage induction/slipring induction motor. (c) The contractor shall reinstall the motor within one week after handing over for repairs failing which a penalty @ Rs. 1000/- per day of delay will be charged from the contractor. (d) The rates quoted shall be deemed to include the cost of loading/unloading, transportation, grease, nuts, bolts and washers of any size and shape as required at site and refixing of motor duly functional and testing at its original location/position complete all as specified and directed. (e) Replacement of unserviceable bearings and greasing them completely. Bearing shall shall be measured and paid separately. (f) Motor shall be dismantled at workshop in presence of JE concern and inspected by the Engineer -in-Charge. A repair note shall be prepared by the contractor which shall be signed by contractor, JE, EIC and counter signed by GE. Winding cut shall be made in presence of EIC.
Taking proper shut down in writing disconnecting all the electrical connections, dismantling the unserviceable motor any type centrifugal motor with pump from the base plate and pump and shifting the same to approved workshop for repair/rewinding. Dismantling the motor, cutting and removing the old heated up/burnt winding of the stater /rotor, cleaning the slots and replacement of brunt spare parts and reassembling the motor including transportation back the same after rewinding and reassembling, for size of electric motor 5 HP complete all as specified and directed by Engr -in- Charge. Note:- (a) Rewinding of motor will be measured and paid separately under relevent item. (b) The motor shall be squirrel cage induction/slipring induction motor. (c) The contractor shall reinstall the motor within one week after handing over for repairs failing which a penalty @ Rs. 1000/- per day of delay will be charged from the contractor. (d) The rates quoted shall be deemed to include the cost of loading/unloading, transportation, grease, nuts, bolts and washers of any size and shape as required at site and refixing of motor duly functional and testing at its original location/position complete all as specified and directed. (e) Replacement of unserviceable bearings and greasing them completely. Bearing shall shall be measured and paid separately. (f) Motor shall be dismantled at workshop in presence of JE concern and inspected by the Engineer -in-Charge. A repair note shall be prepared by the contractor which shall be signed by contractor, JE, EIC and counter signed by GE. Winding cut shall be made in presence of EIC.
Taking down unserv motor and Rewinding the motor rotor with super enamelled copper winding wire/strip as per existing size and truns etc including all the insulating materials i.e varnish, cotton tape insulating paper and soldering etc of motor capacity 75 to 40 HP complete all as specified and directed by Engr-in-Charge.Note:- (a) Winding cut shall be made in presence of EIC and reassembling shall be done after inspection by the EIC. (b) Rewinding wire of motor will be measured and paid separately under relevent item. (c) The motor shall be squirrel cage induction/slipring induction motor.
Taking down unserv motor and Rewinding the motor rotor with super enamelled copper winding wire/strip as per existing size and truns etc including all the insulating materials i.e varnish, cotton tape insulating paper and soldering etc of motor capacity 30 to 15 HP complete all as specified and directed by Engr-in-Charge.Note:- (a) Winding cut shall be made in presence of EIC and reassembling shall be done after inspection by the EIC. (b) Rewinding wire of motor will be measured and paid separately under relevent item. (c) The motor shall be squirrel cage induction/slipring induction motor.
Taking down unserv motor and Rewinding the motor rotor with super enamelled copper winding wire/strip as per existing size and truns etc including all the insulating materials i.e varnish, cotton tape insulating paper and soldering etc of motor capacity 10 to 5 HP complete all as specified and directed by Engr-in-Charge.Note:- (a) Winding cut shall be made in presence of EIC and reassembling shall be done after inspection by the EIC. (b) Rewinding wire of motor will be measured and paid separately under relevent item. (c) The motor shall be squirrel cage induction/slipring induction motor.
Rewinding the motor stater with super enamelled copper winding wire of existing size and gauge and truns etc including all the insulating materials i.e varnish with suppr high quality of cotton tape, insulating paper and other misc items of motor any capacity all as specified and directed by Engr-in-Charge.Note:- (a) Winding cut shall be made in presence of EIC and reassembling shall be done after inspection by the EIC. (b) Rewinding wire of motor will be measured and paid separately under relevent item. (c) The motor shall be squirrel cage induction/slipring induction motor.
M&L for cleaning of over head tank /under ground sump by scraping/removing all funges, scales, dust, sludge etc from inside of the over head tank and depositing the same to a distance exc 50 mtrs and n.exc. 100 mtrs including washing the walls & bottom of the over head tank with water and disinfection chemical such as bleaching powder etc and writing date of cleaning, CA No and name of contractor with synthetic enamel black/white paint complete for 100000 gallons capacity complete all as specified and directed. (Kali Mata tank)
M&L for cleaning of under ground sump by scraping/removing all funges, scales, dust, sludge etc from inside of the over head tank and depositing the same to a distance exc 50 mtrs and n.exc. 100 mtrs including washing the walls & bottom of the over head tank with water and disinfection chemical such as bleaching powder etc and writing date of cleaning, CA No and name of contractor with synthetic enamel black/white paint complete for 40000 Ltrs capacity complete all as specified and directed. (Gandira)
All as per item No 10 above but of capacity 35000 ltr (Location -Gandira)
All as per item No 10 above but of capacity 10000 Ltrs (Location Tawi pump house 02 Nos) and Bansoo pump house.
All as per item No 10 above but of capacity 50000 Ltrs (Location 12 Nos pump house 02 Nos)
All as per item No 10 above but for sedimentation tank of capacity 1,25,000 ltrs (location post No 12 pump house)
All as per item No 10 above but of sedimentation tank capacity 30000 Ltrs (Location-12 No pump house 02 Nos)
All as per item No 10 above but of capacity 1,25,000 Ltrs (Location-Booster pump house)
All as per item No 10 above but of capacity 1,12,500 Ltrs (Location-Booster pump house)
All as per item No 10 above but of capacity 2,25,000 Ltrs (Location-Booster pump house clearifluctor tank)
Preparation and painting of surface of siluce valve/air valve/NRV any size 150 mm to 400 mm bore and applying one coat of synthetic enamel paint of requisite colour complete all as specified and directed by Engr-in-Charge
Supply and fixing in replacement of sets of bearings for 5 to 15 HP H.P motor of end carriage drive complete all as specified and directed.
All as per item No 19 above but bearing for 20 to 30 HP pump/motor
All as per item No 19 above but bearing for 40 to 75 HP pump/motor
M&L for structural work fabricated from structural , steel section including nut,bolts,washers including cutting/ welding in any position, any shape and drilling hole for bolts in any size and shape as per site requirement or directed and inclusive of one primer coat of red oxide and one finish coat of synthetic enamel black paint including welding work for repair of SMC tank structure complete all as per specified and directed.
Supply & fixing in replacement of old unserv starter by Automatic Star Delta starter consisiting of ampmetre,voltmetre,indicator lamp,ON/OFF push button,TP MCB etc suitable for motor pump set of capacity 75 H.P. including making all electric connection complete all as specified. Make - Havells Cosmic star / C&S/Bentex/ L&T/BCH or any make as approved by GE
Supply & fixing in in replacement of old unserv starter by Automatic Star Delta starter consisiting of ampmetre,voltmetre,indicator lamp,ON/OFF push button,TP MCB etc suitable for motor pump set of capacity 40 H.P. including making all electric connection complete all as specified. Make - Havells Cosmic star / C&S/Bentex/ L&T/BCH or any make as approved by GE
Supply & fixing in replacement of old unserv starter by Automatic Star Delta starter consisiting of ampmetre,voltmetre,indicator lamp,ON/OFF push button,TP MCB etc suitable for motor pump set of capacity 30 H.P. including making all electric connection complete all as specified. Make - Havells Cosmic star / C&S/Bentex/ L&T/BCH or any make as approved by GE
Supply & fixing in replacement of old unserv starter by Automatic Star Delta starter consisiting of ampmetre,voltmetre,indicator lamp,ON/OFF push button,TP MCB etc suitable for motor pump set of capacity 20 H.P. including making all electric connection complete all as specified. Make - Havells Cosmic star / C&S/Bentex/ L&T/BCH or any make as approved by GE
Supply & fixing in replacement of old unserv starter by Automatic Star Delta starter consisiting of ampmetre,voltmetre,indicator lamp,ON/OFF push button,TP MCB etc suitable for motor pump set of capacity 10 H.P. including making all electric connection complete all as specified. Make - Havells Cosmic star / C&S/Bentex/ L&T/BCH or any make as approved by GE
Repair and Maint of automatinc star delta starter, decarbonised of all contects, relay,thimbles etc and cleaning, making good, tightning of all cables, wires and other connected items oiling in moving macnisiam etc incl replacement of burnt parts as requirment basis all as specified and directed for 75 starter complete all as specified and directed .
Repair and Maint of automatinc star delta starter, decarbonised of all contects, relay,thimbles etc and cleaning, making good, tightning of all cables, wires and other connected items oiling in moving macnisiam etc incl replacement of burnt parts as requirment basis all as specified and directed for 50HP starter complete all as specified and directed .
Repair and Maint of automatinc star delta starter, decarbonised of all contects, relay,thimbles etc and cleaning, making good, tightning of all cables, wires and other connected items oiling in moving macnisiam etc incl replacement of burnt parts as requirment basis all as specified and directed for 15 HP starter complete all as specified and directed .
Supply only Flat water proof submersible cable 3 core copper conductor, PVC insulated 1100 volts grade stranded 10 Sqmm , ISI marked and connected to pump motor through water tight sealing joints complete all as specified. Make: National Cables / Finolex / Havell's/Plaza
Supply & Fixing ML - 3 Type three Pole Power contactor having 02 NC & 02 NO auxilary contacts, AC operated of coil voltage 230 Volt, 50 Hz AC 3 rating 40 A, ACI Rating 45A complete all as specified and directed.Cat no. SS90721 of Make - L&T or its equivalent in Havells/ Legrand/Schneider as approved by GE
Supply & Fixing ML - 4 Type three Pole Power contactor having 02 NC & 02 NO auxilary contacts, AC operated of coil voltage 230 /415 Volt, 50 Hz AC 3 rating 70 A, ACI Rating 100A Cat no. SS90910 of Make - L&T or its equivalent in Havells/ Legrand/Schneider as approved by GE
Supply & Fixing in replacement of weighted Suction Line Strainer 3/8 '' suitable forcalcium hypochloride Dosing Pump complete all as specified.
Supply & Fixing in replacement of Injection Check valve 3/8 ''suitable for calcium hypochloride Dosing Pump complete all as specified.
Supply & fixing in repair of digital panel mounted AC Amp meter, three phase in 96 x 96 mm square size, flush mounted case, accuracy class - 0.5 incl current transformer suitable size complete all as specified and directed .
Supply & fixing in repair of digital panel mounted AC Volt meter , three phase in 96 x 96 mm square size, flush mounted case, accuracy class - 0.5 complete all as specified and directed .
Servicing , repairing and over hauling of flaculator including replacement of chain and gear box including oiling greasing and making good as serviceable condition all as specified and directed ( Note :- repairing of flaculator for both tank sedimentation and pre sedimentation tank seperatly)
Servicing repairing and over hauling of slip ring for flaculator all as specified and directed.
Painting and Preparation of surface of steel section incl complete moving bridge and structure of clarifloculator tank and applying two coat after rubbing of rusted surface of synthetic enamel paint including marking all sign of requisite colour complete all as specified and directed by Engr-in-Charge
Repairing of clarifloculator rubber pading (wheel), bearing, chain, motor and overhauling complete and cleaning well mentained all as specified and directed Note rubber padding taken seperately
Replacement of rubber padding of clarifloculator all as specified and directed
Painting of pump motor set, pump etc of applying two coat of synthetic enamel paint after rubbing of rusted surface including marking all sign of requisite colour complete all as specified and directed by Engr-in-Charge
Replacement of old unserviceavle water supply header by MS pipe 300 mm dia heavy duty, 6 Mtr long flanged ended dumy plates coverd with nut and bolts including electric welding of following sizes pipes for connection of inlet and outlets :- (a) Inlet pipe 150 mm dia suitable length alongwith flanged joints and connection of both pipes -01 No. (b) Outlet pipe 100 mm dia suitable size with flanged joint and connection of all pipes -03 Nos (c ) Outlet pipe 80 mm dia suitable size length with flanged joints and connection of all pipes - 03 Nos (d) Outlet pipe 50 mm dia suitable size length with flanged joints and connection of all pipes - 03 Nos (e) Outlet pipe 25 mm dia suitable size length with flanged joints and connection of all pipes - 02 Nos
Replacement of old unserviceavle water supply header by MS pipe 300 mm dia heavy duty, 6 Mtr long flanged ended dumy plates coverd with nut and bolts including electric welding of following sizes pipes for connection of inlet and outlets :- (a) Inlet pipe 100 mm dia suitable length alongwith flanged joints and connection of both pipes --01 No. (b) Outlet pipe 80 mm dia suitable size length with flanged joints and connection of all pipes -- 01 Nos (d) Outlet pipe 50 mm dia suitable size length with flanged joints and connection of all pipes -- 06 Nos (e) Outlet pipe 25 mm dia suitable size length with flanged joints and connection of all pipes -- 02 Nos
PCC (1:4:8) type D-2 using 40mm graded aggregate as in foundation for filling in, mass concrete for foundation of motor, pump, header etc complete all as specified and directed.
PCC (1:3:6) type C-2 using 40mm graded aggregate as in foundation for filling in, mass concrete for foundation of motor, pump, header etc complete all as specified and directed.
PCC (1:2:4) type B-1 using 20mm graded aggregate as in coping of motor, pump, header etc, including necessary form work complete all as specified and directed
S&F in replacement of double flanged sluice valve of size 80 mm bore class PN 1.6 confirming to IS 14846/2000 with stainless steel spindle including replacement of worn out rubbersheet nut, bolts and washers complete
S&F in replacement of double flanged sluice valve of size 150 mm bore class PN 1.6 confirming to IS 14846/2000 with stainless steel spindle including replacement of worn out rubbersheet nut, bolts and washers complete
S&F in replacement of double flanged sluice valve of size 100 mm bore class PN 1.6 confirming to IS 14846/2000 with stainless steel spindle including replacement of worn out rubbersheet nut, bolts and washers complete
S&F in replacement of double flanged sluice valve of size 50 mm bore class PN 1.6 confirming to IS 14846/2000 with stainless steel spindle including replacement of worn out rubbersheet nut, bolts and washers complete
M & L GI flange joint 150 mm bore 6/8 holes with rubber packing ring using suitable size nuts, bolts and washers, welding work complete to join two pipe all as specified and as directed .
All as per item No 35 but 100 mm dia
All as per item No 35 but 80 mm dia
S&F in replacement of double flanged Non return valve of size 150 mm bore including replacement of worn out rubbersheet nut, bolts and washers complete. Make- kirloskar/ upadhayay/ GDPA/BIR
S&F in replacement of Air release valve of size 150mm double flanged including taking down old unserviceable complete all as specified and directed. Make Kirlosker/Upadhaya/BIR
Excavation in trenches, for laying of pipe line not exceeding 1.5 mtr wide and not exceeding 1.5 meter in depth and getting out in soft/ loose soil complete all as specified and as directed.
Removing excavated material n.exc. 50 mtr and depositing where directed at a level n.exc. 1.5 mtr above the starting point complete all as specified and directed
Returning filling in, including spreading, levelling, watering and well ramming in layers not exceeding 25 cm thick in soft/ loose soil complete all as specified and directed.
Taking out old existing GI water tubing lines and connected unserviceable pipe and fitting includidng segregation of serviceable pipe and fittings and keep in safe custody and reuse serviceable pipe line and fitting from tranch/ in ground/under road /under PCC path etc the site of work complete all as specified and as directed of the following bore size :- Note : Earth work will be considered seperatly
150 mm dia
100 mm dia
M&L for GI water tubing medium grade and laid in trenches/floors with running fittings complete all as specified and directed of following sizes :-Make of GI Water Tubing medium grade - TATA/JINDAL/SURYA PRAKASH., Make of GI FITTINGS- Only ISI marked Fittings.
150 mm dia
100 mm dia
S S BUILDERS
M/SHansrajbuilder
DAVINDER SINGH
MandeepConstructionCo
R K BUILDERS
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .