Tender Value
₹16.4 L
EMD Value
₹33,000
Closing Date
27 Jun 2026, 4:00 pmClosed
AMC Muncipal Corporation Adityapur
Kalpanapuri, Adityapur
Constructon of PCC Road from house of Rajesh Jha to yogesh Pandey ii. Laying of hume pipe and paver block from house of Sourav Jha to Dr. Dadan via. Pramod gali and Subhash Gali in ward no. 29 Under AMC
2026_UDD_115425_42
UDD/AMC/01/2026-27
Open Tender
Civil Works
Percentage
90 days
Ward No. 29
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
₹33,000
Yes
2 Jul 2026
22 Jun 2026
29 Jun 2026
22 Jun 2026
27 Jun 2026
22 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation for laying of different types and sizes of R.C.C. spun pipes with disposal of excavated earth within intial lead and lift as per specification and direction of E/I. (I). For classification of soil item-A (3.3.1) | 130.56 | Per M3 | 239.74 | ₹31,299.26 |
| 2 | Earth work in excavation in foundation trenches in ordinary soil ( vide classification of soil item A) and disposal of excavated earth as obtained to a distance of 50m including all lifts, levelling, ramming the foundation trenches, removing roots of the tree, shrubs all cpmplete as per approved design, building specifications and directions of E/l …..do….do….. specification and direction of E/I. Extra for earthwork in hard soil.[BCD SOR -5.1.1+5.1.2 ] | 245.03 | Per M3 | 167.33 | ₹41,000.03 |
| 3 | Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not excluding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled material up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately . [RCD SOR -2.06 ] | 46.48 | Per M3 | 442.6 | ₹20,570.28 |
| 4 | Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. (DSR 16.83) | 504.23 | Per M2 | 107.51 | ₹54,208.54 |
| 5 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site,spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per direction of Engineer-in-charge (i) Rate per cum for grading-II Material [ SOR RCD 4.01] | 34.86 | Per M3 | 1,458.8 | ₹50,849.39 |
| 6 | Providing course clean sand in filling in foundation tranches or in plinth including ramming and watering in layer not exceeding 150 mm thick with all leads and lifts including cost of all materials, labour, royalty and taxes all complete as per building a specification and direction of E/1.[5.1.10] bcd 2022 | 29.74 | Per M3 | 589.51 | ₹17,530.85 |
| 7 | Providing, supplying & spreading of stone dust in filling in foundation tranches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of material, labour,royalty and taxes all complete as per specifications and directions of E/I. ( mode of measurement compacted volume) RCD 4/M004 | 64.78 | Per M3 | 347.85 | ₹22,533.03 |
| 8 | Providing designation 75B one brick on flat soling joints filled with local sand including cost of watering taxes royality all complete. buiniding specifiacation and as per direction of E/I.(5.6.3) | 130.01 | Per M2 | 330.34 | ₹42,947.5 |
| 9 | NP2 RCC Hume pipe with collar as per ISS 458-1971 (v)300 mm dia. …..do…do…direction of E/I. [BCD M300, P-103] | 169.5 | Per M | 510 | ₹86,445 |
| 10 | Labour for Laying, fitting and fixing NP2 RCC spun pipe with collar in lines, levels, grade and providing approved joining materials …..do…do…direction of E/I. [JSOR DWSD-3.3.6.4] 300mm dia. R.C.C. Spun pipe | 169.5 | Per M | 361.9 | ₹61,342.05 |
stage.html
html • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.21 MB
terms_conditions.pdf
Tender Documents • 0.39 MB
BOQ_156090.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].