Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹43 L
EMD Value
₹86,000
Closing Date
14 Dec 2026, 6:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
GE Alwar
Alwar
REPAIR/MAINTENANCE OF STP, SEWAGE WELL, EOT CRANE AND OTHER MISCELLANEOUS WORKS AT ITARANA CANTT, ALWAR
2026_MES_799781_1
8597/E8
Open Tender
Miscellaneous Works
Item Rate
270 days
Alwar
As per NIT
6 documents required · 6 mandatory
₹500
GE Alwar
₹86,000
Yes
21 Nov 2026
21 Nov 2026
16 Dec 2026
21 Nov 2026
14 Dec 2026
6 Dec 2026
21 Nov 2026 - 5 Dec 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | M&L for complete dewatering, cleaning and desludging of the Bar and Screen Chamber units of Sewage Treatment Plant (STP) at MAP Quarters Complex, Itarana Cantt, including draining out of water and removal of raw sewage, accumulated sludge, scum, floating matter, settled solids and other deposits by suitable manual and/or mechanical means using sludge pumps, submersible pumps, vacuum tankers, hoses and other necessary equipment; collection, loading and transportation of sewage/sludge in leak-proof, covered tankers/vehicles outside Military Domestic (MD) land and disposal at an authorised sewage treatment/disposal facility in accordance with applicable statutory and environmental requirements; scraping and removal of adhering sludge, scale and deposits from internal walls, floors and bottom surfaces of chambers/tanks using suitable steel brushes, scrapers and tools; thorough washing and flushing of cleaned surfaces with water; disinfection of internal surfaces using approved bleaching powder/chlorine-based disinfectant at the prescribed concentration; removal of residual sludge, debris and wash water; preparation of internal and external surfaces and application of suitable approved protective paint/coating compatible with the substrate and sewage exposure conditions, including all materials, labour, machinery, pumps, hoses, tankers, transportation, disposal charges, cleaning agents, disinfectants, painting materials, tools, tackles, safety equipment, PPE, gas monitoring, ventilation, barricading and all incidental operations required for completion. The work shall be carried out without causing damage to existing civil structures, pipelines, screens, pumps, motors, diffusers, electrical installations or other STP components. All sewage/sludge shall be handled and disposed of without spillage, leakage or environmental contamination. The contractor shall submit documentary evidence of authorised disposal, including disposal receipts/acknowledgements and details of transportation, wherever applicable. After completion, each unit shall be left thoroughly cleaned, disinfected, free from accumulated sludge and debris, with specified surfaces duly painted/coated and fit for further operation, complete, all as specified and directed by the Engineer-in-Charge:- | 3 | Each Job | - | - |
| 2 | All as per preceding item, but Equalisation Tank. | 3 | Each Job | - | - |
| 3 | All as per preceding item, but Reactor/SBR Tank. | 3 | Each Job | - | - |
| 4 | All as per preceding item, but Treated Water Tank. | 3 | Each Job | - | - |
| 5 | All as per preceding item, but Sludge Drying Bed. | 3 | Each Job | - | - |
| 6 | M&L for complete dewatering, cleaning and desludging of sewage well, including draining out of water and removal of muck, sludge, silt, mud and other accumulated deposits under all conditions, including foul and unhygienic conditions, by suitable manual and/or mechanical means; collection, lifting, loading and transportation of raw sewage and sludge outside Cantonment limits in covered, leak-proof vehicles/trolleys and disposal at an authorised/approved disposal site; thorough scraping of internal surfaces of walls and bottom of the sewage well using suitable steel brushes, scrapers and tools, followed by cleaning and washing with water and high-grade bleaching powder for disinfection; cleaning of the surrounding and accessible areas affected during the operation; preparation and painting of internal and external surfaces of the sewage well, including all necessary materials and labour; supply and fixing of one chain pulley block set of 10 m lift, complete with necessary chain, hooks, suspension arrangements and accessories, for lifting and lowering one sewage sludge pump, including all necessary tools, plants, tackles, equipment, safety appliances, protective clothing, transportation and disposal charges, and all incidental operations required for completion. NOTE for item no. 1 to 6:-The contractor shall make his own arrangements for all tools and plant (T&P), machinery and equipment, which shall not be supplied by the department. The quoted rate shall include working in foul, hazardous and unhygienic conditions and provision of adequate safety measures for all personnel. The contractor shall be responsible for insurance, compensation and liabilities arising out of any accident or mishap involving his personnel or third parties during execution of the work. Any damage to existing equipment, pipelines, structures or services caused due to negligence or improper workmanship of the contractor shall be made good by the contractor at his own cost, to the satisfaction of the Accepting Officer. complete all as specified and directed by the Engineer-in-Charge. | 10 | Each Job | - | - |
| 7 | M&L for maintenance, treatment and monitoring of raw sewage by dosing Sodium Hypochlorite liquid solution of 9% concentration in the required and specified quantity, as determined by periodic testing and monitoring of wastewater, for reduction of pollution levels and treatment of wastewater to achieve the prescribed limits suitable for horticultural/arboricultural use, including supply, storage, handling, dosing, mixing and all necessary arrangements, complete, all as specified and directed by the Engineer-in-Charge. | 3,500 | Ltr | - | - |
| 8 | All as per preceding item, but using Gur in solid form. | 200 | Kg | - | - |
| 9 | All as per preceding item, but using Lime in powder form. | 300 | Kg | - | - |
| 10 | All as per preceding item, but using Alum. | 300 | Kg | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
Tender8597.pdf
Tender Documents • 1.15 MB
BOQ_897458.xls
BOQ • 0.59 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .