CPO-SOUTH ZONE
THIS TENDER IS FLOATED FOR CIVIL WORKS IN HUBLI LPG PLANT. EVALUATION CRITERIA
2600028080-HD-07750
5100028080
Open Tender
Two Bid
Unknown (Unspecified Location)
₹0
₹2 L
16 Oct 2026
16 Oct 2026
30 Oct 2026
30 Oct 2026
17 Oct 2026 - 22 Oct 2026
| Item No | Item Title | Description | Qty | Unit |
|---|---|---|---|---|
| 1 | SURFACE DRESSING,SITE | SURFACE DRESSING,SITE — "SURFACE DRESSING OF THE GROUND INCLUDING REMOVING SMALL PLANTS, BUSHES ,VEGETATION (DIA LESS THAN 4"") AND MAKING SURFACE LEVELLED AND DISPOSAL OF RUBBISH OUTSIDE HPCL'S PREMISES TO AN UNOBJECTIONABLE PLACE, AS DIRECTED BY THE ENGINEER IN CHARGE." | - | square meter |
| 2 | EXCAVATION,F/FNDTN,GRND | EXCAVATION,F/FNDTN,GRND — "Excavation for foundation upto required depth below existing ground level up to 1.5m in any tyoe odf soil except hard rock. Rate to include dressing the sides and bottom, bailing out of water if encountered, shoring, strutting, backfilling after the construction of foundation, trenches/plinth beam etccompacting by the side of the foundation and disposal of surplus excavated earth within/outside HPCL's premises to an unobjectionable place, as directed by the Engineer in Charge including spreading, watering and compaction, complete. The measurement of the excavation would be based on actual depth of excavation with applicable rate for different depths. | - | cubic meter |
| 3 | EXCAVATION,F/FNDTN,GRND | EXCAVATION,F/FNDTN,GRND — "Excavation for foundation upto required depth below ground level in any type of soil except hard rock . Rate to include dressing the sides and bottom, bailing out of water if encountered, shoring, strutting, backfilling after the construction of foundation, foundation, trenches/plinth beam etc compacting by the side of the foundation and disposal of surplus excavated earth within/outside HPCL's premises to an unobjectionable place, as directed by the Engineer in Charge including spreading, watering and compaction, complete . The measurement of the excavation would be based on actual depth of excavation with applicable rate for different depths.EXCAVATION IN EARTH UPTO 3 M | - | cubic meter |
| 4 | EXCAVATION,F/FNDTN,BTWN | EXCAVATION,F/FNDTN,BTWN — "Excavation for foundation upto required depth below ground level in any type of soil except hard rock . Rate to include dressing the sides and bottom, bailing out of water if encountered, shoring, strutting, backfilling after the construction of foundation, compacting by the side of the foundation and disposal of surplus excavated earth within/outside HPCL's premises to an unobjectionable place, as directed by the Engineer in Charge including spreading, watering and compaction, complete . The measurement of the excavation would be based on actual depth of excavation with applicable rate for different depths. EXCAVATION IN EARTH BETWEEN 3 TO 4.5 | - | cubic meter |
| 5 | SAND FILLING - LAYERS | SAND FILLING - LAYERS — SUPPLY AND FILLING WITH CLEAN SILVER / RIVER SAND OF APPROVED QUALITY IN LAYERS OF 150 MM EACH INCLUDING SPREADING, COMPACTING BY HAND RAMMING AND WATERING ETC, ALL COMPLETE AS PER DIRECTION OF ENGG.-IN-CHARGE. MEASUREMENT BASIS COMPACTED THICKNESS ONLY. | - | cubic meter |
| 6 | SUPPLY&FILLING,CRSHD STN | SUPPLY&FILLING,CRSHD STN — "SUPPLY AND FILLING WITH CRUSH SAND AS PER IS 21116-1980-2 & IS 486:2000 & IS 383.1970 THE PARTICLE SHAPE IS SEMI ROUNDED OR CUBICAL & NOT FLAKEY OR ELONGATED. DUST PERCENTAGE IS STRICTLY CONTROLLED 10 - 15% WITH FINENESS MODULUS 2.6 TO 3. SUPPLY AND FILLING WITH STONE CRUSHED SAND OF APPROVED QUALITY IN LAYERS OF 150 MM EACH INCLUDING SPREADING, COMPACTING BY HAND RAMMING AND WATERING ETC, ALL COMPLETE AS PER DIRECTION OF ENGG.-IN-CHARGE. COMPACTED THICKNESS ONLY." | - | cubic meter |
| 7 | MURRUM FILLING LAYERS- | MURRUM FILLING LAYERS- — SUPPLYING AND FILLING GOOD QUALITY MURUM IN LAYERS OF 150 MM THICK INCLUDING WATERING AND COMPACTING TILL MAXIMUM COMPACTION IS ACHIEVED AS DIRECTED BY ENGINEER IN CHARGE.COMPACTED VOLUME SHALL BE CONSIDERED FOR PAYMENT | - | cubic meter |
| 8 | SUPPLY&FILLING,IMPORTED | SUPPLY&FILLING,IMPORTED — "Supplying and filling imported earth of approved quality in layers not exceeding compacted thickness of 200mm incl. Watering ,ramming, compacting, and if required, rolling and re-rolling with power roller , mechanical compactors of 80KN- 100 KN capacity to achieve maximum compaction, all complete as per direction of Engg.-In- Charge. The earth should be free from weeds, grass and other objectionable debris. Black Cotton soil shouldn't be used. Measurement basis compacted thickness only. Rate shall include conducting compaction test as per tech spec. | - | cubic meter |
| 9 | PCC 1:4:8 | PCC 1:4:8 — PROVIDING AND LAYING PCC 1:4:8 USING 40 MM AND DOWN SIZE GRADED STONEAGGREGATES INCLUDING MACHINE MIXING, PROVIDING FORMWORK IF REQUIRED, PLACING, COMPACTING BY HAND RAMMING , CURING ETC COMPLETE. | - | cubic meter |
| 10 | PCC 1:3:6 | PCC 1:3:6 — PROVIDING AND LAYING PCC 1:3:6 USING 20 MM AND DOWN SIZE GRADED STONE AGGREGATES INCLUDING MACHINE MIXING, PROVIDING FORMWORK IF REQUIRED, PLACING, COMPACTING BY HAND RAMMING, CURING ETC COMPLETE. | - | cubic meter |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
2600028080-HD-07750.pdf
TENDER_DOCUMENT • 5.21 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .