Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹22.0 LAccepted-Finance | 1 | Accepted-Finance Accepted | |
| 2 | 2₹24.8 L+₹2.9 L (13.0%)Rejected-Finance | 2 | Rejected-Finance Rejected | |
| 3 | 3₹25.0 L+₹3.0 L (13.6%)Rejected-Finance | 3 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | BHARDWAJ CONTRACTOR L1 | M/s Mohsin Ahmad Thekedar L2 | M/S IMRAN AHMAD L3 |
|---|---|---|---|---|---|---|
| 1.00 | Dewatering before and during work. | 319 | Hours | 150 ₹47,850 Lowest | 230 ₹73,370 | 240 ₹76,560 |
| 2.00 | Earth work Excavation with Poclain Machine/Manual etc. | 4,964.84 | Cum. | 90 ₹4,46,835.6 Lowest | 100 ₹4,96,484 | 102 ₹5,06,413.68 |
| 3.00 | Extra for Slush and Lehal excavation complete. | 6,506.22 | Cum. | 140 ₹9,10,870.8 Lowest | 150 ₹9,75,933 | 150 ₹9,75,933 |
| 4.00 | Cartage for surplus Excavated soil and slush upto 1.00Km. | 6,581.21 | Cum. | 23.4 ₹1,54,000.31 Lowest | 45 ₹2,96,154.45 | 45 ₹2,96,154.45 |
| 5.00 | Dressing and Compaction work of Bunds | 4,889.85 | Cum. | 7 ₹34,228.95 Lowest | 13 ₹63,568.05 | 13 ₹63,568.05 |
| 6.00 | Earth work excavation in ordinary soil Lift upto 1.5 m & lead upto 30 m & including filling, watering and ramming of excavated earth in Pacca Work | 107.23 | Cum. | 80 ₹8,578.4 Lowest | 85 ₹9,114.55 | 85 ₹9,114.55 |
| 7.00 | Providing and Laying of Cement Concrete in 1:3:6 with Cement, Coarse Sand and 40mm Gauge Stone Ballast in foundation Complete in All Respect | 19.68 | Cum. | 6,500 ₹1,27,920 | 5,000 ₹98,400 Lowest | 5,000 ₹98,400 Lowest |
| 8.00 | Supply and laying , Fixing in position the alignment of NP-3, Hume Pipe Complete in all respect. (R.C.C. Hume Pipe Size 900mm) NP-03 (S & S) | 10 | Mtr. | 4,500 ₹45,000 Lowest | 5,200 ₹52,000 | 5,200 ₹52,000 |
| 9.00 | Supply and laying , Fixing in position the alignment of NP-3, Hume Pipe Complete in all respect. (R.C.C. Hume Pipe Size 600mm) NP-03 (S & S) | 5 | Mtr. | 4,000 ₹20,000 | 2,572 ₹12,860 Lowest | 2,572 ₹12,860 Lowest |
| 10.00 | Masonary work in First Class150 Bricks in 1:4 Cement and Coarse Sand Mortar in foundation and Plinth including all Complete. | 32.08 | Cum. | 4,500 ₹1,44,360 Lowest | 4,690 ₹1,50,455.2 | 4,690 ₹1,50,455.2 |
Tender Value
₹26.3 L
EMD Value
₹2.6 L
Closing Date
9 May 2025, 11:00 amClosed
EE MI SAHARANPUR
EE MI SAHARANPUR
RENOVATION OF POND AT KHASRA NO.710 IN VILLAGE-SOHAJANI TAGAN, BLOCK-SHAHAPUR DISTT-MUZAFFARNAGAR (E-10-4/2025-26)
2025_UPMID_1033698_4
L.NO. 129 DATED 16.04.2025 RENOVATION OF POND AT DISTT-MUZAFFARNAGAR AS PER T.NO. 10/2025-26
Open Tender
Civil Works - Water Works
Item Rate
90 days
MUZAFFARNAGAR
Please refer Tender documents.
3 documents required · 3 mandatory
₹854
EE MI SAHARANPUR
₹2.6 L
EE MI SAHARANPUR
20 Jan 2026
29 Apr 2025
9 May 2025
29 Apr 2025
9 May 2025
29 Apr 2025
30 Apr 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .