| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.7 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹36.9 L+₹3.2 L (9.47%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | Rejected-Technical MANDI DISTT MANDI HP | MANDI | HIMACHAL PRADESH | 175001 | - | Rejected-Technical Non responsive |
Tender Value
₹28.8 L
EMD Value
₹57,600
Closing Date
7 Feb 2022, 5:00 pmClosed
Executive Engineer Chamba Division HPPWD Chamba
Executive Engineer Chamba Division HPPWD Chamba
Providing Cross Drainage work on Kiri Athluin road Km. 0/0 to 2/0 (SH Construction of wing wall at Rd.0/110 to 0/135)
2022_PWD_56118_1
NO.PWC-WA-II 13823-22 dated 18.1.22
Open Tender
Civil Works
Item Rate
120 days
chamba
Please refer Tender documents.
10 documents required · 10 mandatory
₹1,500
₹57,600
17 Mar 2022
27 Jan 2022
8 Feb 2022
27 Jan 2022
7 Feb 2022
27 Jan 2022
Amount
Earth work in excavation for all type of road structure such as retaining walls, breast walls, culverts, drains and parapets etcetera in all type of classification of soil, comprising of ordinary soil, ordinary rock , hard rock chiseling / wedging out rocks (where blasting is prohibited) as per drawings and MORD technical specification clause 305.1 and as per the directions of the Engineer-in-Charge including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal of materials upto any lead and upto any lift including dressing of sides and bottom and back filling in trenches with excavated suitable / approved materials to the original surface in layers not exceeding 150mm one hundred fifty millimeters) compacted thickness including shoring and strutting and pumping and bailing out water (surface and sub soil water) upto any depth and any quantum of water including cleaning of slush which may arise out during dewatering as per directions of Engineer-in-Charge including carriage of materials within all leads, lifts and other incidentals. The rate including the octroi, royality, Malkana, toll tax, GST or any other taxes imposed by the Government.
Providing and laying mechanically mixed and vibrated plain cement concrete 1:5:10 ( One cement is to five sand is to ten graded crushed stone aggregate 40mm (forty millimeter) nominal size in or under water including pumping or bailing out water( surface and sub soil water), dewatering for all heights /depths and any quantum of water including removal of slush which may arise at the time of laying under water for all heights/ depths, including the cost of form work and curing for 14 ( fourteen) days complete in Retaining walls and Breast walls etcetera as per drawings and MORD technical specification section 802, 900 and 1200 and as directed by the Engineer-in-Charge, including carriage of materials within all leads, lifts and other incidental. The rate including the octroi, royality, Malkana, toll tax, GST or any other taxes imposed by the Government.
Providing and laying mechanically mixed and vibrated plain cement concrete 1:4:8 ( One cement is to four sand is to Eight graded crushed stone aggregate 40mm (forty millimeter) nominal size in or under water including pumping or bailing out water( surface and sub soil water), dewatering for all heights /depths and any quantum of water including removal of slush which may arise at the time of laying under water for all heights/ depths, including the cost of form work and curing for 14 ( fourteen) days complete in Retaining walls and Breast walls etcetera as per drawings and MORD technical specification section 802, 900 and 1200 and as directed by the Engineer-in-Charge, including carriage of materials within all leads, lifts and other incidental. The rate including the octroi, royality, Malkana, toll tax, GST or any other taxes imposed by the Government.
Random rubble stone masonry with hard stones of approved quality in foundation and plinth in cement mortar 1:6 (one cement is to six sand) for structure like retaining walls, breast walls, wing walls, toe walls, abutment and similar works etcetera, in all heights complete as per drawing and technical specification clause 702, 704,1202 and 1203 and as directed by the Engineer-in-Charge, including carriage of materials within all leads, lifts and other incidental. The rate including the octroi, royality, Malkana, toll tax, GST or any other taxes imposed by the Government.
Construction of dry random rubble dry stone masonry for retaining walls, breast walls, revetment walls and parapets etc. for sub structure and super structure complete as per technical specification clause 1704.6 & 1302.5 . The rate including the octroi, royality, Malkana, toll tax, GST or any other taxes imposed by the Government.
Back filling behind abutments, return walls, wing walls and retaining walls etc. complete as per drawings and MORD technical specification clause 1204.3.8 or as directed by the Engineer-in-Charge, including carriage of materials within all leads, lifts and other incidental. The rate including the octroi, royality, Malkana, toll tax, GST or any other taxes imposed by the Government.
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 and as directed by the Engineer-in-Charge, including carriage of materials within all leads, lifts and other incidental. The rate including the octroi, royality, Malkana, toll tax, GST or any other taxes imposed by the Government .
Rana Enterprices
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .