Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.2 CrAdmitted-Finance PLOT NO 4 A SHOP NO 03 SECTOR 12 A KOPARKHAIRNE NAVI MUMBAI 400 709 | THANE | MAHARASHTRA | 400709 | L1 | Admitted-Finance | ||
| 2 | L2₹1.2 Cr+₹1.2 L (1.01%)Admitted-Finance AT JASAI JASAI URAN RAIGAD MAHARASHTRA 400702 | RAIGAD | MAHARASHTRA | 400702 | L2 | Admitted-Finance | ||
| 3 | L3₹1.2 Cr+₹5.2 L (4.48%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹1.4 Cr+₹21.7 L (18.8%)Admitted-Finance 3RD FLOOR HARI PANDAV PATH TAL URAN DIST RAIGAD 400702 | URAN | RAIGAD | MAHARASHTRA | 400702 | L4 | Admitted-Finance | ||
| 5 | L5₹1.7 Cr+₹50.5 L (43.7%)Admitted-Finance PLOT NO 492 MARKET YARD SAHAKAR NAGAR PANVEL DIST RAIGAD MAHARASHTRA 410206 | PANVEL | RAIGAD | MAHARASHTRA | 410206 | L5 | Admitted-Finance |
Tender Value
₹1.7 Cr
EMD Value
₹4.1 L
Closing Date
6 Jun 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Chief General Manager (PPD)
Administration Building, JNPA, Sheva, Navi Mumbai
Construction of service road from Solid Waste Management plant to Jaskhar village road at JN Port
2025_JNPT_859345_1
PPD/DGM-I/Road/T- 21/2025
Open Tender
Civil Works - Roads
Percentage
180 days
Jawaharlal Nehru Port Authority
Please refer Tender documents.
5 documents required · 5 mandatory
₹11,800
Jawaharlal Nehru Port Authority
₹4.1 L
6 Aug 2025
9 May 2025
9 Jun 2025
9 May 2025
6 Jun 2025
9 May 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing earthwork in embankment with approved materials obtained from other sources upto lead of 5Km. including all lifts, laying in layers of 20cm. to 30cm. thickness breaking clods, dressing to the required lines, curves, grades & section, watering and compaction with vibratory roller with V-Sat attachment to achieve not less than 97% of standard proctor density etc. complete ( Material obtained from Other sources) | 3,150 | Cum | 831 | ₹26,17,650 |
| 2 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting with Vibratory roller. to the required density. By Mechanical Means - Grading I (Using Screening Type A (13.2) mm Aggregate) | 490 | Cum | 2,218 | ₹10,86,820 |
| 3 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting with vibratory roller to the required density. By Mechanical Means - Grading II (Using Screening Type B (11.2 mm) Aggregate) | 490 | Cum | 2,180 | ₹10,68,200 |
| 4 | Providing and constructing 75 mm. thick Modified Penetraction Macadam (MPM) road surface including all materials, preparing the existing road surface, spreading 40 mm. stone layers metal 100% crusher broken metal with conical crusher plant , heating and spraying the bitumen of specified grade @ 2 kg / sqm , spreading 12mm.size chips compacting with three wheel static roller having weight 8 to 10 MT. to achive the desired degree of compaction as per Technical Specification Clause 506 etc.complete, including applying tack coat of specified grade of bitumen at the rate of 0.30 Kg Sqm. on existing bitumen surface. (VG-30 bulk bitumen rates are considered to arrive at rates) | 4,880 | Sqm | 289 | ₹14,10,320 |
| 5 | DENSE BITUMINOUS MACADAM: Proving and laying dense bituminous macadam using crushed aggregates of Grading 1, premixed with bituminous binder VG-30 Bitumen @ 4.50 per cent by weight of total mix and filler, transported to site with VTS , laid over a previously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired density for 76-100 mm compacted thickness .USING 80 TPH Batch mix type hot mix plant with SCADA, Sensor Paver, Intelligent Compactor with compaction analyzer and V-Sat attachment with Stone Dust filler. | 500 | Cum | 9,664 | ₹48,32,000 |
| 6 | BITUMINOUS CONCRETE:- Providing and laying bituminous concrete using crushed aggregates of grading 1, premixed with bituminous binder @ 5.20 per cent by weight of total mix and filler, transported to site with VTS , laid over a previously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired compaction for 50 mm compacted thickness with specified grade of Bitumen,Excluding prime / tack coat. For Bitumen of specified grade -- USING Batch mix type hot mix plant with SCADA, Sensor Paver, Vibratory roller with Stone Dust filler. (VG-30 bulk bitumen rates are considered to arrive at rates) | 200 | Cum | 10,599 | ₹21,19,800 |
| 7 | Providing and applying tack coat on the prepared surface heating by fames in Boiler and spraying bitumen set footed in bitumen boller on B.T. surface 2.5 kg/10 sqm.(VG-30 bulk bitumen rates are considered to arrive at rates) | 4,880 | Sqm | 18 | ₹87,840 |
| 8 | Providing and Laying hot applied thermoplastic road marking strip on Bituminous Surface of specified shade/ colour of 2.5 mm thick including 1.5 Refractive index reflectorizing glass beads @ 250gm/sqm .Thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC 35:2015. Initial Dry reflectivity RL shall be > 250 mcd/sqm/lux measured in the initial 7 days and sustained reflectivity RL of 100 mcd/sqm/ lux and Qd of 100 mcd/sqm/ lux measured at the end of 2 years by means of a Standard Reflectometer of Zehntner, Easylux, Delta make capable of measuring RL & QD both according to IRC 35:2015 clause 15.5. The finished surface to be level, uniform, and free from streaks and holes complete as per direction of Engineer-in-charge and in accordance with applicable specifications.(Refer MORTH Clause 803 for technical Specification and Performance for IRC 35:2015). | 215 | Sqm | 666 | ₹1,43,190 |
| 9 | Providing dry/ trap/ granite/ quartzite/ gneiss rubble stone soling 15 cm to 20 cm thick including hand packing and compacting etc. complete | 1,965 | Cum | 1,382 | ₹27,15,630 |
| 10 | Providing and laying Cast in situ/Ready Mix cement concrete in M15 of trap/ granite/quartzite/gneiss metal for foundation and bedding / steps including steel centering, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing uneven and honeycombed surface and curing etc. complete. The Cement Mortar 1:3 plaster is considered for rendering uneven and honeycombed surface, only. Newly laid concrete shall be covered by gunny bag, plastic, tarpaulin etc. (Wooden centering will not be allowed.),with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade | 5.5 | Cum | 6,359 | ₹34,974.5 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tender_document_Final.pdf
Tender Document • 2.44 MB
Tendernotice_1.pdf
Tender Document • 0.32 MB
BOQ_903434.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .