Loading…
Loading…
Tender ID
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.6 LAccepted-AOC | L1 | Accepted-AOC Lowest rate Quoated by Maki Construction L1 | |
| 2 | L2₹29.7 L+₹12,385.39 (0.42%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | malaiammanconstruction L2 | Maki Construction L1 |
|---|---|---|---|---|---|
| 1.00 | 1.Construction of Community Hall at Vatamalaipalayam AD Colony H/O Sengodampalayam | 1 | no | - | - |
| 2.00 | Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B | 38.58 | cum | 260 ₹10,030.8 Lowest | 260 ₹10,030.8 Lowest |
| 3.00 | Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete. | 15.41 | cum | 5,530 ₹85,217.3 | 5,500 ₹84,755 Lowest |
| 4.00 | Filling with excavated earth including all labour charges as per standard specification. | 16.99 | cum | 45.85 ₹778.99 Lowest | 45.85 ₹778.99 Lowest |
| 5.00 | Supplying & Erecting centering for sides & soffits including necessary supports & strutting up to 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle of size 25 x 25 x 3mm for boarding laid over silver oak joists Country wood) of size 10 x 6.5cm spaced @ about 90cm c/c and supported by casuarinas props of 10 - 13cm dia. spaced @ 75cm c/c etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.for the following items | 1 | Sqm | - | - |
| 6.00 | Centering for Below ground level | 44 | Sqm | 547.5 ₹24,090 Lowest | 547.5 ₹24,090 Lowest |
| 7.00 | Centering for column | 57.6 | Sqm | 1,204.5 ₹69,379.2 Lowest | 1,204.5 ₹69,379.2 Lowest |
| 8.00 | Roof slab,Lintel Beam | 72.39 | Sqm | 1,204.5 ₹87,193.76 Lowest | 1,204.5 ₹87,193.76 Lowest |
| 9.00 | Sunshade | 4.88 | Sqm | 1,204.5 ₹5,877.96 Lowest | 1,204.5 ₹5,877.96 Lowest |
| 10.00 | Supplying and Fabrication Steel rainforcement including all cost and conveyance etc complete | 3.23 | MT | 91,963.6 ₹2,97,042.43 | 91,000 ₹2,93,930 Lowest |
Tender Value
Refer Docs
EMD Value
₹30,000
Closing Date
11 Mar 2026, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER (BP)
Block Development Officer (BP) Kundadam
Construction of Community Hall at Vatamalaipalayam AD Colony H/O Sengodampalayam
2026_RDTN_671062_1
635/2025/A6/MPLAD
Open Tender
Civil Works
Works
180 days
Kundadam
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹30,000
Yes
12 Mar 2026
5 Mar 2026
11 Mar 2026
5 Mar 2026
11 Mar 2026
6 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 1.Construction of Community Hall at Vatamalaipalayam AD Colony H/O Sengodampalayam | 1 | no | - | - |
| 2 | Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B | 38.58 | cum | - | - |
| 3 | Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete. | 15.41 | cum | - | - |
| 4 | Filling with excavated earth including all labour charges as per standard specification. | 16.99 | cum | - | - |
| 5 | Supplying & Erecting centering for sides & soffits including necessary supports & strutting up to 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle of size 25 x 25 x 3mm for boarding laid over silver oak joists Country wood) of size 10 x 6.5cm spaced @ about 90cm c/c and supported by casuarinas props of 10 - 13cm dia. spaced @ 75cm c/c etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.for the following items | 1 | Sqm | - | - |
| 6 | Centering for Below ground level | 44 | Sqm | - | - |
| 7 | Centering for column | 57.6 | Sqm | - | - |
| 8 | Roof slab,Lintel Beam | 72.39 | Sqm | - | - |
| 9 | Sunshade | 4.88 | Sqm | - | - |
| 10 | Supplying and Fabrication Steel rainforcement including all cost and conveyance etc complete | 3.23 | MT | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_806456.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.32 MB
technocumpricebid.pdf
Tender Documents • 2.20 MB
addtionaldocument.pdf
Additional Documents • 0.24 MB
BOQ_806456.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .