Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.4 LAccepted-AOC R O WARD NO 08 H NO 108 DHAR ROAD UDHAMPUR TEHSIL DISTT UDHAMPUR 182101 | UDHAMPUR | UDHAMPUR | JAMMU KASHMIR | 182101 | L1 | Accepted-AOC OK | |
| 2 | L2₹22.1 L+₹66,000 (3.08%)Rejected-Finance 6 RAILWAY STATION ROAD ONKAR INDUSTRIES GULAMALI PURA BAHRAICH UTTAR PRADESH 271801 | BAHRAICH | UTTAR PRADESH | 271801 | L2 | Rejected-Finance Other than L1 | |
| 3 | L3₹23.2 L+₹1.8 L (8.21%)Rejected-Finance | L3 | Rejected-Finance Other than L1 | |
| 4 | L4₹23.8 L+₹2.3 L (10.8%)Rejected-Finance JAJJAR KOTLI JAMMU J K 151222 | JAMMU | JAMMU | J K | 151222 | L4 | Rejected-Finance Other than L1 | |
| 5 | L5₹24.2 L+₹2.8 L (12.8%)Rejected-Finance | L5 | Rejected-Finance Other than L1 |
Tender Value
₹24.9 L
EMD Value
₹49,800
Closing Date
19 Mar 2020, 6:00 pmClosed
GE UTILITIES
GE UTILITIES UDHAMPUR PO GARHI PIN 182121 UDHAMPUR
Outsourcing for manning and operation of Electric operated lift/Elevator at bldg No P/23 block Ashok Vihar Chuni Lal Vihar bldg No P-1 Old Medical Complex bldg No P-55 and Jib Enclave bldg No P-305 to P-308 under GE Utilities Udhampur
2020_MES_311879_3
GE/U-51/2019-20
Open Tender
Miscellaneous Works
Item Rate
330 days
UDHAMPUR
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE UTILITIES UDHAMPUR
₹49,800
Yes
16 May 2020
29 Feb 2020
21 Mar 2020
29 Feb 2020
19 Mar 2020
12 Mar 2020
Amount
Outsourcing for Manning and Operation of electrically operated passenger lift Make:ThyssenKrupp (India) Pvt.Ltd. in two shifts per day (each shift of 08 (Eight) hrs continuous duration operated by one operator in each shift) for 01 (One) No. lift installed at Ashok Vihar,Bldg No.P/23,brief description of lift as under:- (a) One lift capacity 884 kg (13 passengers). (b) Speed 01 mtr per/sec ground to fifth floor (six stops) i.e ground floor, Ist floor, 2nd floor, 3rd floor, 4rth floor, 5th floor. (c) 3phse 415volt 50cycle per/sec power supply system. (d) Lift control Panel. (e) ELD (Emergency landing devices with control UPS). (f) Ac induction motor 9kw,1440RPM, (g) LT Panel Note:- (i) Contractor will employ one operator per shift (Total 02 (Two) Operators per day) to operate the lift and DG set during failure of electric supply on all working days, holidays and sundays. (ii) Timing of shifts will be fixed by Engr-in-Charge.
Outsourcing for Manning and Operation of electrically operated passenger lifts 02 (Two) Nos Make:ThyssenKrupp (India) Pvt.Ltd. in two shifts per day (each shift of 08 (Eight) hrs continuous duration operated by one lift operator in each shift) for both lifts installed to be operated at Chuni Lal Vihar Bldg No.P-1, brief description of lift /elevator No.1 & 2 are as under :- Lift No: 01 (a) One lift capacity 884 kg (13 passengers). (b) Speed1mtr per/sec ground to six floor (seven stop) i.e ground floor, Ist floor, 2nd floor, 3rd floor, 4rth, 5th floor, 6th floor. (c) Battery operated alarm bell and emergency light with battery. (d) 3phse 415volt 50cycle per/sec power supply system. (e) Lift control Panel. (f) ELD (Emergency landing devices with control UPS). (g) Ac induction motor 9kw,1440RPM. (h) LT Panel
Lift No: 02 (a) One lift capacity 544 kg (08 passengers). (b) Speed1mtr per/sec ground to six floor (seven stops) i.e ground floor ,Ist floor, 2nd floor, 3rd floor, 4rth floor, 5th floor, 6th floor & 7th floor. (c) Battery operated alarm bell and emergency light with battery. (d) 3phse 415volt 50cycle per/sec power supply system. (e) Lift control Panel. (f) ELD (Emergency landing devices with control UPS). (g) Ac induction motor 5.5kw,1440RPM, (h) LT Panel Note:- (i) Contractor will employ one operator per shift (Total 02 (Two) Operators per day) to operate the lift /elevator during failure of electric supply on all working days, holidays and sundays. (ii) Timing of shift will be fixed by Engr-in-Charge.
Outsourcing for Manning and Operation of electrically operated passenger lifts 02 (Two) Nos Make:ThyssenKrupp in two shifts per day (each shifts of 08 (Eight) hrs continuous duration operated by one lift operator in each shift) for both lifts installed to be operated at Old Medical Complex Bldg No.P-55,brief description of lift /elevator No.1 & 2 are as under:- Lift No: 01 (a) One lift /elevator capacity 884 kg (13 passengers) (b) Speed 01 mtr per/sec ground to six floor (seven stops) i.e ground floor ,Ist floor, 2nd floor, 3rd floor,4rth floor, 5th floor, 6th floor. (c) Battery operated alarm bell and emergency light with battery. (d) 3phse 415volt 50cycle per/sec power supply system. (e) Lift control Panel. (f) ELD (Emergency landing devices with control UPS). (g) Ac induction motor 9kw,1440RPM. (h) LT Panel.
Lift No: 02 (a) One lift /elevator capacity 544 kg (08 passengers) (b) Speed 1 mtr per/sec ground to six floor (seven stops) i.e ground floor ,Ist floor, 2nd floor, 3rd floor, 4rth floor, 5th floor, 6th floor. (c) Battery operated alarm bell and emergency light with battery. (d) 3phse 415volt 50cycle per/sec power supply system. (e) Lift control Panel. (f) ELD (Emergency landing devices with control UPS). (g) Ac induction motor 5.5kw,1440RPM, (h) LT Panel. Note:- (i) Contractor will employ one operator per shift (Total 02 (Two) Operators per day) to operate the lift and DG set during failure of electric supply on all working days, holidays and sundays. (ii) Timing of shift will be fixed by Engr-in-Charge.
Outsourcing for Manning and Operation of electrically operated passenger lifts 02 (Two) Nos Make:ThyssenKrupp in two shifts per day (each shifts of 08 (Eight) hrs continuous duration operated by two lift operators in each shift for both lifts installed to be operated at Jib Enclave Bldg No P-305 to 308, brief description of lift /elevator No.1 & 2 are as under:- Lift No: 01 (a) One lift /elevator capacity 884 kg (13 passengers) (b) Speed 01 mtr per/sec ground to six floor (seven stops) i.e ground floor ,Ist floor, 2nd floor, 3rd floor,4rth floor, 5th floor, 6th floor. (c) Battery operated alarm bell and emergency light with battery. (d) 3phse 415volt 50cycle per/sec power supply system. (e) Lift control Panel. (f) ELD (Emergency landing devices with control UPS). (g) Ac induction motor 9kw,1440RPM. (h) LT Panel.
Lift No: 02 (a) One lift /elevator capacity 544 kg (08 passengers) (b) Speed 1 mtr per/sec ground to six floor (seven stops) i.e ground floor ,Ist floor, 2nd floor, 3rd floor, 4rth floor, 5th floor, 6th floor. (c) Battery operated alarm bell and emergency light with battery. (d) 3phse 415volt 50cycle per/sec power supply system. (e) Lift control Panel. (f) ELD (Emergency landing devices with control UPS). (g) Ac induction motor 5.5kw,1440RPM, (h) LT Panel. Note:- (i) Contractor will employ two operators per shift (Total 04 (Four) Operators per day) to operate the lift and DG set during failure of electric supply on all working days, holidays and sundays. (ii) Timing of shift will be fixed by Engr-in-Charge.
Note for item 1 to 4: (i) The contractor will ensure suitable replacement of Electrician/FGM/Lift Operator while on leave/weekly holidays and Wages for the same deemed to be included in the quoted rate against each item above. (ii) The contractor shall ensure that electricians/ operator always be present in each shift. (iii) The contractor shall be responsible for maintaining the complete area (i.e. inside boundary wall) such as building, hard standing, foothpath etc in neat and clean position. All necessary T&P for cutting /cleaning of grass and vegetation will be arranged by contractor without any extra cost. (iv) The contractor shall provide uniform , raincoat, protective clothing such as hand gloves ,helmet, safety belt , first aid box and shoes etc to all persons on duty and the cost of the same is deemed to be included in quoted rate of item here in before. The uniform shall have the name of the contractor and MES written on the shirt Pocket (Left and right side). The name of individual shall also be printed on the right hand side of the shirt.
(v) Person employed operator should have as lift operator. (vi) The contractor shall provide log sheet and maintain the same on daily basis and the cost of the same is deemed to be included unit rate quoted here in before. (vii) The contractor shall produce details of the individual like Name, Aadhar No, Aadhar linked Bank A/c No, Experience certificate within a week of Acceptance of tender for verification of Engineer-in-charge. The work will be commenced only after submission of requisite documents of the individual. (viii) THE CONTRACTOR SHALL MAKE PAYMENT TO HIS STAFF EMPLOYED FOR THIS WORK EVERY MONTH, ACCOUNTED FOR, FROM THE DATE OF COMMENCEMENT OF THE WORK AND SUBMIT TO THE ENGINEER-IN-CHARGE FOR VERIFICATION OF BANK STATEMENT/INDIVIDUAL’S PASS BOOK AS A PROOF OF PAYMENT. IF THE CONTRACTOR FAILS TO SUBMIT THE BANK STATEMENT/INDIVIDUAL’S PASS BOOK WITHIN 07 (SEVEN) DAYS OF DUE DATE OF PAYMENT A PENALITY OF RS 2000.00 PER DAY SHALL BE RECOVERED FROM THE CONTRACTOR.
MOHAN LAL AND SONS
proach associates
BARU ENTERPRISES
PREM NATH KHAJURIA AND SONS
SHARMA SALES CORPORATION
M/S Builders Indias
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .