| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.0 LAccepted-AOC | ₹7.0 L | L1 | Accepted-AOC lowest rate |
| 2 | L2₹10.9 LRejected-Finance S F NO 472 C3 VINAYAGA GARDEN SUKKALIYUR KARUR 639 003 | KARUR | KARUR | TAMIL NADU | 639003 | ₹10.9 L | L2 | Rejected-Finance Highest value |
| Sl No | Description | Qty | Unit | RMITHA POWER AND INFRA (OPC) PRIVATE LIMITED L1 | Nagul Power Developers L2 |
|---|---|---|---|---|---|
| 1.00Materials | |||||
| 2.00 | 22 KV HT AB cable of size 3x95 Sq.mm (Phase) + 1x95 Sq.mm Bare messenger (Inclusive of 5% Sag). | 0.33 | Each | 10,45,000 ₹3.4 L | 14,95,000 ₹4.9 L |
| 3.00 | Suspension clamp Assembly including pole clamp | 9 | Each | 790 ₹7,110 | 1,150 ₹10,350 |
| 4.00 | Dead end clamp/ Anchor clamp assembly including brackets, pole clamps | 4 | Each | 785 ₹3,140 | 1,450 ₹5,800 |
| 5.00 | End Termination kits | 4 | Each | 1,850 ₹7,400 | 5,255 ₹21,020 |
| 6.00Transport of poles/Materials/ conductors and other materials (excluding loading and unloading charges.) | |||||
| 7.00 | Below 8 Kms | 1 | Each | 250 ₹250 | 2,800 ₹2,800 |
| 8.00 | Transporting of poles from road side to pole pit including loading and inloading of poles by using JCB or manual upto 100m | 36 | Each | 340 ₹12,240 | 150 ₹5,400 |
| 9.00 | Loading & Unloading of poles upto 27" | 36 | Each | 240 ₹8,640 | 350 ₹12,600 |
| 10.00 | Excavation of pole pit up to 9.14 Mtr pole | 36 | Each | 380 ₹13,680 | 700 ₹25,200 |
Updated dates
Tender Value
Refer Docs
EMD Value
₹7,600
Closing Date
22 Dec 2025, 2:30 pmClosed
SE/SEDC/Udayapatty/Salem
O/o The SE/SEDC/SALEM
Specification for Works Contract for Erection of new 22 KV Belur Town feeder fed from Belur 22 KV SS with urban status to minimize the length, and the line loss of Mangalapuram Water works feeder of Singapuram 22 KV SS by sharing the load in
2025_EB_627400_1
SE/SEDC/WC.35/25-26dt13.11.25
Open Tender
Electrical and Maintenance Works
365 days
Valapady
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹7,600
6 Mar 2026
28 Nov 2025
23 Dec 2025
29 Nov 2025
22 Dec 2025
29 Nov 2025
Amount
Materials
22 KV HT AB cable of size 3x95 Sq.mm (Phase) + 1x95 Sq.mm Bare messenger (Inclusive of 5% Sag).
Suspension clamp Assembly including pole clamp
Dead end clamp/ Anchor clamp assembly including brackets, pole clamps
End Termination kits
Transport of poles/Materials/ conductors and other materials (excluding loading and unloading charges.)
Below 8 Kms
Transporting of poles from road side to pole pit including loading and inloading of poles by using JCB or manual upto 100m
Loading & Unloading of poles upto 27"
Excavation of pole pit up to 9.14 Mtr pole
Erection of Poles
PSC/ RCC poles/Metal poles above 8.00m by using JCB or manual
Dismantling of pole (7.5m and 8.0mtr)
Dismantling of pole & Pole pit and loading & unloading of grills (9.0 mtr & above)
Erection of stay set complete
Stay pit 4.5” to 5” depth
Fixing of Line Materials
Fixing of Aluminium knob
LT single Phase cross arm
LT 3 Phase cross arm
Concreting of poles:
Sleeve concreting including materials (Cement + River Sand/ Msand and Blue metals and watering)
Earthing of pole with coil earthing including burying looping and binding.
Earthing of Pole
Stay Concreting including cost of materials and labour 375mmx375mmx50mm
Fixing of HT Pin Insulators (11/22 KV)
Fixing of HT 22KV stain disc
HT / LT TI Fitting
Tapping Channel Cross arm
Fixing of "V" cross arms
Fixing of LT Pin Insulators
Dismantling of 22 KV pin Insulator
Dismantling of 22 KV Strain Disc
Dismantling of "V" cross arms
Dismantling of Tapping Channel Cross arm
Dismantling of HT/LT TI Fitting
Paving and stringing of conductor
Releasing of ACSR/AAAC conductors from conductor drum and coiling 7/2.59, AAAC 7/2.50, ACSR 7/3.35, 7/3.15 MM
7/3.35mm ACSR 7/3.15mmAAAC
Miscellaneous works
Releasing of grills from RCC Poles
Erection of D.P. structure with AB switch, top channel, cross bracing, earthing, painting, providing stay including concreting
22 KV HT AB cable of size 3x95 Sq.mm (Phase) + 1x95 Sq.mm Bare messenger (Inclusive of 5% Sag).
Suspension clamp Assembly including pole clamp
Dead end clamp/ Anchor clamp assembly including brackets, pole clamps
End Termination kits
G.S.T. @18% should be Entered by the Bidder
Nagul Power Developers (BID ID -1541260)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.08 MB
BOQ_750105.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid